Concrete pouring
Release time:
2020-07-07
concrete pouring should comply with the corresponding construction specifications, special attention should be paid to:
1, concrete in the construction of water-absorbing objects involved in the corresponding treatment before pouring, in order to avoid concrete moisture absorption, affecting the quality of concrete.
2, concrete should be poured before the initial setting, and there can be no segregation phenomenon, if there is segregation phenomenon, should be re-mixing, before pouring, and pouring process should also avoid segregation phenomenon.
3. When pouring structures such as columns, a layer of 50-100mm cement mortar (the mix ratio is the same as that in concrete) shall be poured at the bottom to avoid honeycomb pitting.
4, concrete pouring, should be carried out in layers according to the structural requirements, with pouring and tamping.
5. The overall concrete pouring of general structures shall be carried out continuously as much as possible to avoid intermittent construction. In the initial stage after concrete pouring, the concrete shall be protected from vibration or impact.
7. When making cement floor, roof platform and other parts, attention should be paid to the plastering operation. Generally, it should be plastered many times until there is no bleeding on the surface, but dry powder should not be sprinkled and cured in time during the plastering process.
8. In order to prevent early cracks in road construction, attention should be paid to:
①. Under the condition of meeting the design grade of concrete, accurate measurement should be made, excessive cement should not be used, and the unit water consumption of concrete should be mastered to reduce the shrinkage of concrete.
②, do not use high-temperature cement, the cement temperature during site construction should be lower than 70 ℃. In summer construction, the pouring temperature of concrete should be reduced as much as possible, the operation time from the beginning of pouring to the completion of surface finishing should be shortened, and the concrete should be fully cured. Regardless of the circumstances and conditions, the temperature of the concrete mixture shall not exceed 35 ℃. During winter construction, the mixing time should be extended, and the discharge temperature should not be lower than 10 ℃. At the same time, after the construction of pavement concrete, the first three days of maintenance temperature should be maintained above 10 ℃, the next 7 days of maintenance temperature should be maintained above 5 ℃.
③. When using dry aggregate exposed to sunlight for a long time, water shall be fully sprinkled to cool down.
④, the top surface of the base should be fully wet before pouring concrete, or take waterproof measures.
⑤, concrete surface finishing process, to avoid direct sunlight, do not make the temperature rise and dry.
⑥. According to the strength development, master the appropriate time for plate cutting to prevent the concrete slab from breaking.
Peak Cement Implementation GB175-1999 Standard Strength Guarantee Value
| Product Species |
Strength Grade |
Compressive Strength Mpa |
flexural strength Mpa |
||
| 3d |
28d |
3d |
28d |
||
| silicate cement |
42.5R |
25.0 |
48.0 |
4.5 |
7.5 |
| 52.5 |
27.0 |
56.0 |
4.5 |
8.0 |
|
| Ordinary Silicate Cement |
32.5R |
18.0 |
40.0 |
4.0 | #
6.5 |
| 42.5 |
20.0 |
48.0 |
4.0 |
7.5 |
|
| 42.5R |
23.0 |
48. |
4.5 |
7.5 |
|
| 52.5 |
26.0 |
56.0 |
4.5 |
8.0 |
|
| Composite Cement |
32.5R |
18.0 |
40.0 |
4.0 |
6.5 |
More information
Tianjin Flemish Company Donates Anti-epidemic Materials
On the morning of July 13, Tianjin Jianfeng Flanders Pharmaceutical Technology Development Co., Ltd. donated materials to the Tianjin Development Zone Charity Association to help the development zone community fight the epidemic.
2020
08-05
In late July, leaders of the group company Jiang Xiaomeng, Yu Jianhong, Chen Tianci and Qin Xuping visited subordinate enterprises separately and sent heatstroke prevention and cooling supplies to employees working under high temperature, urging everyone to pay attention to heatstroke prevention and cooling and safe production work to ensure good physical condition.
2020
08-05
On July 17 and 18, the Group's work analysis meeting for the first half of 2020 was held at the Peak Building of the Group's headquarters to summarize and review the work in the first half of the year and make arrangements for the work in the second half of the year.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-22
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-31