A little understanding of enterprise information construction
Release time:
2021-12-13
10# January 18 , the Political Bureau of the CPC Central Committee held its 34th collective study on promoting the healthy development of China's digital economy. General Secretary Xi Jinping stressed when presiding over the study that in recent years, technologies such as the Internet, big data, cloud computing, artificial intelligence and block chain have accelerated innovation and are increasingly integrated into the whole process of economic and social development, the rapid development of the digital economy, the wide range of radiation, and the depth of influence are unprecedented. It is becoming a key force in reorganizing global factor resources, reshaping the global economic structure, and changing the global competitive landscape. We should stand at the height of coordinating the overall strategic situation of the great rejuvenation of the Chinese nation and the great changes unseen in the world in a century, coordinate the overall domestic and international situation and the two major events of development security, give full play to the advantages of massive data and rich application scenarios, promote the deep integration of digital technology and the real economy, enable the transformation and upgrading of traditional industries, and give birth to new industries and new models, We will continue to strengthen, optimize and expand China's digital economy.
The traditional manufacturing industry, as the core industry of our group, has recently been affected by the epidemic, the high price of raw fuel materials, and the power restriction policy. How to break this bureau, I think the key lies in the transformation to intelligence and information. The following is my personal development of enterprise information a little humble opinion.
First of all, I think it is necessary to make a statistical analysis of the existing information situation within the enterprise, what information equipment and information platforms do we have, how to use them, and how to help our company. Therefore, we should ask ourselves why the utilization rate is not high? Why the system is not working? Is it a system problem or other problems? Is this system good or not? Can other brother enterprises use it? If it is good, we should recommend it, and if it is bad, we should remind it. We should strengthen the communication between subsidiary enterprises, so as to avoid repeated invalid construction. At the same time, through the organization of training to improve the level of grass-roots staff information operation, change their traditional thinking, improve the utilization rate of the system, so that the system is really used from top to bottom. Only by analyzing the current situation of the company and making good use of the existing information system can it be possible to move to the next step.
Secondly, comparing the current situation of the company with the leading informatization enterprises in the same industry, we can clearly know which aspect of the company's informatization is weak, and then introduce new platforms and new technologies to improve our informatization level. However, the introduction of the platform is not to make up for what is missing. The company must first combine its own industry development status, business needs for an overall planning, and then distribute the implementation. Secondly, it is necessary to evaluate the input-output ratio of the introduction system. Emerging technologies must require high costs and are not mature. We do not have to be intelligent for the sake of intelligence. Instead, we should choose those with high input-output ratio, in line with the company's development plan, Mature products that have been tested by most companies in the same industry. Finally, we must choose the right powerful suppliers. The establishment of a group-level data platform must be the future development trend. Only when the suppliers have strong strength can we help us complete the data integration and docking.
As far as I am concerned, I think the group can consider increasing the informatization construction of security. On the one hand, it is information security. With the gradual improvement of informatization construction, the company will rely more and more on the informatization system. The paralysis of the business system can cause direct economic losses to the enterprise, and some business data also involve the company's secrets, if we blindly strengthen the information construction of business and ignore the construction of information security, it is equivalent to burying a mine that will explode at any time. On the other hand is the production safety, with the expansion of the scale of production, in the safety management needs to spend a lot of manpower, material and financial resources, the workload is large, the work efficiency is low, the management cost is high, has become to further enhance the safety production management constraints. The frequent occurrence of safety accidents continues to sound the alarm for us. How to informationize safety management? One is to use robots instead of employees to engage in dangerous activities. I think this technology is not mature and the cost is too high, so we will not discuss it for the time being. The other is to establish a safety management platform in the factory area. Through video surveillance, image recognition, AI analysis and other technologies, the unsafe behaviors of people and objects on the scene can be found in time, and the dangerous sources can be killed in the cradle in time, thus preventing the occurrence of safety accidents.
Finally, I think the most important thing is the management of the information system. After the introduction of the information system, the management of information must keep up. Informatization needs institutionalized support. At present, most companies are still blank in the management system of informatization. With the continuous advancement and development of information technology, information management will become more and more difficult. I think it is necessary to establish an information management system in a timely manner. Instead of establishing a system like mending the situation in the future, it is better to plan everything from the beginning and manage it according to the system in the future.
and above are some of my humble opinions on the development of enterprise informatization. I hope the informatization development of the group and its subsidiaries can get better and better. (Yu Wang Yang)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30