Guo Zhijian: Equipment "Housekeeper" in Cable Workshop"
Release time:
2020-07-22
Guo Zhijian: The equipment "housekeeper"
of the cable workshop found Guo Zhijian in the maintenance room behind the cable production workshop. He just wanted to go to the workshop to see the startup of the refitting machine. This refitting machine is the old equipment bought back last year. It was installed last year and has been continuously improved and debugged. This startup shows that the equipment has been debugged to the best operating state.
Guo Zhijian is mainly responsible for the electrical maintenance of the cable company, but he will also participate in the maintenance when there is a major mechanical failure of the equipment. His office is a small room in the maintenance interval. Toolboxes are placed on the tables and chairs in the small room. Tools that have not yet been packed are placed in the boxes. The most conspicuous ones should be the two shelves in the room. Small parts and some old parts of the equipment are piled on them, and all kinds of old drives occupy nearly one shelf. These old drives are Guo Zhijian's "treasures". He said that although most of them are broken and can't be repaired, they are still reluctant to throw them away because the parts on these devices will come in handy again without knowing when.
Guo Zhijian entered the cable company in 1994 . He was an ordinary operator on the tandem line at the earliest, because he preferred to study the electrical field. When there was a problem with the equipment on the production line, he followed the mechanic to watch. In 2004 , he changed his job to do machine repair and was responsible for electrical maintenance. At first, there were still people with him. By 2008 , he was the only electrician in the cable factory, and each manufacturer's electric control equipment had its own unique design, which had to be familiar with by himself. But it was also the foundation that was laid at that time. Now we can know all about the procurement, installation and commissioning of old equipment, and equipment transformation.
2019 is the year with the most equipment installed and modified since the cable company moved the factory. Due to the need of the order, the cable company received an order last year to produce steel belt winding cables, but the factory did not have steel belt winding equipment. if a new equipment was purchased, it would cost 24 yuan. finally, the cable company decided to purchase a set of old equipment. After many consultations, a suitable one was found, so Guo Zhijian went to see the equipment with his purchasing colleagues. As an old employee who has dealt with cable equipment for more than 20 years, Guo Zhijian had an estimate in his heart after seeing the situation of the old equipment. Finally, he added some accessories and installation costs 7 yuan to win it. He worked overtime with other personnel in the machine repair team to complete the installation and debugging of the equipment in 8-9 last year, which not only saved the cost for the cable company, it also ensured the normal delivery of that batch of orders, which made the customers very satisfied. 2018 , the cable company received a batch of orders for central plastic pipe products. At that time, most of the pay-off equipment in the factory was passive pay-off. The pay-off tension of this equipment was uneven, the wires were easy to be thinned, the performance of the produced cables was not good, and the product quality could not be guaranteed. However, the purchase of a 12 active pay-off device requires more than 30 million yuan. Considering that there is an extra 12 passive pay-off device for the city telephone cable, Guo Zhijian and the mechanic worked together to study and reform it. "The second one has experience in transformation. The processing time of accessories is faster than that of the first one. Now it has been completed." Guo Zhijian said that when the first one was transformed, some detours were taken because there was no reference data, but in the end the transformation was successful, the use effect was very good, and the product was delivered smoothly.
The tractor bought last year has not had time to install it before. This year affected by the epidemic, the Spring Festival holiday time extended, considering the installation will be more complex, electrical transformation, to reinstall the drive, these need to take more time. So on January , Guo Zhijian and two mechanics invited retired Hua Yongming to take protective measures and come back early to install the equipment. When the work resumed, the installation was basically completed. There are a lot of such small modifications, some to meet product needs, some to better product quality, and some to save costs...
