Completion of three-year action plan for site management
Release time:
2021-08-11
2021 , 9 enterprises affiliated to the group company have completed the preparation of the three-year action plan for on-site governance of 2021 - 2023 as required, which will be compiled into a book after being reviewed by the group company and implemented step by step in the second half of the year. site management three-year action plan, that is, starting from
2021, it will take three years to realize the most concise and reasonable 5S management by optimizing the design and reforming the unreasonable site, process and equipment layout. Carry out the renovation and upgrading of each production site link to eliminate leakage and beautify the environment, achieve safe, stable, comfortable and healthy production; standardize on-site visual standards, cleaning standards and greening standards, and create standardized sites; adopt new technologies and new equipment to carry out the construction of digital workshops, improve efficiency, reduce production fluctuations, and reduce employee labor intensity. Improve employees' innovation ability and safety and environmental protection literacy, and create a safe, green and civilized modern factory with peak cultural characteristics. According to the requirements of the group company, each enterprise sorts out the areas to be improved on the work site from
9aspects such as purification and beautification, rectification and management, adding auxiliary equipment, process technology improvement, production equipment improvement, quality control improvement, operation control improvement, safety facilities improvement, and staff quality improvement, each item requires the name of the project, the current defects, the transformation plan, the goal reached after the transformation, the investment budget, the planned implementation time and the responsible person. In order to ensure the orderly and safe implementation of the on-site management projects in the plan, the group company requires that the on-site image transformation projects involved in the implementation of the plan, such as the appearance and color of buildings, general signs, etc., should be implemented according to the group's standardized atlas. If there are no provisions in the standardized atlas, all directly affiliated enterprises should report to the audit performance management department of the group company for coordination and approval, the pharmaceutical subsidiary shall report to the pharmaceutical company for coordination and approval. For the technological transformation projects in the action plan, the application and approval procedures shall be handled separately according to the internal control regulations of the group company. The project plan to be implemented during the year will be further refined and implemented according to the priority of the governance content, so as to save costs and achieve good results. At the same time, the company also requires all units to implement dynamic management of governance projects. According to technological progress or successful governance plans of brother units, the original plan can be appropriately adjusted or increased or decreased. Before the implementation of on-site governance projects, the plan should be well designed, and the governance plan should be formed by pictures, design drawings and words. The project should be implemented according to the standards. After the transformation, the good results should be upgraded to the group company standards and replicated; the group company will also give rewards to enterprises or projects that meet the governance progress and have significant effects as appropriate. (Ni Zhenyu)
More information
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
The water and soil conservation scheme of Daye Peak Mine passed the review.
The water and soil conservation plan of Jinshan limestone mine and Baiyunsi sand shale mine of Daye Peak Cement Company passed expert review a few days ago. In order to effectively prevent and control soil erosion, protect and rationally utilize water and soil resources, reduce water, drought, wind and sand disasters, and improve the ecological environment, in accordance with the "the People's Republic of China Soil and Water Conservation Law", "Management Measures for Soil and Water Conservation Programs for Development and Construction Projects" and other laws and regulations Relevant technical specifications and the requirements of local management departments, Daye Peak commissioned Daye City Soil and Water Conservation Test Station in May this year to prepare soil and water and soil and soil conservation plans for Jinshan limestone mine. Recently, the water and soil conservation plans of the two mines have been prepared and reviewed by experts. After nearly a day of careful review, the participating experts and leaders gave a high evaluation of the plan, and put forward some suggestions and opinions for improvement. At the same time, they fully affirmed Daye Peak's attitude of attaching great importance to the work of soil and water conservation in the mine, and unanimously agreed that the above two The plan passed the review. The service life of water and soil conservation scheme of Jinshan Limestone Mine and Baiyunsi Sand Shale Mine is 5 years. In the next five years, Daye Peak will entrust water and soil conservation supervision and monitoring, and gradually organize the implementation of prevention and control measures in accordance with the plan. By 2021, Daye Peak will prepare a technical evaluation report based on the implementation of the water and soil conservation plan, check the construction and implementation of responsibilities, evaluate the effect of soil erosion prevention and control, and apply for completion acceptance. (Daye Peak)
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-30
Spike Pharmaceuticals Enters Infant Drug Market
Jindal Baby Drug Co., Ltd. Established Peak Pharmaceuticals to Enter Infant Drug Market Recently, Zhejiang Jindal Baby Drug Co., Ltd., a Sino-German joint venture controlled by Peak Pharmaceuticals, completed registration. Peak Pharmaceuticals will use this as a basis to introduce German technology and products and develop the infant drug market. Zhejiang Jindel Baby Drug Co., Ltd. was jointly funded by Jianfeng Pharmaceutical, Germany Gefu Pharmaceutical Co., Ltd. and Zhuhai Hengqin Deyunjia International Trade Co., Ltd., with a registered capital of 20 million yuan, of which Jianfeng Pharmaceutical contributed 11 million yuan in cash, accounting for 55% of the registered capital. Gefu Pharmaceuticals invested 5 million yuan in the evaluation of two proprietary technologies of "diazepam suppository" and "acetaminophen suppository, 25% of the registered capital; De Yunjia contributed 4 million yuan in cash, accounting for 20% of the registered capital. The company's registered address is in Jinxi Development Zone, Jinhua City. It will rent the existing factory building of Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory for renovation, and strive to absorb their respective expertise and adopt appropriate advanced technology and scientific management methods. A modern pharmaceutical enterprise focusing on the research and development, production and sales of pharmaceutical preparations for infants and children. In this cooperation, the corresponding products of "diazepam suppository" and "acetaminophen suppository", which Ge Fu pharmaceutical has invested in with proprietary technology evaluation, have been listed in Germany, among which diazepam suppository is a therapeutic drug for anti-anxiety, sleep disorder and muscle tension increase; acetaminophen is used for fever caused by cold or cold, and also for relieving mild to moderate pain. After the establishment of the joint venture company, it will be based on these two know-how.
2020
07-31
Jinhua City People's Congress Leaders Peak Survey
On July 26, Cai Jian, deputy director of the Jinhua Municipal People's Congress, Chen Zhishi, secretary general of the Standing Committee of the National People's Congress, and a group of four people visited Jianfeng to conduct research on the introduction of talents and technological innovation, and to communicate with Jiang Xiaomeng, Yu Jianhong, Huang Jinlong, Xiang Chongping, Lan Xiaolong and other group company leaders conducted in-depth exchanges. (this newspaper reporter)
2020
07-31