I grew with the spikes
Release time:
2022-09-01
In March of Yangchun, flowers are in full bloom, and the garden-like Yunnan peak stands among the green leaves and red flowers, which makes me deeply moved and think of a lot.
time flies, from 2012 when I joined the factory, inadvertently, I have been accompanied by Yunnan peak growth for more than ten years. As a member of Yunnan Peak, I feel extremely proud and gratified. Because the growth of the company is also my growth, with our continuous efforts, Yunnan Jianfeng has become a beautiful big girl, and joining Yunnan Jianfeng is also the biggest turning point in my life.
I remember that when I first joined the company, I was just 26 years old. I was the age when college students just graduated and entered the society. I was already the mother of two children, but my social work experience was very shallow, which could be said to be blank. At that time, the peak of Yunnan, the new manufacturing and finished products and packaging workshops were still under construction. The bare factory area, except for the buildings under construction and the little green left by the mine in the back mountain, was a piece of loess. In the factory area, the cement mill left by the original relay cement company is still in production, the laboratory office is only a simple bungalow, and the equipment is also very backward.
I just joined the company and was assigned to the control room of the quality management department as a cement laboratory technician. I don't know anything about the laboratory business. I don't know anything. I rely on the old staff in the department to teach me hand in hand. After several months of training and hard work, I have gradually grown from a blank sheet of paper to a skilled worker who can be independent. The corresponding skills and knowledge are 1.1 recorded on this blank sheet of paper. These are the results of my efforts. In the group of quality management department, every employee must master the corresponding professional skills. Although the working experience in the quality control department is not very long, I deeply realize the great responsibility of this job, because the quality of each batch of factory cement must be strictly checked and reach the national standard before leaving the factory. Whether it reaches the standard or not depends on the result of the inspection by the laboratory technician of the quality management department. Each batch of factory cement is related to the life safety of every user, it is never allowed to make any mistakes in quality, so the job of laboratory technician is very important.
With the passage of time, the construction of Yunnan Peak Production Line has been gradually completed. 2012 8 3 9 55 , Chairman Jiang Xiaomeng of the Group Company lit the torch with the peak logo with the fire from Daye Peak, and Yunnan Peak was officially put into production. It was the most exciting moment. In the factory area, the sound of fireworks, firecrackers and applause were one after another, and every leader and employee present had a happy smile on their faces. This symbolizes another step on the Yunnan spike.
2013 3 January 8 , I transferred to the office to be a quality statistician. I had to face different new knowledge when changing positions. I learned from scratch again, and at that time I could not even use a multi-function calculator. On the first day of statistics, the director told me that the original statistics sister Zhou was leaving in the afternoon. I only had one morning to understand all the relevant knowledge about the position of quality statistician. My confidence even fell to the bottom at once, and I was also very anxious. I had no clue. I didn't know where to start. I was afraid that I couldn't learn and screwed things up. The relevant ledgers of this position involve not only the inside but also the outside of the enterprise. The cement quality ledgers cannot be careless. Some ledgers are to be summarized into monthly reports and submitted to relevant units. Wrong data means that there is a problem with the quality of our finished products. It will be very troublesome to deal with and will bring bad influence to the enterprise.
Fortunately, Zhou Jie is a very patient person. She told me not to worry and to take my time. The first thing is to learn to calculate the daily daily reports, then report to the company leaders, and put the data from the daily analysis room, control room and material inspection room on the relevant ledgers first, and then summarize and submit them to the relevant departments at the end of the month. Sister Zhou left the company. I can only call her and ask her what I can't do. Then I will do it slowly. If I make a mistake, I will start again. Slowly, I have sorted out the relevant business knowledge of the statistical post, and the number of rework has gradually decreased. During the process of handling the laboratory certificate, when the Yunnan Cement Association came to the factory to check the relevant ledgers, I was able to hand over the relevant ledgers to the teacher in the first place, and there was no mistake in the end.
At the beginning of 2014 , the new office building, the new staff canteen and the factory gate were also completed. The loess slope has long ceased to exist. The roads have all been poured with cement. The green belts on both sides are also full of different green plants, making the employees who go to work every day with a pleasant mood. 8 January 18 , I was transferred from the statistical post of the quality management department to the comprehensive management department as a clerk and personnel management. The comprehensive management department is not as single as other departments and workshops, and the business involved is relatively complicated, and the work is also complicated. The company's daily administration, the company's internal and external, the company's communication and coordination, the company's meeting and activity organization, meeting preparation, document, letter sending and receiving, transmission and supervision, the implementation of enterprise management system, important contracts, agreements and the establishment of enterprise file filing management, maintenance and daily management of office environment, office supplies, office equipment, human resources management, employee labor discipline management and employee salary distribution, daily vehicle scheduling, employee canteen and logistics management, corporate culture construction and other aspects should be involved. In the comprehensive management department, I also learned a lot. Under the premise of not having a master, I can only learn and explore by myself. In this department, it took me a long time to grow up slowly. Slowly, the department leader is not there. Can be alone.
