Common sense of temporary electricity safety
Release time:
2020-08-17
Temporary Electricity Safety Common Sense
Temporary electricity refers to the design, installation, use, maintenance and removal of low-voltage power systems using electric equipment and lighting on the production and construction sites during temporary overhaul or maintenance and engineering construction. The main facilities and materials for temporary power utilization include transformers, power distribution cabinets, distribution boxes, switch boxes, cables, wires, electrical tools, electric tools, lighting fixtures, electrical equipment, etc. Basic management requirements for
temporary power consumption:
1.
temporary power consumption organization design shall be prepared for the construction site with 5or more temporary power consumption equipment or the total capacity of equipment is 50kW or more. 2.
Temporary electricity consumption organization design must follow the "preparation, review and approval " procedure, which shall be organized and compiled by electrical engineering technicians and implemented after being reviewed by relevant departments and approved by the technical director of the enterprise with legal personality. 3.
Temporary power consumption project shall be constructed according to the design drawing, and shall be jointly accepted by relevant units before being put into use after being qualified.4.
Temporary electricity use must establish safety technical files, which shall be established and managed by electrical technicians. Among them, "electrician installation, inspection, maintenance and demolition work record " can be assigned to be managed by an electrician, which shall be reviewed and approved by the main person in charge or project manager every week, and shall be filed uniformly after the temporary power consumption project is demolished. 5.
Temporary power consumption shall be checked regularly, potential safety hazards shall be handled in time, and rechecked and accepted.Basic requirements for electricians and electricity users:
1.
Electricians must pass the examination and obtain the special operation certificate before taking up their posts; Other electricity users must undergo safety training and technical disclosure before they can take up their posts.2.
Installation, inspection, maintenance or removal of temporary electrical equipment and lines must be completed by an electrician and supervised by a special person.All kinds of electricity users should master the basic knowledge of safe electricity use and the performance of the equipment used, and should meet the following regulations:
1.
Before using electrical equipment, they must wear and equip corresponding labor protection articles according to regulations, and check electrical devices and protection facilities. It is strictly forbidden for equipment to operate with diseases.2.
Keep and maintain the equipment used, report and solve any problems found in time;3.
The switch box of temporarily deactivated equipment must disconnect the power isolation switch and close the door and lock it.4.
When moving electrical equipment, the power supply must be cut off by an electrician and properly handled. Introduction toElectrical Equipment:
1.
Electrical Equipment Switches shall adopt automatic control electrical appliances such as contactors and relays, and manual two-way transfer switches shall not be used as control electrical appliances.2. In the switch box of Class I
and Class IImetal shell hand-held electric tools, the rated leakage action current of the leakage protector shall not be greater than 15mA , and the rated leakage action time shall not be greater than 0.1s . 3.
When operating in wet places and on metal frames, Class IIor Class III hand-held power tools powered by safety isolation transformers must be selected. 4.
It is strictly forbidden to use Class Ihand-held electric tools in wet places or on metal frames. 5.
The load line of the water pump must adopt waterproof rubber sheathed copper core flexible cable. Any damage and joints are strictly prohibited, and no external force is allowed.When cleaning, inspecting and maintaining concrete mixers, steel bar processing machinery, woodworking machinery and other equipment, the switch box must first be switched off and powered off, showing visible power breaking points, and the door must be closed and locked.
hang the sign of no closing and be monitored by special personnel. (Liu Fengbin)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30