Daye Peak Condensing Wisdom to Soluble Problems
Release time:
2022-06-01
5# January 19 , daye peak cement company 6 cement warehouse was cleaned and overhauled, and everything was normal.
This ordinary cement warehouse overhaul caused a collision and blending of electrical and equipment technologies in Daye Peak. In the middle of November, daye peak 6
cement warehouse was overhauled and checked according to the process. as a result, it was found that the ventilation cloth of the inflatable box in the three Roots blower warehouse could not be bulged normally and did not meet the acceptance standard. The pipeline is unobstructed and there is no air leakage. The working condition of Roots blower is normal. What is the problem?After several days of investigation and analysis, the equipment and production supervisor all agree that the problem lies in the air distributor at the bottom of the warehouse. In 2015
, due to inadequate warehouse management at that time, the electric ball valves at the bottom of the cement warehouse were often stuck due to material binding and could not circulate automatically, resulting in serious material binding in the cement warehouse. In order to solve this problem, technicians had to try to change the6# cement warehouse 12 electric ball valves into a traditional air distributor to solve the problem of electric ball valves stuck. However, what did not attract attention at that time was that the working principle of the traditional distributor was uninterrupted switching and the time was very short. As a result, the pressure of the air box in one charging area in the warehouse did not rise, the air pressure was switched to other charging areas, and the air volume was scattered throughout the warehouse, thus the purpose of circulating discharging could not be achieved. The reason for is found out. If it costs 10
yuan to replace the electric ball valve again, and the delivery period is more than half a month, the cement warehouse will not be put into use for a long time."Can Transform and Optimize the Traditional Distributor to Achieve the Effect of Circular Discharging " ? At the morning meeting, a remark by Zhang Fengliang, Deputy General Manager of the Group Company and General Manager of Daye Peak, aroused enthusiastic response from technicians. The consensus is to install a control system for old equipment. Therefore, the equipment, electrical and technical personnel started from the equipment structure of the distributor, determined the arrangement point of the proximity switch, and equipped the waste control box and frequency converter. After debugging, the distributor realized the function of stopping 15 minutes to circulate and divide the air, meeting the requirements of circulating and discharging in the warehouse. It is foreseeable that the failure rate of the distributor will be much lower than that of the electric ball valve in the future. Daye Peak The renovation of the distributor has achieved good results, which has improved the enthusiasm of technicians to cooperate and saved more than 10
yuan in machine material consumption. Daye Peak will also apply for a utility model patent, which also provides new ideas for repairing the old and recycling the waste in the future.(Wang Yiyan)
More information
Since the implementation of the large-scale inspection in early November 2016, Daye Jianfeng Cement Company has embarked on a comprehensive institutional adjustment and optimization, which has been carried out for more than five months. In just a few months, the internal management of Daye Peak has achieved a preliminary transformation, the process has been further straightened out, and the work efficiency has also been significantly improved. Reduce the hierarchy and further flatten the management. In the past, in order to avoid responsibilities, there were often repeated and overlapping settings in the setting of enterprise posts, and even there were cases where no one handled the accident and no one took responsibility. In order to truly realize flat management, daye peak merged the original production department, technology department, manufacturing workshop and finished product workshop to form a manufacturing department in early January this year after the implementation of large-scale inspection. Merging the former Environmental Security Department and the Comprehensive Management and Security Department to form the Environmental Security Department; The purchasing functions of the original departments were merged into the purchasing department. The functions of the infrastructure section of the former comprehensive management department were merged into the waste heat power generation department. After the adjustment of the organization, the members of the management team in charge of production also served as department managers, realizing the "sinking" of management ". Adjust and formulate the responsibility system to ensure that tasks are on duty and responsibilities are on duty. In response to changes in institutions and job settings, Daye Peak has carried out a comprehensive revision of the job responsibility system, making requirements around the key indicators of various departments and positions, and implementing "personalization" of responsibilities ". For example, the relevant indicators of mechanics focus on the consumption of machinery and materials, the operation rate of the equipment under their jurisdiction, and the failure time, and the hook for cement and clinker production has been canceled. Responsibility assessment is carried out according to post responsibilities and relevant management systems, and the assessment has been strengthened. In order to understand the actual effect of daye peak institutional reform, on March 30, the group company
