The Spike Newspaper Restarted My Way to Painting
Release time:
2022-04-06
■ Former peak employee Xu Feng
In 2014 , I joined the big family of peak health and transferred to the Administration and Personnel Department the following year. The work of the administrative personnel department is trivial and complicated, and cultural propaganda work is also among them. Because of this, my contact with the "Peak News" gradually increased. With the encouragement of the editors, in addition to the press release of Peak Health, I also translated some of my life insights and feelings into words, and occasionally appeared in the fourth edition. "Furong " supplement.
Once, I wrote an essay called "Remembering the Period of Old People", which was about my experience in the calligraphy and painting club when I was a student. At that time, we were young, with the love of painting and calligraphy, using the spare time to carry the easel out of sketching together, together to participate in the National Junior Painting and Calligraphy Competition ...... We studied together and laughed together under the guidance of Chinese painting teacher Chen, regardless of cold and summer day and night, throwing pen and ink, and enjoying it, making the whole reading career full of challenges and fun. Although that experience has passed for many years, it is still vivid in retrospect, as if it were just yesterday, it has become an incomparably beautiful memory in my life.
Perhaps because of this manuscript, 2016 , the editor of "Peak News" told me when planning the staff column of the supplement: "In the past, most of the columns were written manuscripts. You can make a change. Each issue of paintings with different themes, with related short articles, have a try? " At that time, the "Peak News" had a half-month issue and four employee columns each. If each issue had one short essay and two paintings, I would have to prepare eight paintings and four articles in two months. However, I have not taken a paintbrush for nearly 10 years. I still have a daughter in the second year of junior high school and a nine-month-old son to take care of. I am not sure whether I can finish it on time. I always feel that it seems a little impossible. However, with the encouragement of the editor, I waited for my daughter and son to sleep every night, picked up the brush again and started to create, and completed the task within the scheduled time, becoming the first employee of Jianfeng Health Company to publish a column in Jianfeng News.
Looking back now, because I haven't painted for many years, there were many flaws in several paintings at that time, but through the column, many colleagues from other units learned that Jianfeng Health had a painting Xu Feng. In the following years, recommended by the "Peak News", my works were selected to participate in the annual National Building Materials Industry Painting and Calligraphy Exhibition. The two works were successively included in the 7th and 8th National Building Materials Industry Painting and Calligraphy Exhibition. In 2018 , my traditional Chinese painting works were selected by the company to participate in the first Zhejiang Province Building Materials Industry Painting and Calligraphy Photography Exhibition and won the Excellence Award; I won the second prize at the painting and calligraphy photography exhibition held by the company on the 60th anniversary of Jianfeng Entrepreneurship ... All these made me more confident and interested in painting. Painting has become an indispensable part of my life. I would like to thank every leader, predecessor and colleague who supported my growth!
I studied painting in my early years, mostly painting landscapes or flowers and birds. After I picked up my brush again, I also kept trying new things on the subject of painting. Starting from 2017 , every year on the eve of the lunar new year, I will draw a picture of the zodiac and contribute to the peak newspaper. Since the year of the rooster, dogs, pigs, rats and cows have been painted for a total of five years, mostly for the first time. It has always been believed that such a year-long zodiac can be painted in the "Peak Newspaper", but shortly after the painting of the cow, for some reason, I left the peak and went back to my hometown Lanxi to work. One time I joked with the editor of the "Spike Newspaper" that the next year was the Year of the Tiger, and the tiger was too difficult to draw, so I ran away ...
Shortly after returning to Lanxi, under the introduction of the senior brother of the Painting and Calligraphy Society, a second teacher Chen appeared in my painting career, who was a member of the Chinese Artists Association. Under the guidance and leadership of Mr. Chen, I systematically learned the combination of traditional and modern calligraphy and painting techniques, the deployment of colors, and made great breakthroughs in the understanding of painting and the style of painting. 2022 3 , my traditional Chinese painting "golden autumn" was selected for the first "lanxiang rhyme " female painter art exhibition in Lanxi city. "Bi Chi Qing Ying" was selected into "Ruihua Dan Qing Magnificent Age " 21th Zhejiang Flower and Bird Female Painter Exhibition. Seeing my own works hanging in the spacious exhibition hall and being appreciated by the audience coming and going, I have mixed feelings in my heart ...
Now, although I have left the peak, my attention to the peak and the peak newspaper has not changed, and the love for painting that has been rekindled by the peak newspaper has not changed either. After working hard, my greatest pleasure and leisure is to learn and draw. I can't forget the days when I grew up with the "Peak News". If there were no "Peak News", maybe I would not restart my painting road. I hope that in the near future, my paintings can enter newspapers and magazines, art exhibitions at all levels, and I also look forward to becoming a member of the Zhejiang Artists Association one day. This is a small goal set for myself.
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30