With the passage of time, under the severe market competition, Yunnan Jianfeng has continuously strengthened internal control management and refined management, comprehensively improved the management level and operation level, and continued to grow. In recent years, it has become the cement enterprise with the largest sales volume, the highest terminal price and the largest number of customers in the regional market of brand cement in southwest Yunnan. And I also grew up on "Stage " given to me by my leader, making a blank piece of paper colorful under the description of breakthroughs and strokes.
Many employees in the company think that they work for the company and the company pays them. As for how to develop, it has little to do with themselves. I think this concept is wrong. Because, the enterprise is like a boat, and the staff is water, water can carry the boat, can also overturn the boat, the personal future and the enterprise are complementary, inseparable, only the enterprise grows, I can better reflect their own value, in order to play on this stage, no regrets here to draw my meaningful, valuable life blueprint. (Li Li)
More information
The company's "three" cultivation through the stage of acceptance
Since November 2015 was included in the second batch of "three" cultivation pilot enterprises in Zhejiang Province, the company has carried out a series of related work in depth. On October 19, the implementation of the company's "three" cultivation project from January 2016 to September 2017 passed the phased acceptance organized by Jinhua Economic and Information Commission and Jinhua Finance Bureau. According to the requirements of the "three" cultivation pilot enterprise responsibility letter signed with Zhejiang Province, Jinhua City and Wucheng District, as of the end of September 2017, the company has invested 16.0772 million yuan in related projects, and has achieved remarkable results in improving management, improving automation and informatization level. For example, after the digital system of quality and cost control in the plant extraction workshop of Jianfeng Health Technology Company is put into use, the whole production process can be controlled and traceable, the product quality is more stable, the production safety is effectively guaranteed, the "three wastes" emission is greatly reduced, and the product cost is reduced by 20%. The electronic label system of the pharmaceutical company automatically addresses and accurately locates the drugs in and out of the warehouse, which reduces the error rate of the out and into the warehouse, and the location management can automatically display the information such as the location and quantity of the drugs, which improves the work efficiency of the warehouse logistics and effectively reduces the management cost. The pharmaceutical company's sales management information system integrates sales management, warehouse management, customer management, statistical analysis and other modules, realizes drug sales management and control functions according to the requirements of GMP and GSP specifications, and analyzes drug regions and sales volume through big data, which will judge drug consumption trends faster and more accurately and improve the accuracy of the company's drug sales decisions. Health
2020
07-31
The company's "three" cultivation through the stage of acceptance
Since November 2015 was included in the second batch of "three" cultivation pilot enterprises in Zhejiang Province, the company has carried out a series of related work in depth. On October 19, the implementation of the company's "three" cultivation project from January 2016 to September 2017 passed the phased acceptance organized by Jinhua Economic and Information Commission and Jinhua Finance Bureau. According to the requirements of the "three" cultivation pilot enterprise responsibility letter signed with Zhejiang Province, Jinhua City and Wucheng District, as of the end of September 2017, the company has invested 16.0772 million yuan in related projects, and has achieved remarkable results in improving management, improving automation and informatization level. For example, after the digital system of quality and cost control in the plant extraction workshop of Jianfeng Health Technology Company is put into use, the whole production process can be controlled and traceable, the product quality is more stable, the production safety is effectively guaranteed, the "three wastes" emission is greatly reduced, and the product cost is reduced by 20%. The electronic label system of the pharmaceutical company automatically addresses and accurately locates the drugs in and out of the warehouse, which reduces the error rate of the out and into the warehouse, and the location management can automatically display the information such as the location and quantity of the drugs, which improves the work efficiency of the warehouse logistics and effectively reduces the management cost. The pharmaceutical company's sales management information system integrates sales management, warehouse management, customer management, statistical analysis and other modules, realizes drug sales management and control functions according to the requirements of GMP and GSP specifications, and analyzes drug regions and sales volume through big data, which will judge drug consumption trends faster and more accurately and improve the accuracy of the company's drug sales decisions. Health
2020
07-30
Yunnan Jianfeng supplies cement directly to Wa State of Myanmar
Yunnan Jianfeng Cement Company not only consolidates the original domestic market, but also gives full play to the location advantages of the three counties (Lancang, Menglian and Ximeng) close to the border to continuously expand the foreign market. Recently, the marketing department took the initiative to step out of the country from the Mangxin port in Menglian County and successfully sold "Jianfeng" brand cement to the newly planned Jinhua Xiaozunhe Island Development Zone in the Wa State of Myanmar. With the rapid development of China's economy in recent years, Myanmar has also increased the development of the China-Myanmar border area year by year. In order to attract more Chinese tourists to spend in transit, the Wa State Government of Myanmar has planned the Jinhua Xiaozunhe Island Development Zone near China's Menglian Mangxin Port. After the development zone is completed, it will mainly focus on gambling, business hotels, and border trade. There is an estimated demand for about 80000 tons of cement. When Yunnan Jianfeng marketing personnel learned of the news, they went deep into the development zone many times to understand the situation and had extensive contact with customers. With the good reputation of Jianfeng Cement in southwest Yunnan in recent years, they successfully signed a supply contract with a commercial mixing station in the development zone. At present, Yunnan Jianfeng has directly supplied 1200 tons of cement through Mangxin Port, and is expected to win 80% of the cement supply business of the development project. The initiative of "Belt and Road Initiative" to open up the international channels of South Asia and Southeast Asia has brought new development opportunities to many enterprises. This time, Yunnan Jianfeng Marketing Department went abroad to seize the opportunity, breaking the previous practice that the company mainly relied on agents for cement export, and achieved a new breakthrough in directly connecting users, which not only increased revenue, but also further expanded the radiation scope of its own marketing network, so as to further expand the scope of going abroad in the future.