2020
07-31
Group Party Committee to determine the annual work plan
The party Committee of the group company has determined its work ideas and work plan for 2017 a few days ago, and relevant work has been arranged below. In view of the current new political and economic situation and the task of enterprise transformation and development, the general requirements of the Party Committee of the Group Company for 2017 are: to thoroughly study and implement the spirit of the Sixth Plenary Session of the 18th CPC Central Committee and the series of important speeches by General Secretary Xi Jinping, the spirit of the Seventh Party Congress of Jinhua City, to closely revolve around the center of enterprise production, operation and reform and development, and to adhere to scientific development and cross-regional development as the first priority, in order to continue to carry out the study and education of "five stars striving for innovation" and "two learning and one doing", we should highlight the main line of comprehensively and strictly administering the party according to the rules, firmly establish the political awareness, overall situation awareness, core awareness and alignment consciousness of the majority of Party members and cadres, strengthen and improve the party building work in enterprises in the spirit of reform, and strive to improve the scientific, standardized and institutionalized level of Party building work in enterprises, in order to promote the scientific development of the group company, leapfrog development and harmonious development, it provides a strong political, ideological and organizational guarantee. The working idea of the Party Committee of the Group Company in 2017 is to focus on "one center", adhere to "one concept", highlight "three key points" and do a good job in "three constructions". That is: centering on the "one center" of enterprise production, operation and reform and development, we should strive to strengthen the "one concept" of "the organic unity of the party's leadership and the improvement of corporate governance"; to "thoroughly implement the main responsibility of the party committee; continue to carry out the study and education of" two learning and one doing "; and improve the system of party building work" as the "three key points", and focus on "team building and team building
2020
07-30
End of 2016 Qualification Review
According to our newspaper, the 2016 employee qualification evaluation work ended a few days ago, and 380 employees obtained new qualifications. Since the implementation of the employee qualification evaluation system in 2010, it has produced certain results in promoting employees to strengthen self-learning and improve and establish a multi-channel career development system for employees. Since the company's cement sector was included in the scope of qualification management for the first time, in accordance with the relevant regulations of the company's employee qualification management, the written examination for this review was conducted in Jinhua, Daye, and Pu'er on December 25, 2016. After professional knowledge examination, performance evaluation and comprehensive evaluation, the qualification of the corresponding grade and grade is finally determined. A total of 380 employees participated in the review, including 40 in management, 59 in technology and 281 in technicians. According to the unit, there are 2 people in the group department, 186 in daye peak, 89 in Yunnan peak, 56 in pharmaceutical company, 6 in international trade company and 41 in peak health. For employees who apply for qualifications above level 3, Group Barton organized a unified review. According to the final results, more than 6 per cent of the total number of persons rated as three or more qualified. (this newspaper reporter)
2020
07-31
Group Party Committee to determine the annual work plan
The party Committee of the group company has determined its work ideas and work plan for 2017 a few days ago, and relevant work has been arranged below. In view of the current new political and economic situation and the task of enterprise transformation and development, the general requirements of the Party Committee of the Group Company for 2017 are: to thoroughly study and implement the spirit of the Sixth Plenary Session of the 18th CPC Central Committee and the series of important speeches by General Secretary Xi Jinping, the spirit of the Seventh Party Congress of Jinhua City, to closely revolve around the center of enterprise production, operation and reform and development, and to adhere to scientific development and cross-regional development as the first priority, in order to continue to carry out the study and education of "five stars striving for innovation" and "two learning and one doing", we should highlight the main line of comprehensively and strictly administering the party according to the rules, firmly establish the political awareness, overall situation awareness, core awareness and alignment consciousness of the majority of Party members and cadres, strengthen and improve the party building work in enterprises in the spirit of reform, and strive to improve the scientific, standardized and institutionalized level of Party building work in enterprises, in order to promote the scientific