Practice Experience of Manufacturing Department
Release time:
2023-03-21
As a staff member of Huang Ping Peak Marketing Department, I learned the production process and product shipment in the manufacturing department last August, which was divided into three stages.
Phase I: The Environmental Security Department organized us to carry out cross-departmental transfer safety learning, and the Manufacturing Department conducted production safety education and learning. Safety education was carried out on the illegal phenomena and safety accidents that often occur at the operation site, which made me understand the prevention knowledge of safety accidents, cases such as occupational injury factors and on-site safety operation requirements. I should dress strictly according to the production requirements.
Phase II: Be familiar with the performance and process of each equipment and understand the role of relevant raw materials in production during equipment maintenance. During the kiln ignition production, I followed the shift to understand the actual production, which links and deviations have an impact on the quality of clinker and cement and the corresponding emergency treatment measures. For example, in the process of cement clinker production, limestone, sandstone, leaf rock, clay, iron and other raw materials are required according to the batching requirements. After being measured by belt weighing, preliminary detection and feedback are carried out through cross-belt online analyzer to the measuring scale for dynamic fine adjustment, they enter the raw material roller for grinding according to the control standard, providing the basis for kiln calcination. After metering, the raw coal enters the coal vertical mill for grinding, and the quality control requirements of the mill are adjusted in time according to the characteristics of the coal and the calcination of the kiln, so as to facilitate the calcination of the kiln. In addition, the raw meal homogenized in the raw meal homogenization warehouse is metered and transported to the preheater for step-by-step preheating, decomposition and collection into the kiln. The decomposed material undergoes calcination in the rotary kiln to form qualified clinker and then enters the grate cooler for cooling. The key to cooling is to ensure that the quality of the clinker does not change, and once again the waste heat recovery and utilization. The cooled clinker is stored in the clinker warehouse to prepare for cement grinding. This is the clinker production process in the two grinding a burning. And cement grinding is cement manufacturing cement grinding is the final process of cement manufacturing, but also the most power consumption process. The production process for the cement clinker, desulfurization gypsum, grinding aids, fly ash, coal gangue and other materials according to the requirements of the measurement with grinding products to meet the market demand, the main control indicators are fineness, specific surface area, setting time, strength and so on.
Phase III: Cement delivery is also divided into three points. The first is to understand the significance of cement multi-point alternate feeding, the second is to be familiar with the cement delivery process, cement coding and spray code control, and finally to understand the work flow and function of production equipment.
After the 24-day production practice, I have a deeper understanding of the basic knowledge of cement production. Through the practical study of the technological process and mechanical equipment of the new dry cement production, I am more familiar with the characteristics and quality advantages of the products. This internship is to improve my comprehensive ability, strengthen my understanding of quality, improve the ability to work, but also understand the production will be applied to the new process, new technology, new equipment. At the same time to improve and strengthen the sense of teamwork, collaboration is the basis for the successful completion of the work. (Le Chao Chao)
More information
The company organized "charity one day donation"
On the morning of October 22, in the lobby on the first floor of Jianfeng Building, all cadres and employees of the group headquarters and subordinate enterprises working in Jianfeng Building participated in the 2021 "Charity Day Donation" activity to offer their love to Jinhua charity. In the next few days, the company's subordinate enterprises also organized "charity one-day donation" activities one after another.
2021
11-01
The company organizes new employee induction training
"Growth is more important than success. I hope everyone can become the backbone and pillars of the peak as soon as possible." On September 2, Yu Jianhong, general manager of the group company, put forward ardent hopes in the face of new employees. On the 2nd and 3rd, the group company organized induction training for new employees recruited in the past year. The group company chairman Jiang Xiaomeng, general manager Yu Jianhong and other leaders and relevant department heads gave lectures to them.
2021
09-13
Daye Peak: Typical Regional Industrial Green Development
On August 23, Huangshi Radio and Television Station broadcast the special program of "Strengthening Overall Planning and Promoting Energy Saving and Emission Reduction in Industrial Field". Daye Jianfeng Cement Company, as a typical enterprise with outstanding achievements in establishing green factories and energy saving and emission reduction in Huangshi area, appeared in the program.
2021
09-01
Yunnan Peak Helps Border Epidemic Prevention and Control
On August 22, Yunnan Peak Cement Company, through the Red Cross Society of Pu'er City and the Epidemic Prevention Headquarters of Pu'er City, donated vacuum insulation pots with a total value of 800000 yuan to the four border counties for the prevention and control of the new coronary pneumonia epidemic in the border area, and supported the prevention and control of the epidemic at the border with practical actions.
2021
09-01
Group Party Committee to Learn "July 1" Important Speech
On August 13, the party committee of the group company held a special meeting to collectively study General Secretary Xi Jinping's important speech at the celebration meeting of the 100 anniversary of the founding of the Communist Party of China, convey the requirements of the party committee at a higher level, and make arrangements for organizing party members of the company to study the "July 1" speech.
2021
08-23
Spike Ranked 2020 China's Top 100 Cement Clinker Production Capacity
Recently, the company received the "2020 China Cement Clinker Production Capacity Top 100" plaque issued by China Cement Network. The ranking of China's top 100 cement clinker production capacity is organized and evaluated by China Cement Network, an authoritative information platform for the domestic cement industry. It is released according to the actual clinker production capacity of each cement enterprise at the end of last year. The company has been ranked in the top 100 list for many consecutive years.
2021
08-23