More information
Since the implementation of the large-scale inspection in early November 2016, Daye Jianfeng Cement Company has embarked on a comprehensive institutional adjustment and optimization, which has been carried out for more than five months. In just a few months, the internal management of Daye Peak has achieved a preliminary transformation, the process has been further straightened out, and the work efficiency has also been significantly improved. Reduce the hierarchy and further flatten the management. In the past, in order to avoid responsibilities, there were often repeated and overlapping settings in the setting of enterprise posts, and even there were cases where no one handled the accident and no one took responsibility. In order to truly realize flat management, daye peak merged the original production department, technology department, manufacturing workshop and finished product workshop to form a manufacturing department in early January this year after the implementation of large-scale inspection. Merging the former Environmental Security Department and the Comprehensive Management and Security Department to form the Environmental Security Department; The purchasing functions of the original departments were merged into the purchasing department. The functions of the infrastructure section of the former comprehensive management department were merged into the waste heat power generation department. After the adjustment of the organization, the members of the management team in charge of production also served as department managers, realizing the "sinking" of management ". Adjust and formulate the responsibility system to ensure that tasks are on duty and responsibilities are on duty. In response to changes in institutions and job settings, Daye Peak has carried out a comprehensive revision of the job responsibility system, making requirements around the key indicators of various departments and positions, and implementing "personalization" of responsibilities ". For example, the relevant indicators of mechanics focus on the consumption of machinery and materials, the operation rate of the equipment under their jurisdiction, and the failure time, and the hook for cement and clinker production has been canceled. Responsibility assessment is carried out according to post responsibilities and relevant management systems, and the assessment has been strengthened. In order to understand the actual effect of daye peak institutional reform, on March 30, the group company
2020
07-31
Group Party Committee to determine the annual work plan
The party Committee of the group company has determined its work ideas and work plan for 2017 a few days ago, and relevant work has been arranged below. In view of the current new political and economic situation and the task of enterprise transformation and development, the general requirements of the Party Committee of the Group Company for 2017 are: to thoroughly study and implement the spirit of the Sixth Plenary Session of the 18th CPC Central Committee and the series of important speeches by General Secretary Xi Jinping, the spirit of the Seventh Party Congress of Jinhua City, to closely revolve around the center of enterprise production, operation and reform and development, and to adhere to scientific development and cross-regional development as the first priority, in order to continue to carry out the study and education of "five stars striving for innovation" and "two learning and one doing", we should highlight the main line of comprehensively and strictly administering the party according to the rules, firmly establish the political awareness, overall situation awareness, core awareness and alignment consciousness of the majority of Party members and cadres, strengthen and improve the party building work in enterprises in the spirit of reform, and strive to improve the scientific, standardized and institutionalized level of Party building work in enterprises, in order to promote the scientific development of the group company, leapfrog development and harmonious development, it provides a strong political, ideological and organizational guarantee. The working idea of the Party Committee of the Group Company in 2017 is to focus on "one center", adhere to "one concept", highlight "three key points" and do a good job in "three constructions". That is: centering on the "one center" of enterprise production, operation and reform and development, we should strive to strengthen the "one concept" of "the organic unity of the party's leadership and the improvement of corporate governance"; to "thoroughly implement the main responsibility of the party committee; continue to carry out the study and education of" two learning and one doing "; and improve the system of party building work" as the "three key points", and focus on "team building and team building
2020
07-30
End of 2016 Qualification Review
According to our newspaper, the 2016 employee qualification evaluation work ended a few days ago, and 380 employees obtained new qualifications. Since the implementation of the employee qualification evaluation system in 2010, it has produced certain results in promoting employees to strengthen self-learning and improve and establish a multi-channel career development system for employees. Since the company's cement sector was included in the scope of qualification management for the first time, in accordance with the relevant regulations of the company's employee qualification management, the written examination for this review was conducted in Jinhua, Daye, and Pu'er on December 25, 2016. After professional knowledge examination, performance evaluation and comprehensive evaluation, the qualification of the corresponding grade and grade is finally determined. A total of 380 employees participated in the review, including 40 in management, 59 in technology and 281 in technicians. According to the unit, there are 2 people in the group department, 186 in daye peak, 89 in Yunnan peak, 56 in pharmaceutical company, 6 in international trade company and 41 in peak health. For employees who apply for qualifications above level 3, Group Barton organized a unified review. According to the final results, more than 6 per cent of the total number of persons rated as three or more qualified. (this newspaper reporter)
2020
07-31
Group Party Committee to determine the annual work plan
