Yunnan Peak Replacing Kiln Tail Chimney
Release time:
2023-03-04
News from our newspaper # February 8 , with the completion of the welding of the last section of pipeline, the replacement of the kiln tail chimney of Yunnan Jianfeng Cement Company was successfully completed.
When Yunnan Peak inspected the steel plate of kiln tail chimney in November of 2022 , it was found that the thickness was reduced by 2-3 mm compared with that of 2021 , and it was necessary to replace it. In addition, according to the continuous 5 years of testing data analysis, it is found that the corrosion is weak below the inlet of the tail exhaust fan. In order to save costs, after discussion, it was decided that the replacement chimney should be replaced upward from , 25, 19 meters. For those below , 25, 21 meters, anti-corrosion treatment should be carried out during the next kiln shutdown to ensure that the service life matches the newly replaced part. After various understanding, in 2022
10, Yunnan Jianfeng determined the supplier and arrival time of the materials used for replacement through bidding, and worked out a set of construction plan through communication with the hoisting master and the construction team in the early stage: use 600 ton truck crane, and use the inner cylinder to hoist into the construction platform first when dismantling, after cutting 8 wire rope holes and fixing 4 wire ropes, the crane places the construction platform at 1 m below the required slit and fixes it firmly. The cutting can be lifted out. When installing a new chimney, the lowest construction platform is cut for splicing and welding, and so on. Since some iron plates are composite plates, 2.5 mm corrosion-resistant stainless steel plates are bonded to ordinary steel plates. In order to ensure that the stainless steel plates are not damaged, the old breathable cloth is used to be wound on the pressure roller of the plate bending machine for protection. Special lifting workpieces are used in the manufacturing process to ensure that the inner cylinder is not damaged. In order to ensure the welding quality, plates above 10 mm shall be beveled on one side. Each transverse seam and vertical seam shall be welded on both sides and each weld shall be inspected. Only after approval can the next section be hoisted and butted. According to the hoisting scheme, it is divided into 4 sections, and the hoisting weight and construction position corresponding to each section are calculated to control the length. 2 May 3 , the crane was assembled in the factory and dismantled in the afternoon of
4. Due to the difficulty of docking the old and new pipes, the deformation of the original pipe is large, and the docking time exceeds the expected time. For the sake of construction safety, Yunnan Jianfeng communicated with the construction unit and arranged a section of hanging every day to ensure the completion of welding before dark and the withdrawal of personnel. Finally, the replacement of all kiln tail chimneys was completed in the afternoon of . (Lou Xuxin)
More information
Jianfeng Pharmaceuticals ranks among the top 50 creative enterprises in Jinhua
News from our newspaper April 26 is World Intellectual Property Day. Jinhua City released the list of "Top 50 Creative Enterprises" for the first time. Jianfeng Pharmaceutical Company entered the list and ranked second among the enterprises in Jinhua Development Zone. The selection of creative enterprises, the enterprise holds the effective invention patent as the main indicator. Over the years, Jianfeng Pharmaceutical Co., Ltd. has taken "intellectual property rights help enterprise development, and scientific and technological innovation creates a century-old peak" as the company's intellectual property policy. It has actively cooperated with China Pharmaceutical University, Sichuan Institute of Antibiotic Industry, Zhejiang University of Technology, Xiamen University and other units to build a scientific research and innovation platform integrating production, learning and research, and flexibly introduced Academician Wang Guangji and Academician Shan Weiguang with the chief scientist system, according to the direction of enterprise development strategy to carry out scientific research work, and achieved fruitful results. In 2019, Spike Pharmaceuticals applied for 2 invention patents and obtained 5 patent authorizations, including 1 invention. By the end of 2019, Spike Pharmaceuticals had obtained a total of 37 patents (including 2 PCT patents), of which 28 were inventions. In recent years, in order to better integrate with the international market, Jianfeng Pharmaceutical has made a complete patent layout for the new drug DPT under development, and has applied for patent protection in multiple countries through the PCT application channel for core patents, and finally in the high-level United States. And Japan was authorized to lay a solid foundation for the product to enter these two overseas high-end markets. At the same time, around the core patent, applied for the preparation, crystal type patent and obtained the invention patent authorization 5. In addition, pharmaceutical companies have also developed patents for other varieties under research.
