concrete pouring should comply with the corresponding construction specifications, special attention should be paid to:
1, concrete in the construction of water-absorbing objects involved in the corresponding treatment before pouring, in order to avoid concrete moisture absorption, affecting the quality of concrete.
2, concrete should be poured before the initial setting, and there can be no segregation phenomenon, if there is segregation phenomenon, should be re-mixing, before pouring, and pouring process should also avoid segregation phenomenon.
3. When pouring structures such as columns, a layer of 50-100mm cement mortar (the mix ratio is the same as that in concrete) shall be poured at the bottom to avoid honeycomb pitting.
4, concrete pouring, should be carried out in layers according to the structural requirements, with pouring and tamping.
5. The overall concrete pouring of general structures shall be carried out continuously as much as possible to avoid intermittent construction. In the initial stage after concrete pouring, the concrete shall be protected from vibration or impact.
7. When making cement floor, roof platform and other parts, attention should be paid to the plastering operation. Generally, it should be plastered many times until there is no bleeding on the surface, but dry powder should not be sprinkled and cured in time during the plastering process.
8. In order to prevent early cracks in road construction, attention should be paid to:
①. Under the condition of meeting the design grade of concrete, accurate measurement should be made, excessive cement should not be used, and the unit water consumption of concrete should be mastered to reduce the shrinkage of concrete.
②, do not use high-temperature cement, the cement temperature during site construction should be lower than 70 ℃. In summer construction, the pouring temperature of concrete should be reduced as much as possible, the operation time from the beginning of pouring to the completion of surface finishing should be shortened, and the concrete should be fully cured. Regardless of the circumstances and conditions, the temperature of the concrete mixture shall not exceed 35 ℃. During winter construction, the mixing time should be extended, and the discharge temperature should not be lower than 10 ℃. At the same time, after the construction of pavement concrete, the first three days of maintenance temperature should be maintained above 10 ℃, the next 7 days of maintenance temperature should be maintained above 5 ℃.
③. When using dry aggregate exposed to sunlight for a long time, water shall be fully sprinkled to cool down.
④, the top surface of the base should be fully wet before pouring concrete, or take waterproof measures.
⑤, concrete surface finishing process, to avoid direct sunlight, do not make the temperature rise and dry.
⑥. According to the strength development, master the appropriate time for plate cutting to prevent the concrete slab from breaking.
Peak Cement Implementation GB175-1999 Standard Strength Guarantee Value
| Product Species |
Strength Grade |
Compressive Strength Mpa |
flexural strength Mpa |
||
| 3d |
28d |
3d |
28d |
||
| silicate cement |
42.5R |
25.0 |
48.0 |
4.5 |
7.5 |
| 52.5 |
27.0 |
56.0 |
4.5 |
8.0 |
|
| Ordinary Silicate Cement |
32.5R |
18.0 |
40.0 |
4.0 | #
6.5 |
| 42.5 |
20.0 |
48.0 |
4.0 |
7.5 |
|
| 42.5R |
23.0 |
48. |
4.5 |
7.5 |
|
| 52.5 |
26.0 |
56.0 |
4.5 |
8.0 |
|
| Composite Cement |
32.5R |
18.0 |
40.0 |
4.0 |
6.5 |
More information
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
The water and soil conservation scheme of Daye Peak Mine passed the review.
The water and soil conservation plan of Jinshan limestone mine and Baiyunsi sand shale mine of Daye Peak Cement Company passed expert review a few days ago. In order to effectively prevent and control soil erosion, protect and rationally utilize water and soil resources, reduce water, drought, wind and sand disasters, and improve the ecological environment, in accordance with the "the People's Republic of China Soil and Water Conservation Law", "Management Measures for Soil and Water Conservation Programs for Development and Construction Projects" and other laws and regulations Relevant technical specifications and the requirements of local management departments, Daye Peak commissioned Daye City Soil and Water Conservation Test Station in May this year to prepare soil and water and soil and soil conservation plans for Jinshan limestone mine. Recently, the water and soil conservation plans of the two mines have been prepared and reviewed by experts. After nearly a day of careful review, the participating experts and leaders gave a high evaluation of the plan, and put forward some suggestions and opinions for improvement. At the same time, they fully affirmed Daye Peak's attitude of attaching great importance to the work of soil and water conservation in the mine, and unanimously agreed that the above two The plan passed the review. The service life of water and soil conservation scheme of Jinshan Limestone Mine and Baiyunsi Sand Shale Mine is 5 years. In the next five years, Daye Peak will entrust water and soil conservation supervision and monitoring, and gradually organize the implementation of prevention and control measures in accordance with the plan. By 2021, Daye Peak will prepare a technical evaluation report based on the implementation of the water and soil conservation plan, check the construction and implementation of responsibilities, evaluate the effect of soil erosion prevention and control, and apply for completion acceptance. (Daye Peak)
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-30
Spike Pharmaceuticals Enters Infant Drug Market
Jindal Baby Drug Co., Ltd. Established Peak Pharmaceuticals to Enter Infant Drug Market Recently, Zhejiang Jindal Baby Drug Co., Ltd., a Sino-German joint venture controlled by Peak Pharmaceuticals, completed registration. Peak Pharmaceuticals will use this as a basis to introduce German technology and products and develop the infant drug market. Zhejiang Jindel Baby Drug Co., Ltd. was jointly funded by Jianfeng Pharmaceutical, Germany Gefu Pharmaceutical Co., Ltd. and Zhuhai Hengqin Deyunjia International Trade Co., Ltd., with a registered capital of 20 million yuan, of which Jianfeng Pharmaceutical contributed 11 million yuan in cash, accounting for 55% of the registered capital. Gefu Pharmaceuticals invested 5 million yuan in the evaluation of two proprietary technologies of "diazepam suppository" and "acetaminophen suppository, 25% of the registered capital; De Yunjia contributed 4 million yuan in cash, accounting for 20% of the registered capital. The company's registered address is in Jinxi Development Zone, Jinhua City. It will rent the existing factory building of Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory for renovation, and strive to absorb their respective expertise and adopt appropriate advanced technology and scientific management methods. A modern pharmaceutical enterprise focusing on the research and development, production and sales of pharmaceutical preparations for infants and children. In this cooperation, the corresponding products of "diazepam suppository" and "acetaminophen suppository", which Ge Fu pharmaceutical has invested in with proprietary technology evaluation, have been listed in Germany, among which diazepam suppository is a therapeutic drug for anti-anxiety, sleep disorder and muscle tension increase; acetaminophen is used for fever caused by cold or cold, and also for relieving mild to moderate pain. After the establishment of the joint venture company, it will be based on these two know-how.
2020
07-31
Jinhua City People's Congress Leaders Peak Survey
On July 26, Cai Jian, deputy director of the Jinhua Municipal People's Congress, Chen Zhishi, secretary general of the Standing Committee of the National People's Congress, and a group of four people visited Jianfeng to conduct research on the introduction of talents and technological innovation, and to communicate with Jiang Xiaomeng, Yu Jianhong, Huang Jinlong, Xiang Chongping, Lan Xiaolong and other group company leaders conducted in-depth exchanges. (this newspaper reporter)
2020
07-31