Group Companies Commend 2020 Advanced
Release time:
2021-02-10
In the past 2020, the sudden outbreak of new coronary pneumonia has brought about tremendous changes in the lifestyle of the public and the business environment of enterprises, and has also brought unprecedented challenges to the industrial sectors of the peak. In this context, the company has carried out various operation and management work in an orderly manner around the general policy of "making up for shortcomings, improving quality and efficiency, and creating core competitive advantages", overcoming various difficulties, and basically completing the work established at the beginning of the year. target. At the summary and commendation meeting, Yu Jianhong, general manager of the group company, made a work report entitled "following the law, reforming and innovating, and promoting better and faster development of peaks", which actively responded to the new coronary pneumonia epidemic and ensured the safety and health of all employees. Substantial progress has been made in the construction of key investment projects. Continuously strengthen management integration and effectively improve management level; New achievements have been made in scientific and technological innovation and technological transformation. Overcome the impact of the epidemic situation and strive to expand sales; innovate the forms of personnel training, selection and introduction, optimize the salary system and improve the cohesion of enterprises. New achievements have been made in safety and environmental protection management. Strengthen party building, ideological and political work and corporate culture to enhance corporate cohesion and centripetal force; Nine aspects, including effective promotion of corporate image, influence and reputation, have made a comprehensive summary and review of the work in 2020.
2021
is the first year of the "14th Five-Year Plan" and the 100 anniversary of the founding of the Communist Party of China. It is a year of special importance in the process of China's modernization. However, there are many uncertainties in the development of the epidemic and changes in the external environment, the foundation of China's economic recovery is not yet solid, the world economic situation is still complex and severe, the recovery is unstable and unbalanced, and the various derivative risks caused by the impact of the epidemic cannot be ignored. In combination with the spirit of the 2021 Central Economic Work Conference, after a comprehensive analysis of the current national economic situation, policies and the changing trends of the company's related industries, Yu Jianhong, on behalf of the group company, proposed the 2021 work policy as "following the law, keeping the right and bringing forth the new, reforming and innovating, and continuously improving", and around this policy, proposed the key work for 2021: following the market law and trend, achieving the "five persistence", fundamentally reverse the ideological concepts of management cadres; do a good job in project management, cultivate industrial advantages, and steadily promote development; optimize the management system, strengthen management improvement, and improve management efficiency; further strengthen technological innovation, increase investment in technological transformation, and promote "digital intelligence" Factory "construction; respect market laws, pay attention to user needs, and improve marketing capabilities; do a good job in management team building to further strengthen human resource development; promote safety and environmental protection management to a new level; take party building as a guide, strengthen ideological and political work, enrich the connotation of corporate culture, and create" soft power "for enterprise competition; continue to grasp the normal management of the prevention and control of the new coronary pneumonia epidemic, and ensure that all work can be carried out smoothly.
Yu Jianhong pointed out that on the road to creating a century-old peak, we will face twists and turns, ups and downs, risks and challenges at any time, and in the face of many tests, we will never be able to solve the problem, and hope can only rest on ourselves. In 2021, the peak will also face more severe challenges. With a conscientious style, a spirit of perseverance, and unswerving perseverance, we must unite and forge ahead, innovate the old, and work hard to create a brighter future for the peak cause. At the
meeting, Yu Jianhong, on behalf of the group company, signed the 2021 economic responsibility system with Daye Peak, Yunnan Peak, Pharmaceutical Company, Health Technology Company, International Trade Company and Cable Company. Huang Jinlong, deputy general manager of the group company and chairman of Shanghai North Carolina Company, signed a responsibility system with the management team on behalf of the Shanghai North Carolina board of directors.Xiang Chongping, deputy general manager of the group company, read out the list of advanced collectives and individuals of the group company in 2020 at the conference. In 2020, a total of 20 advanced collectives such as advanced enterprises, advanced civilized workshops (departments and offices), advanced party organizations, and 25 outstanding individuals such as outstanding employees, innovative experts, outstanding management workers, and outstanding marketers were selected, and outstanding party workers, 24 advanced individuals such as outstanding party members, outstanding party members, outstanding trade union workers, advanced safety and environmental protection workers, and rookie employees were selected. In the warm atmosphere, the advanced representative of the gold enterprise took the stage to receive the award.
Zhou Jiping, the former general manager of Yunnan Jianfeng, on behalf of advanced enterprises, was at the meeting site. Dong Li, the representative of Anhui New Jianfeng North Card, and Wu Lihua, the representative of innovation expert, the representative of Guizhou Huang Ping Jianfeng, spoke by video respectively, reviewing the gains and losses of the past year's work and sharing experiences and experiences. On behalf of the group's party committee and board of directors, Jiang Xiaomeng, secretary of the party committee and chairman of the group, congratulated the commended advanced collectives and individuals, thanked all the peak employees for their hard work and achievements, and made a summary speech entitled "seize the development, seize the day and the hour, and improve the ability without delay" in view of the market situation and existing problems faced by the company that year (details are published in another article in this edition). (this newspaper reporter)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30