The party Committee of the group company has determined its work ideas and work plan for 2017 a few days ago, and relevant work has been arranged below. In view of the current new political and economic situation and the task of enterprise transformation and development, the general requirements of the Party Committee of the Group Company for 2017 are: to thoroughly study and implement the spirit of the Sixth Plenary Session of the 18th CPC Central Committee and the series of important speeches by General Secretary Xi Jinping, the spirit of the Seventh Party Congress of Jinhua City, to closely revolve around the center of enterprise production, operation and reform and development, and to adhere to scientific development and cross-regional development as the first priority, in order to continue to carry out the study and education of "five stars striving for innovation" and "two learning and one doing", we should highlight the main line of comprehensively and strictly administering the party according to the rules, firmly establish the political awareness, overall situation awareness, core awareness and alignment consciousness of the majority of Party members and cadres, strengthen and improve the party building work in enterprises in the spirit of reform, and strive to improve the scientific, standardized and institutionalized level of Party building work in enterprises, in order to promote the scientific development of the group company, leapfrog development and harmonious development, it provides a strong political, ideological and organizational guarantee. The working idea of the Party Committee of the Group Company in 2017 is to focus on "one center", adhere to "one concept", highlight "three key points" and do a good job in "three constructions". That is: centering on the "one center" of enterprise production, operation and reform and development, we should strive to strengthen the "one concept" of "the organic unity of the party's leadership and the improvement of corporate governance"; to "thoroughly implement the main responsibility of the party committee; continue to carry out the study and education of" two learning and one doing "; and improve the system of party building work" as the "three key points", and focus on "team building and team building
2020
07-31
Yunnan peak through the safety standard secondary acceptance
On March 21, Yunnan Jianfeng Cement Company successfully passed the evaluation and acceptance of secondary enterprises for safety production standardization. On the same day, a review team composed of leaders of the Yunnan Provincial Work Safety Supervision Bureau and relevant experts reviewed the implementation of the establishment of Yunnan Jianfeng safety production standardization secondary enterprises. According to the 13 elements involved in the "Standard for Assessment and Rating of Safety Production Standardization in Cement Enterprises", the review team conducted strict assessment and scoring item by item through grouping to check the site and review the data, and finally determined that Yunnan Peak passed the standard acceptance of safety standardization secondary enterprises. Yunnan Jianfeng has always attached great importance to safety production. After passing the three-level safety standard enterprise review in 2015, in order to raise the level of enterprise safety management to a new level, in 2016, it began to create secondary safety standardization. Over the past year, Yunnan Jianfeng has insisted on taking the creation of secondary safety standards as the top priority of production and operation management, and has formulated an implementation plan for production safety standardization in accordance with the requirements of national standardization norms. the content covers production safety responsibility system, education and training, safety inspection, safety facilities management and other safety production management standards, systems and post safety operation procedures, while further strengthening daily safety inspection and regularly organizing emergency plan drills, strengthen the investigation and rectification of potential safety hazards and the supervision of important hazard sources, and further consolidate the foundation of enterprise safety production management. After the review, Zhou Jiping, general manager of Yunnan Jianfeng, said that Yunnan Jianfeng will take this standard as a new starting point. On the basis of consolidating the accident-free achievements in production safety for two consecutive years, it will conscientiously implement the main responsibility of production safety and cultivate
2020
07-31
Yunnan peak through the safety standard secondary acceptance
On March 21, Yunnan Jianfeng Cement Company successfully passed the evaluation and acceptance of secondary enterprises for safety production standardization. On the same day, a review team composed of leaders of the Yunnan Provincial Work Safety Supervision Bureau and relevant experts reviewed the implementation of the establishment of Yunnan Jianfeng safety production standardization secondary enterprises. According to the 13 elements involved in the "Standard for Assessment and Rating of Safety Production Standardization in Cement Enterprises", the review team conducted strict assessment and scoring item by item through grouping to check the site and review the data, and finally determined that Yunnan Peak passed the standard acceptance of safety standardization secondary enterprises. Yunnan Jianfeng has always attached great importance to safety production. After passing the three-level safety standard enterprise review in 2015, in order to raise the level of enterprise safety management to a new level, in 2016, it began to create secondary safety standardization. Over the past year, Yunnan Jianfeng has insisted on taking the creation of secondary safety standards as the top priority of production and operation management, and has formulated an implementation plan for production safety standardization in accordance with the requirements of national standardization norms. the content covers production safety responsibility system, education and training, safety inspection, safety facilities management and other safety production management standards, systems and post safety operation procedures, while further strengthening daily safety inspection and regularly organizing emergency plan drills, strengthen the investigation and rectification of potential safety hazards and the supervision of important hazard sources, and further consolidate the foundation of enterprise safety production management. After the review, Zhou Jiping, general manager of Yunnan Jianfeng, said that Yunnan Jianfeng will take this standard as a new starting point. On the basis of consolidating the accident-free achievements in production safety for two consecutive years, it will conscientiously implement the main responsibility of production safety and cultivate
2020
07-31