2020
07-31
The company's "three" cultivation through the stage of acceptance
Since November 2015 was included in the second batch of "three" cultivation pilot enterprises in Zhejiang Province, the company has carried out a series of related work in depth. On October 19, the implementation of the company's "three" cultivation project from January 2016 to September 2017 passed the phased acceptance organized by Jinhua Economic and Information Commission and Jinhua Finance Bureau. According to the requirements of the "three" cultivation pilot enterprise responsibility letter signed with Zhejiang Province, Jinhua City and Wucheng District, as of the end of September 2017, the company has invested 16.0772 million yuan in related projects, and has achieved remarkable results in improving management, improving automation and informatization level. For example, after the digital system of quality and cost control in the plant extraction workshop of Jianfeng Health Technology Company is put into use, the whole production process can be controlled and traceable, the product quality is more stable, the production safety is effectively guaranteed, the "three wastes" emission is greatly reduced, and the product cost is reduced by 20%. The electronic label system of the pharmaceutical company automatically addresses and accurately locates the drugs in and out of the warehouse, which reduces the error rate of the out and into the warehouse, and the location management can automatically display the information such as the location and quantity of the drugs, which improves the work efficiency of the warehouse logistics and effectively reduces the management cost. The pharmaceutical company's sales management information system integrates sales management, warehouse management, customer management, statistical analysis and other modules, realizes drug sales management and control functions according to the requirements of GMP and GSP specifications, and analyzes drug regions and sales volume through big data, which will judge drug consumption trends faster and more accurately and improve the accuracy of the company's drug sales decisions. Health
2020
07-31
"We were also praised by the traffic police." On September 26, when talking about the civilized travel volunteer activities a few days ago, Li Xuegen of the big pharmacy smiled and was very happy that his work was recognized. Starting from May this year, during the rush hour on the 5th and 20th of each month (weekends and holidays are postponed), there will be a group of volunteers wearing red vests and hats, holding signs with the words "courtesy of zebra crossing, civilized crossing of the road" to divert traffic at many intersections in the city. This is a civilized travel volunteer service activity carried out by Jinhua City to further promote civilized travel and persuade uncivilized behavior. As a civilized unit at the municipal level in Jinhua, Jianfeng Group's duty junction is at the intersection of Bayi North Street and Zhongshan West Road. Before the activity was carried out, as the organizer of the group company, the group office had deep concerns. The activity took a long time and required a lot of manpower. As an enterprise, under the condition of ensuring normal production, it was completed by employees in their spare time. Can it be continued? To this end, Xiang Chongping, the leader in charge of the group company, specially organized a meeting of the directors of the subordinate enterprise offices to mobilize and deploy the matter. The group office also specially established the QQ group of "Peak Civilized Travel Volunteer Service" to release the contents and arrangements of the activities, update the duty situation, and praise the small partners on duty. At the beginning of the activity, colleagues in the headquarters building took the lead in taking up their posts. The first class was Li Hong, Li Xia, Yang Liu and Lei Yuan of the finance department of the group company. Employees of the group office, the peak health experience hall, Qiubin Factory and the international trading company also took up their posts one after another. Other enterprises also took part in an orderly manner according to the duty schedule.
2020
07-31
Daye peak again won the national inspection big contrast "all-excellent award"
A few days ago, daye peak cement co., ltd won the "all-excellent award" in the 16th national cement quality index inspection comparison of "hongchao science and technology cup" organized by the national cement quality supervision and inspection center in 2017 ". The national cement quality index inspection is held every two years. It is the highest level competition in the cement industry. It aims to understand the current quality inspection level of China's cement industry through large-scale comparison, promote various cement inspection departments to improve the inspection quality, and provide accurate data for cement production and use. The results truly reflect the overall inspection level of national cement production enterprises and provincial building materials (cement) inspection stations, it represents the highest level of inspection technology in the cement industry. Over the years, Daye Peak has firmly established the concept of "quality is the life of an enterprise", always puts product quality control in the first place, and conducts daily inspections in strict accordance with the testing items and frequency specified by national standards. actively carry out inspection comparison with provincial and municipal cement quality inspection centers, improve the professional level of inspectors through skill training, and spot check the internal passwords of inspectors every month to strictly ensure the accuracy and reliability of data, to ensure that the quality of the factory cement to meet the market and customer demand, and further enhance the core competitiveness of enterprises. Since it was officially put into production in 2008, Daye Peak has participated in the national cement quality index inspection five times, and has achieved good results. Among them, it won the "All-Excellent Award" in 2009 and the "All-Qualified" in 2011, 2013 and 2015. Unit Award ". (Yang Huiping)
2020
07-31