Huang Ping peak marketing staff manufacturing department learning work experience
Release time:
2022-04-06
Editor's Note: In order to strengthen the marketing staff's mastery of relevant business skills such as cement production enterprise process, cement theoretical knowledge, enterprise quality control, cement quality inspection process operation, etc., at the beginning of the New Year, Huang Ping Jianfeng Cement Company arranged marketing staff to practice in production positions in batches and stages to understand the cement production process. At present, some salesmen have completed the internship of the manufacturing department and summarized their internship work. This paper excerpts a part for everyone to share and learn.
Through 15 days of internship in different positions in the cement production line, I have a further understanding of the cement production process. At the same time, but also clearly aware of their lack of knowledge of cement.
to the manufacturing department on-site work and study, the first thing is safety education and training, which requires our employees to firmly establish the idea of safety first in their daily work, correctly handle the relationship between safety and production, and ensure the safe production of enterprises. In these 15 days, the place I stayed most was the kiln system, followed by the raw material system. We have to continuously inspect the entire production line every day to eliminate potential safety hazards in time. Wear masks and earplugs in places with a lot of dust and noise to reduce the impact of dust and noise on health. Every time the patrol inspection finds that there is a problem with the equipment or cleans up the smoke room and coal pipes, it is necessary to contact the central control through the interphone in the first place, and the central control can only start the operation after shutting down the equipment.
What I have to do every day in the kiln system is to check the flap valves in each layer of the preheater to prevent material accumulation, and then assist colleagues to clean up the clinker particles leaked from the smoke room, the coal pipe at the kiln head and the kiln head. During the operation, although I was assisting on the side, my colleagues still asked me to obey their instructions, wear a complete set of fire-proof clothing, and do a good job of safety protection to prevent safety accidents.
When studying the raw material system, my colleague introduced me to a small skill, which is to judge whether the raw material is qualified or not by the temperature of the V powder selector. Because the high and low temperature represents the high and low of the integrated moisture of the grinding material, the two are inversely proportional to the relationship. It can also be found that the chemical composition and content of the material will directly affect the kiln calcination operation and yield.
clinker is a hydraulic cementitious substance containing calcium oxide, silica, alumina and iron oxide, which is ground into fine powder and fired into partial melting state according to appropriate proportion, and calcium silicate is taken as the main mineral component. The mineral composition of clinker mainly includes tricalcium silicate, dicalcium silicate, tricalcium aluminate and tetralcium aluminate. The mineral with the largest content is tricalcium silicate, followed by dicalcium silicate. Cement clinker in the kiln system formation process, according to the temperature and reaction can be roughly divided into drying, preheating, firing and cooling. The six-stage preheater used by Huangping Peak can make better use of the waste heat of the waste gas discharged from the kiln and the decomposition furnace to heat the raw material, and the gas-solid dispersion is uniform, the heat exchange is rapid and the high energy separation is high, which improves the heat exchange efficiency between the gas and solid to a greater extent, and realizes the superiority, high yield and low consumption of the whole calcination system. The raw material enters the preheater from the raw material warehouse for preheating and decomposition, and then enters the kiln for calcination. After calcination, the clinker enters the fourth-generation grate cooler. Grate cooler is mainly to reduce the clinker temperature, and the role of the heat contained in the clinker for multiple use, while the heat in the form of secondary air, tertiary air return to the kiln, preheater and waste heat power generation system. Finally, the qualified clinker is transported to the clinker warehouse through the clinker inclined zipper.
