Function of Air Switch Interlock in Equipment Operation
Release time:
2020-12-01
air switch interlock in equipment operation
air switch is a very important component in low-voltage distribution network and electric drive system. It integrates control and various protection functions. In addition to completing contact and breaking circuits, it can also protect short circuits, severe overload and undervoltage of circuits or electrical equipment. At the same time, if we make a reasonable combination of interlocking, we can also protect the equipment and system from the lack of phase, misdivision and leakage of the air switch in operation. In
operation, the protection of the motor by the phase-missing interlock of the air switch
2017 , in view of the frequent burning of the motor due to the phase-missing in the packaging lane of daye peak cement company, we decided to carry out the air switch interlock after comprehensive analysis, use three 220V intermediate relays to split the three phases at the outlet end of the air switch, and then connect the three opening points in series with each other and then in series to the control loop, the loading lane after interlocking has not burned the motor due to lack of phase so far. Protection of Equipment and System by Misdividing Interlock of Air Switch during
Operation
In 2018 , the air switch of the main motor transformer of Daye Peak Kiln was broken due to the burning of the cooling fan, resulting in excessive temperature rise of the transformer. After analyzing the reasons, we installed a 220V intermediate relay at the outlet end of the air switch of the control power supply, and then tripped the transformer to interlock and connect it to the relay closing point. After interlocking, the transformer is protected in all directions. On October 28, 2020, the limestone yard stacker due to the hydraulic station air switch misdivision caused the pile back pressure dead, to find out the reason after we use the intermediate relay for combination interlocking, and then the hydraulic station comprehensive fault interlocking and connected to the relay closing point, interlocking after the stacking system for a good protection.
During operation, the leakage and interlocking of the air switch protects the equipment
2017 . Because the auxiliary transmission of the finished 3# cake hoist is of double drive structure, there is a drawer cabinet empty during power transmission, resulting in stand-alone operation. After finding out the reason, we interlocked the air switches of the two drawer cabinets with each other and connected them in series to the control circuit, so that the equipment cannot be turned on no matter which air switch is not closed, and no matter which air switch trips and the other trips at the same time. So far, the interlocking has effectively protected the equipment.
It can be seen from the above that the reasonable combination of air switch interlocking is used flexibly in the low-voltage distribution network and electric drive system to protect the equipment well, which fully reflects the importance of air switch interlocking in the operation of the equipment. (Shi Zhangliang)
More information
Spike Health was identified as Zhejiang Agricultural Science and Technology R & D Center
Zhejiang Provincial Department of science and technology recently issued a notice, peak health technology company research and development center was identified as Zhejiang agricultural science and technology research and development center. According to the relevant requirements, Zhejiang agricultural science and technology research and development center must be established with national and provincial agricultural leading enterprises, agricultural science and technology enterprises or other scientific and technological agricultural enterprises with high scientific and technological content as the carrier, with strong economic strength and scientific and technological research and development foundation; The annual sales income of the enterprise is more than 10 million yuan, and the R & D center has more than 10 full-time technicians, of whom more than 30% have bachelor's degree or above; the annual technology development funds shall not be less than 3% of the sales revenue of the enterprise; it has the necessary instruments and equipment and fixed and special places to meet the research and development; it has the conditions for the application of agricultural technology information network. The main business of the enterprise is clear, and it is the priority industry in our province. The technological innovation achievements have a wide range of radiation, the enterprise system is sound, and the operating mechanism is good. With the domestic, provincial institutions of higher learning, scientific research units have established a stable relationship of scientific research cooperation. Since its establishment, Jianfeng Health has attached great importance to the construction of innovation platform and the cultivation of scientific and technological talents. In 2016, it has been recognized as Jinhua agricultural science and technology enterprise and municipal agricultural science and technology research and development center. In 2017, research and development investment accounted for 5.06 of sales revenue, and full-time research and development personnel with bachelor's degree or above accounted for 80.9, consisting of talents including traditional Chinese medicine, traditional Chinese medicine preparation, agriculture and biotechnology, pharmacy, analysis, plant extraction, food engineering, etc. Dr. Li Wende, head of the research and development center, was also selected "Jinhua Shuanglong plan talent" in 2017 ". In recent years, peak health and Zhejiang workers.
