Yunnan Peak Replacing Kiln Tail Chimney
Release time:
2023-03-04
News from our newspaper # February 8 , with the completion of the welding of the last section of pipeline, the replacement of the kiln tail chimney of Yunnan Jianfeng Cement Company was successfully completed.
When Yunnan Peak inspected the steel plate of kiln tail chimney in November of 2022 , it was found that the thickness was reduced by 2-3 mm compared with that of 2021 , and it was necessary to replace it. In addition, according to the continuous 5 years of testing data analysis, it is found that the corrosion is weak below the inlet of the tail exhaust fan. In order to save costs, after discussion, it was decided that the replacement chimney should be replaced upward from , 25, 19 meters. For those below , 25, 21 meters, anti-corrosion treatment should be carried out during the next kiln shutdown to ensure that the service life matches the newly replaced part. After various understanding, in 2022
10, Yunnan Jianfeng determined the supplier and arrival time of the materials used for replacement through bidding, and worked out a set of construction plan through communication with the hoisting master and the construction team in the early stage: use 600 ton truck crane, and use the inner cylinder to hoist into the construction platform first when dismantling, after cutting 8 wire rope holes and fixing 4 wire ropes, the crane places the construction platform at 1 m below the required slit and fixes it firmly. The cutting can be lifted out. When installing a new chimney, the lowest construction platform is cut for splicing and welding, and so on. Since some iron plates are composite plates, 2.5 mm corrosion-resistant stainless steel plates are bonded to ordinary steel plates. In order to ensure that the stainless steel plates are not damaged, the old breathable cloth is used to be wound on the pressure roller of the plate bending machine for protection. Special lifting workpieces are used in the manufacturing process to ensure that the inner cylinder is not damaged. In order to ensure the welding quality, plates above 10 mm shall be beveled on one side. Each transverse seam and vertical seam shall be welded on both sides and each weld shall be inspected. Only after approval can the next section be hoisted and butted. According to the hoisting scheme, it is divided into 4 sections, and the hoisting weight and construction position corresponding to each section are calculated to control the length. 2 May 3 , the crane was assembled in the factory and dismantled in the afternoon of
4. Due to the difficulty of docking the old and new pipes, the deformation of the original pipe is large, and the docking time exceeds the expected time. For the sake of construction safety, Yunnan Jianfeng communicated with the construction unit and arranged a section of hanging every day to ensure the completion of welding before dark and the withdrawal of personnel. Finally, the replacement of all kiln tail chimneys was completed in the afternoon of . (Lou Xuxin)
More information
The company won the Taurus Award
On December 29, 2022, the "2022 High-quality Development Forum of listed companies and the 24th Golden Bull Award presentation ceremony of listed companies" jointly sponsored by China Securities News, Haikou Municipal Government and Haikou National High-tech Zone was held in Haikou. The list of Golden Bull Awards of listed companies was officially announced. With its outstanding performance, Jianfeng Group won the "2021 Golden Bull Most Investment Value Award".
2023
01-12
From December 11th to 12th, the 13th National Congress of the All-China Federation of Industry and Commerce was held in Beijing. Jiang Xiaomeng, chairman of the group company, attended the conference as a representative of Zhejiang.
2022
12-22
Yunnan Jianfeng won the title of "Harmonious Labor Relations Enterprise" in Yunnan Province
On November 18, the Yunnan Provincial Federation of Trade Unions, the Department of Human Resources and Social Security, the Entrepreneur Association and other units jointly issued a document to commend the harmonious labor relations enterprises in Yunnan Province from 2020 to 2021. Yunnan Jianfeng Cement Company is on the list and is the only enterprise in the urban area of Pu'er to receive this honor.
2022
12-13
Huang Ping Jianfeng won the title of "provincial green factory" in Guizhou
On November 30, the Guizhou Provincial Department of Industry and Information Technology released the 2022 list of green manufacturing units in Guizhou Province, and Huangping Jianfeng Cement Company was recognized as a "provincial green factory".
2022
12-13
On December 2, Yu Jianhong, general manager of the group company, gave a management lesson to the company's reserve management talents under the title of "Enterprise Management Innovation in Great Changes.
2022
12-13
On November 24, Jiang Xiaomeng, secretary of the party committee and chairman of the group company, gave a special party lesson to all party members and cadres of the company under the title of "comprehensively promoting the Great Rejuvenation of the Chinese Nation with Chinese Modernization" to interpret and preach the spirit of the 20th CPC National Congress.
2022
12-04