2020
07-31
Since the resumption of work after the Spring Festival, on March 17, Yu Jian, general manager of the group company, went to the site of the Huangping project in Guizhou to guide the construction progress of the Huangping project. During his stay in Huang Ping, General Manager Yu Jianhong visited the construction site of the project carefully, interviewed the project leaders of each construction unit respectively, sorted out the installation time of each unit of civil engineering and the completion time of each equipment installation, and required each construction unit to push forward the project progress in strict accordance with the agreed time node. At the same time, in view of the current epidemic prevention and control work and on-site construction safety management, Yu Jianhong also further put forward requirements, hoping to achieve "zero infection, zero accident". On the 18th, Yu Jianhong also conducted a research on the market in Kaili and other surrounding areas together with the marketing personnel of Guizhou Jianfeng Marketing Department, and put forward guiding opinions on the cement sales advertising plan and the division of cement sales areas. On this business trip, Yu Jianhong also specially brought Jinhua specialty ham and crisp cakes to the project team members, which were welcomed by everyone. (Lei Yuan)
2020
07-31
Since the resumption of work after the Spring Festival, on March 17, Yu Jian, general manager of the group company, went to the site of the Huangping project in Guizhou to guide the construction progress of the Huangping project. During his stay in Huang Ping, General Manager Yu Jianhong visited the construction site of the project carefully, interviewed the project leaders of each construction unit respectively, sorted out the installation time of each unit of civil engineering and the completion time of each equipment installation, and required each construction unit to push forward the project progress in strict accordance with the agreed time node. At the same time, in view of the current epidemic prevention and control work and on-site construction safety management, Yu Jianhong also further put forward requirements, hoping to achieve "zero infection, zero accident". On the 18th, Yu Jianhong also conducted a research on the market in Kaili and other surrounding areas together with the marketing personnel of Guizhou Jianfeng Marketing Department, and put forward guiding opinions on the cement sales advertising plan and the division of cement sales areas. On this business trip, Yu Jianhong also specially brought Jinhua specialty ham and crisp cakes to the project team members, which were welcomed by everyone. (Lei Yuan)
2020
07-31
Jinhua chain pharmacy big "physical examination" peak pharmacy got an "A"
Jinhua City Market Supervision Bureau recently announced the results of drug quality credit rating of drug retail chain enterprises in the city, and Jianfeng Pharmacy was rated as A in this "physical examination. According to the spirit of the document "Implementation Plan for Drug Quality Credit Classification Management of Jinhua Drug Trading Enterprises" and in accordance with relevant evaluation standards, Jinhua Market Supervision Bureau evaluated the 2019 drug quality credit rating of 34 drug retail chain enterprises (headquarters) in the city that met the evaluation requirements, involving 1498 stores. The score combines the daily supervision and inspection of chain headquarters, GSP certification inspection, administrative punishment and other drug quality-related information with the credit rating results of subordinate stores, and divides 100 into basic points, and forms the final score after adding and subtracting points according to the evaluation system. Those with 93 points or above are grade A (trustworthy enterprises),85-92 are grade B (basically trustworthy enterprises), and 80-84 are grade C (slightly dishonest enterprises), A score below 80 is Grade D (seriously dishonest enterprise). It is understood that the market supervision department will enter the enterprise credit rating evaluation results into the drug safety credit management system of Zhejiang Food and Drug Administration and Jinhua intelligent supervision and supervision platform to establish enterprise credit files. According to the credit rating evaluation results over the years, classified management will be carried out, and low-grade enterprises will increase the frequency of inspection. The "credit rating publicity board of drug trading enterprises" will be hung in the retail drugstore hall, and the evaluation results of the store will be publicized every year, let the people intuitively understand the credit situation of the store. At the same time, A- level enterprises are also the threshold for obtaining the qualification of designated medical insurance units, all kinds
2020
07-31
Daye Mayor to Daye Peak Research Issued "Anti-Epidemic" Donation Certificate
On the morning of March 26, Daye City Deputy Secretary, Mayor Zhou Jun and Daye City Economic and Information Bureau, Security Town and other responsible persons visited Daye Peak Cement Company to understand the epidemic prevention and control and resumption of production, and on behalf of the Daye City Charity Federation issued a certificate of donation of epidemic prevention and control materials. Accompanied by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Peak, Yuan Xianming, executive deputy general manager of Daye Peak, and others, Zhou Jun and his entourage went to the work site of Daye Peak to learn about the resumption of work and production. Zhang Fengliang introduced the progress of the upgrading and transformation of the grate cooler, the transformation of the kiln cylinder and the technical transformation of the cement mill system, and made a detailed report on the production and technical transformation organization of the enterprise during the epidemic, and expressed his gratitude to Daye City and Baoan Town for their help to Daye Peak during this period. Mayor Zhou Jun spoke highly of the production and technological transformation organization during the Daye peak epidemic, believing that this is a model of combining epidemic prevention and control with enterprise production and technological transformation organization. At the same time, Zhou Jun expressed his affirmation and gratitude to Daye Peak for donating money and goods to Daye City in the first time after the outbreak of the epidemic, and issued a donation certificate and a letter of thanks on behalf of the Daye City Charity Federation. Hubei Province epidemic prevention and control headquarters has recently issued a step-by-step "unsealing" notice in Hubei Province, how to fully resume work and production as soon as possible is an important issue facing Daye peak. Zhang Fengliang reported to Zhou Jun and his party on the current practical difficulties. Mayor Zhou Jun asked
2020
07-31
Since the resumption of work after the Spring Festival, on March 17, Yu Jian, general manager of the group company, went to the site of the Huangping project in Guizhou to guide the construction progress of the Huangping project. During his stay in Huang Ping, General Manager Yu Jianhong visited the construction site of the project carefully, interviewed the project leaders of each construction unit respectively, sorted out the installation time of each unit of civil engineering and the completion time of each equipment installation, and required each construction unit to push forward the project progress in strict accordance with the agreed time node. At the same time, in view of the current epidemic prevention and control work and on-site construction safety management, Yu Jianhong also further put forward requirements, hoping to achieve "zero infection, zero accident". On the 18th, Yu Jianhong also conducted a research on the market in Kaili and other surrounding areas together with the marketing personnel of Guizhou Jianfeng Marketing Department, and put forward guiding opinions on the cement sales advertising plan and the division of cement sales areas. On this business trip, Yu Jianhong also specially brought Jinhua specialty ham and crisp cakes to the project team members, which were welcomed by everyone. (Lei Yuan)
2020
07-30