Sales drip
Release time:
2021-01-04
Sales Spot
made a routine visit some time ago and went to Zhenxin Mixing Station on the side of Liangzi Lake Avenue in Jiangxia. I have been to this mixing station a lot in 2016 and 2017 in the past two years. Now the station is well built, with two production lines and four 300-ton cement tanks. Speaking of it, this station has been established for a long time. It was moved from Buddha Ridge, and it has a deep relationship with the peak. There was cooperation in the old station. The young man from the materials department recalled that when he first came to work, the old station had not been demolished, the new station had just been built, and the old station and the new station were concrete together, which was not as good as today's grand occasion. The most important thing is to change the new leadership, the operation mode and management are more standardized, and the development is better.
Before I was transferred to Xianning, our former agent Chen Mingxing was the executive general manager of the station. He went out at 6 o'clock every day and got home at 7 o'clock in the evening. At that time, I didn't buy a car. It was very inconvenient to go to the station. I often took their free ride. At the beginning of August this year, shortly after I was transferred back from Xianning, I went to the station again and saw that the office area was full of cars.
Before that, I heard that Zhenxin Mixing Plant will expand its volume this year and is ready to find another supplier. When I arrived at the station, I met manager Chen of the materials department. he told me that Mr. Li was taking care of all the affairs in the station and told me Mr. Li's phone number. I made an appointment with Li very smoothly. He was very young and later learned that he was only two years older than me. For the first time, communication with Mr. Li was relatively smooth, but cooperation was not reached due to price issues. I talked several times in the middle, but there was no progress. I almost gave up. However, the relationship has not been interrupted, but also let Li see my sincerity.
Things took a turn for the better in late August. As the market turned from weak to prosperous, Mr. Li took the initiative to contact me to talk about cooperation, because the station could not operate the goods after payment, and could not make direct sales as he wished. I had to select from all the agents I knew who were more suitable for the advance payment operation. When the opportunity comes, we can't let it go. It took three days from selecting the agent to signing the contract, and finally successfully reached the cooperation. Pay and return is directly proportional, in the cement began to supply the moment, my heart is very happy.
This incident has benefited me a lot, and I always think about it. It is full of chance and necessity. Without my insistence, there would be no smooth intervention of agents, and I would not have made the current achievements. I believe that as long as willing to work hard, in the future sales work will achieve more and better performance, bloom more exciting. (Yao Sa)
More information
Tianjin Flemish Company Donates Anti-epidemic Materials
On the morning of July 13, Tianjin Jianfeng Flanders Pharmaceutical Technology Development Co., Ltd. donated materials to the Tianjin Development Zone Charity Association to help the development zone community fight the epidemic.
2020
08-05
In late July, leaders of the group company Jiang Xiaomeng, Yu Jianhong, Chen Tianci and Qin Xuping visited subordinate enterprises separately and sent heatstroke prevention and cooling supplies to employees working under high temperature, urging everyone to pay attention to heatstroke prevention and cooling and safe production work to ensure good physical condition.
2020
08-05
On July 17 and 18, the Group's work analysis meeting for the first half of 2020 was held at the Peak Building of the Group's headquarters to summarize and review the work in the first half of the year and make arrangements for the work in the second half of the year.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-22
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-31