2020
07-31
Chairman Jiang Xiaomeng Directs Work in Yunnan Peak
On December 16, Jiang Xiaomeng, Secretary of the Party committee and chairman of the group company, went to Yunnan Jianfeng cement company to investigate and guide the work. On the morning of the same day, accompanied by the Yunnan peak management team, Jiang Xiaomeng went deep into the front line and successively went to the central control room of the production and manufacturing department, the raw material clay yard, the lignite yard and other areas for field investigation and investigation to understand the problems existing in the production and operation process. Subsequently, a business analysis meeting was held to make a comparative analysis of the various business indicators of Yunnan Jianfeng from January to November this year, and put forward two requirements to the management team: further strengthen internal management and improve execution; strengthen the coordination of external relations, and improve The ability and level of enterprise resource acquisition. At the Yunnan Jianfeng middle-level cadre meeting held on the afternoon of the 16th, Jiang Xiaomeng first fully affirmed Yunnan Jianfeng's highest output and best benefits since it was put into production in 2018, and expressed his gratitude to all cadres and employees of Yunnan Jianfeng for their hard work. After that, Jiang Xiaomeng made a detailed analysis of the cement industry and the regional market environment in Yunnan, and combined with the current production and operation situation of Yunnan Jianfeng, put forward the focus of the next step: 1. should fully attach importance to and mobilize the initiative and responsibility of employees at all levels to improve the overall execution of the team; 2. raw material mines are an important factor restricting the future development of cement enterprises, which should be paid full attention to and formulate clear strategies and methods, set out a timetable to obtain future production resources as much as possible; 3. continuously advocate and promote technological innovation, keep pace with the times, continuously improve production management, equipment management, production technology level, and maintain the competitive advantage of the industry; 4. further strengthen production
2020
07-31
Chairman Jiang Xiaomeng Directs Work in Yunnan Peak
On December 16, Jiang Xiaomeng, Secretary of the Party committee and chairman of the group company, went to Yunnan Jianfeng cement company to investigate and guide the work. On the morning of the same day, accompanied by the Yunnan peak management team, Jiang Xiaomeng went deep into the front line and successively went to the central control room of the production and manufacturing department, the raw material clay yard, the lignite yard and other areas for field investigation and investigation to understand the problems existing in the production and operation process. Subsequently, a business analysis meeting was held to make a comparative analysis of the various business indicators of Yunnan Jianfeng from January to November this year, and put forward two requirements to the management team: further strengthen internal management and improve execution; strengthen the coordination of external relations, and improve The ability and level of enterprise resource acquisition. At the Yunnan Jianfeng middle-level cadre meeting held on the afternoon of the 16th, Jiang Xiaomeng first fully affirmed Yunnan Jianfeng's highest output and best benefits since it was put into production in 2018, and expressed his gratitude to all cadres and employees of Yunnan Jianfeng for their hard work. After that, Jiang Xiaomeng made a detailed analysis of the cement industry and the regional market environment in Yunnan, and combined with the current production and operation situation of Yunnan Jianfeng, put forward the focus of the next step: 1. should fully attach importance to and mobilize the initiative and responsibility of employees at all levels to improve the overall execution of the team; 2. raw material mines are an important factor restricting the future development of cement enterprises, which should be paid full attention to and formulate clear strategies and methods, set out a timetable to obtain future production resources as much as possible; 3. continuously advocate and promote technological innovation, keep pace with the times, continuously improve production management, equipment management, production technology level, and maintain the competitive advantage of the industry; 4. further strengthen production
2020
07-30
Editor's note: On November 20, the first page of "Jinhua Daily" published "Focus on sticking to the peak forever-Enlightenment of Jianfeng Group's 60 years of entrepreneurship" written by the reporter of the newspaper, which was specially reprinted by this newspaper. Focus on sticking to the peak forever-Jianfeng Group's 60 years of entrepreneurship enlightenment "Jinhua Daily" reporter Shao Xuilian as of the end of the third quarter of this year, the total assets of 4.788 billion yuan, net assets of 3.366 billion yuan, the realization of the parent company's net profit of 0.488 billion yuan, earnings per share of 1.42 yuan. Recently, Jianfeng Group disclosed its beautiful report for the third quarter of 2018, celebrating its 60th anniversary with the best operating results in history. Wind and rain for 60 years. With sustained and steady high-quality development, the peak people are moving towards a comprehensive modern enterprise group with strong core competitiveness. Strategy: Focus and Professionalism In 1958, the first generation of peak people built the first cement factory in Jinhua history at the foot of peak mountain. Beginning in 1983, through horizontal alliances with township enterprises, the formation of enterprise groups, and the implementation of shareholding reforms, Jianfeng has developed from a small state-owned cement plant to the first listed company in China's cement industry. Since then, in the stage of diversification, the peak will develop the pharmaceutical industry into the second pillar industry. In 2007, it joined forces with the central enterprise China Building Materials to participate in the establishment of Southern Cement and strategically shifted the focus of the cement industry; at the same time, through corporate mergers and acquisitions and technological innovation, the pharmaceutical industry has further exerted its strength. Today, Jianfeng Group has 33 participating and holding subsidiaries, involving building materials, medicine, big health, modern logistics, national.
2020
07-31
News from our newspaper On the occasion of the celebration of the 60th anniversary of Jianfeng's entrepreneurship, the selection results of the two competitions of "Me and Jianfeng" essay and employee calligraphy and painting photography exhibition are also fresh. Since July 2017, more than 50 contributions have been received from employees and their families. According to the overall situation of the content and writing level of the solicitation, 3 first prize works, 5 second prize works and 7 third prize works were selected. The staff calligraphy and painting photography exhibition began to call for contributions in early April. in just five months, it received more than 100 works from dozens of authors from various enterprises under the group, and successfully held the exhibition from October 10 to 17, which was welcomed and praised by the majority of employees. After a comprehensive selection of employee contributions, a total of 3 first-class works, 5 second-class works, and 7 third-class works were selected. In order to ensure the fairness and impartiality of the selection, the works of the leading group, working group members and specially invited works to commemorate the 60th anniversary of Jianfeng Entrepreneurship will not participate in the selection of the grade award. (The list of winners is attached) (This reporter) "I and the peak" essay list first prize "mother and son deep love" author: Daye peak Shi Fu "I have a date with the peak" author: Yunnan peak Luo Meiyan "buying a house" author: peak cable Lu Chaofang second prize "ten years, sixty years" author: pharmaceutical sales company Xu Yuting "my peak road" author: daye Peak Yang Zhendong's "My Teacher" Author: Fan Tufa, Municipal Pharmaceutical Company, "Peak Grows with Me for 20 Years" Author: Xu Junxiong, Pharmaceutical Sales Company, "Peak Grows with Me"
2020
07-31