development of the group company, leapfrog development and harmonious development, it provides a strong political, ideological and organizational guarantee. The working idea of the Party Committee of the Group Company in 2017 is to focus on "one center", adhere to "one concept", highlight "three key points" and do a good job in "three constructions". That is: centering on the "one center" of enterprise production, operation and reform and development, we should strive to strengthen the "one concept" of "the organic unity of the party's leadership and the improvement of corporate governance"; to "thoroughly implement the main responsibility of the party committee; continue to carry out the study and education of" two learning and one doing "; and improve the system of party building work" as the "three key points", and focus on "team building and team building
2020
07-31
Yunnan peak through the safety standard secondary acceptance
On March 21, Yunnan Jianfeng Cement Company successfully passed the evaluation and acceptance of secondary enterprises for safety production standardization. On the same day, a review team composed of leaders of the Yunnan Provincial Work Safety Supervision Bureau and relevant experts reviewed the implementation of the establishment of Yunnan Jianfeng safety production standardization secondary enterprises. According to the 13 elements involved in the "Standard for Assessment and Rating of Safety Production Standardization in Cement Enterprises", the review team conducted strict assessment and scoring item by item through grouping to check the site and review the data, and finally determined that Yunnan Peak passed the standard acceptance of safety standardization secondary enterprises. Yunnan Jianfeng has always attached great importance to safety production. After passing the three-level safety standard enterprise review in 2015, in order to raise the level of enterprise safety management to a new level, in 2016, it began to create secondary safety standardization. Over the past year, Yunnan Jianfeng has insisted on taking the creation of secondary safety standards as the top priority of production and operation management, and has formulated an implementation plan for production safety standardization in accordance with the requirements of national standardization norms. the content covers production safety responsibility system, education and training, safety inspection, safety facilities management and other safety production management standards, systems and post safety operation procedures, while further strengthening daily safety inspection and regularly organizing emergency plan drills, strengthen the investigation and rectification of potential safety hazards and the supervision of important hazard sources, and further consolidate the foundation of enterprise safety production management. After the review, Zhou Jiping, general manager of Yunnan Jianfeng, said that Yunnan Jianfeng will take this standard as a new starting point. On the basis of consolidating the accident-free achievements in production safety for two consecutive years, it will conscientiously implement the main responsibility of production safety and cultivate
2020
07-31
Yunnan peak through the safety standard secondary acceptance
On March 21, Yunnan Jianfeng Cement Company successfully passed the evaluation and acceptance of secondary enterprises for safety production standardization. On the same day, a review team composed of leaders of the Yunnan Provincial Work Safety Supervision Bureau and relevant experts reviewed the implementation of the establishment of Yunnan Jianfeng safety production standardization secondary enterprises. According to the 13 elements involved in the "Standard for Assessment and Rating of Safety Production Standardization in Cement Enterprises", the review team conducted strict assessment and scoring item by item through grouping to check the site and review the data, and finally determined that Yunnan Peak passed the standard acceptance of safety standardization secondary enterprises. Yunnan Jianfeng has always attached great importance to safety production. After passing the three-level safety standard enterprise review in 2015, in order to raise the level of enterprise safety management to a new level, in 2016, it began to create secondary safety standardization. Over the past year, Yunnan Jianfeng has insisted on taking the creation of secondary safety standards as the top priority of production and operation management, and has formulated an implementation plan for production safety standardization in accordance with the requirements of national standardization norms. the content covers production safety responsibility system, education and training, safety inspection, safety facilities management and other safety production management standards, systems and post safety operation procedures, while further strengthening daily safety inspection and regularly organizing emergency plan drills, strengthen the investigation and rectification of potential safety hazards and the supervision of important hazard sources, and further consolidate the foundation of enterprise safety production management. After the review, Zhou Jiping, general manager of Yunnan Jianfeng, said that Yunnan Jianfeng will take this standard as a new starting point. On the basis of consolidating the accident-free achievements in production safety for two consecutive years, it will conscientiously implement the main responsibility of production safety and cultivate
2020
07-31