After a short follow-up study, I not only buried the "seed " for safe production, but also got a preliminary understanding of the role of common raw materials in the cement production process. Only by laying a good foundation and communicating in the same industry, can we not get stage fright because we do not understand the use of equipment and the role of various raw materials, and have more communication with customers in the front line of the market. If I want to do a good job in cement business, I also need to be more proficient in cement knowledge and marketing knowledge, and dare to innovate, constantly improve my business skills, and be a qualified salesman. (Chen Jianfei)
At the production site, the most is the production equipment, and the most important thing to pay attention to is the mechanical injury. Before the equipment is turned on, the central control room will definitely notify the on-site inspection personnel to carry out detailed inspection on the site to confirm that no one can turn on the mechanical parts and belt conveyor on the site. There are large pieces of material and other abnormal conditions on site, which need to be dredged manually. The first thing to do is to notify the central control room to stop the equipment to prevent problems before they occur. When working, we should wear masks, protective clothing and earplugs for noisy equipment. When cleaning up the smoke room, there must be two or more people present, wearing fire-proof clothing, fire-proof caps and fire-proof covers, and there will be other on-site personnel to assist to ensure the safety of the operators.
During the two months of studying in the manufacturing department, I have a more comprehensive understanding of limestone mining, raw material crushing and pre-homogenization, raw material grinding, raw material homogenization, clinker calcination and cooling, cement powder, cement storage and homogenization, cement shipping and other processes. The site of the manufacturing department is roughly divided into five systems: raw meal, kiln, coal mill, cement mill and waste heat power generation. In addition to waste heat power generation, I have studied the inspection post of each system for a week, and have a better understanding of the production process and equipment of each system, as well as the matters needing attention in the usual inspection.
The two-month period is very short. Although it is a bit hard, in general, the harvest is far greater than the effort, and it also makes me realize many simple and simple truths. Every department and every post is indispensable, and no one can be careless, otherwise it will affect the work of the entire production line and the quality of the products. It also made me understand that only when production and sales cooperate with each other can enterprises produce and operate better. The study in the manufacturing department not only gave me a better understanding of the cement production process and cement professional knowledge, but also made me understand that in my new position, I must ask and learn more. Only by working with curiosity can I learn more knowledge. After that, I will continue to strengthen my study of cement production process and professional knowledge. Although I am a marketing position, it is difficult for me to establish a foothold in this industry without a solid foundation and a studious attitude.
(Yang Wentao)
The most important thing in the production workshop is to protect my own safety, so on the first day I entered the workshop to study, I first conducted level 3 safety education, training and examination. After entering the site, I started from the most basic job position, that is, the feeding position, which is mainly responsible for the normal feeding of raw materials and the inspection and dredging of clay belts and iron slag feeding ports. Most of my time is spent in clay feeding ports, iron powder weighing, clay belt heads and other places where materials are easy to accumulate. For me, who has never worked night shift, working all night has become the first big test. Every time after 2 in the morning, my eyes begin to strike. Neither drinking coffee nor washing my face can wake up my body. I remember one time when I was preparing to rest after cleaning the clay blanking port, I received a notice that the sandstone crusher was full of rubble. so at 2: 50 in the early morning, we started the cleaning work. because the construction space was relatively narrow, the dust all over the sky accompanied me for 2 hours of cleaning work, which was deeply imprinted in my memory. I was tired, hungry and sleepy, you can fall asleep almost anywhere.
In the first week of studying in the manufacturing department, I mainly experienced the work of the feeding post and learned the raw materials of the stacking shed. In the second week, I moved to the inspection post of the raw material system, mainly inspecting the normal operation of all equipment in the raw material system. When I followed the post worker to inspect together, he introduced the equipment and their operation principle to me in detail. In the third week, I went to the kiln system, which is the most critical part of cement production, and cleaned the crust in the smoke chamber and the accumulated material in the coal injection pipe at fixed points every day. In order to prevent injuries, protective measures need to be taken during work. After wearing fire-proof clothing and fire-proof cap, you can carry out high-pressure water gun skinning with the post worker. The daily inspection work is running in the preheater, which is as high as ,120 meters. Each floor swings the flap valve to prevent the flap valve from being stuck. At that time, I was also punished for not reporting to my superiors because the flap valve on the fourth floor was stuck. The fourth week is the last step into the cement production process - cement mill system study.
Through nearly two months of study in the manufacturing department, I have a better understanding of cement-related knowledge, but this is far from enough. If I want to be a qualified marketing personnel, I still need to enrich myself through continuous learning.
(Liu Chen Qian)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30