Guo Zhijian: Equipment "Housekeeper" in Cable Workshop"
Release time:
2020-07-22
Guo Zhijian: The equipment "housekeeper"
of the cable workshop found Guo Zhijian in the maintenance room behind the cable production workshop. He just wanted to go to the workshop to see the startup of the refitting machine. This refitting machine is the old equipment bought back last year. It was installed last year and has been continuously improved and debugged. This startup shows that the equipment has been debugged to the best operating state.
Guo Zhijian is mainly responsible for the electrical maintenance of the cable company, but he will also participate in the maintenance when there is a major mechanical failure of the equipment. His office is a small room in the maintenance interval. Toolboxes are placed on the tables and chairs in the small room. Tools that have not yet been packed are placed in the boxes. The most conspicuous ones should be the two shelves in the room. Small parts and some old parts of the equipment are piled on them, and all kinds of old drives occupy nearly one shelf. These old drives are Guo Zhijian's "treasures". He said that although most of them are broken and can't be repaired, they are still reluctant to throw them away because the parts on these devices will come in handy again without knowing when.
Guo Zhijian entered the cable company in 1994 . He was an ordinary operator on the tandem line at the earliest, because he preferred to study the electrical field. When there was a problem with the equipment on the production line, he followed the mechanic to watch. In 2004 , he changed his job to do machine repair and was responsible for electrical maintenance. At first, there were still people with him. By 2008 , he was the only electrician in the cable factory, and each manufacturer's electric control equipment had its own unique design, which had to be familiar with by himself. But it was also the foundation that was laid at that time. Now we can know all about the procurement, installation and commissioning of old equipment, and equipment transformation.
2019 is the year with the most equipment installed and modified since the cable company moved the factory. Due to the need of the order, the cable company received an order last year to produce steel belt winding cables, but the factory did not have steel belt winding equipment. if a new equipment was purchased, it would cost 24 yuan. finally, the cable company decided to purchase a set of old equipment. After many consultations, a suitable one was found, so Guo Zhijian went to see the equipment with his purchasing colleagues. As an old employee who has dealt with cable equipment for more than 20 years, Guo Zhijian had an estimate in his heart after seeing the situation of the old equipment. Finally, he added some accessories and installation costs 7 yuan to win it. He worked overtime with other personnel in the machine repair team to complete the installation and debugging of the equipment in 8-9 last year, which not only saved the cost for the cable company, it also ensured the normal delivery of that batch of orders, which made the customers very satisfied. 2018 , the cable company received a batch of orders for central plastic pipe products. At that time, most of the pay-off equipment in the factory was passive pay-off. The pay-off tension of this equipment was uneven, the wires were easy to be thinned, the performance of the produced cables was not good, and the product quality could not be guaranteed. However, the purchase of a 12 active pay-off device requires more than 30 million yuan. Considering that there is an extra 12 passive pay-off device for the city telephone cable, Guo Zhijian and the mechanic worked together to study and reform it. "The second one has experience in transformation. The processing time of accessories is faster than that of the first one. Now it has been completed." Guo Zhijian said that when the first one was transformed, some detours were taken because there was no reference data, but in the end the transformation was successful, the use effect was very good, and the product was delivered smoothly.
The tractor bought last year has not had time to install it before. This year affected by the epidemic, the Spring Festival holiday time extended, considering the installation will be more complex, electrical transformation, to reinstall the drive, these need to take more time. So on January , Guo Zhijian and two mechanics invited retired Hua Yongming to take protective measures and come back early to install the equipment. When the work resumed, the installation was basically completed. There are a lot of such small modifications, some to meet product needs, some to better product quality, and some to save costs...
More information
In the eastern corner of the production area of Jianfeng Health Technology Company, there is a very inconspicuous building. From below, only a few pipes of uneven thickness can be seen on the top and the slogan "Focus on Environmental Protection and Promote Sustainable Development" with red letters on the yellow background on the stainless steel guardrail. Walking up, you can only see several closed pools and a small room with stacks of documents, test tubes, glass bottles and other testing tools on the table. This is the peak and healthy sewage treatment station. The production sewage of the whole factory area is concentrated here. After adjustment (PH adjustment), pre-acidification, anaerobic, anoxic, aerobic (aeration), precipitation and other links, it is discharged into the pipe network after reaching the special discharge standard. Yin Zhiwu, executive deputy general manager of Jianfeng Health, said that because the sewage treatment station in Wucheng District has not yet been built, Jianfeng Health has not yet been able to achieve pipe discharge, and the relevant national laws have strict requirements on the discharge of water pollutants from the extraction pharmaceutical industry. Sewage discharge must reach a special discharge limit, that is, chemical oxygen demand (COD) must be less than 50 mg/L. Enterprise development and environmental protection are both the concept of peak health since its establishment. In March this year, on the basis of the original environmental protection facilities, Jianfeng Health carried out technical renovation of waste gas collection and treatment facilities, and at the same time installed a sealing cover on the sewage treatment station to realize the closed collection of waste gas. Since the trial operation of this facility in mid-May, the overall effect has been obvious. The original treatment tank would emit an unpleasant smell during work, but now the smell has been significantly reduced. Compared with the young enterprise of peak health, the relatively "older" peak pharmaceutical has more experience in sewage treatment and environmental protection. Akihama
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-30
Jianfeng Pharmaceutical Won Advanced Collective of Municipal Red Cross Humanitarian Promotion Award
On April 24, the Red Cross Society of Jinhua issued a circular commending the advanced units and individuals of the 2016 Red Cross Humanitarian Promotion Award. Peak Pharmaceutical Company won the Red Cross Humanitarian Promotion Award for Advanced Collective. The Red Cross is a social relief organization engaged in humanitarian work, with the purpose of carrying forward the spirit of humanity, fraternity and dedication, protecting human life and health, and promoting the cause of peace and progress of mankind. As a socially responsible enterprise, Jianfeng Pharmaceutical has always attached importance to public welfare and charity work, vigorously promoted the spirit of the Red Cross, and vigorously supported the work of the Red Cross with practical actions. In September 2016, at the theme publicity activity of "World First Aid Day" and the opening ceremony of the municipal Red Cross emergency rescue station (point), Huang Jinlong, deputy general manager of the group company and general manager of the pharmaceutical company, donated 6 AEDs known as "life-saving artifact" to the Red Cross on behalf of Jianfeng Pharmaceutical, it is equipped with six Red Cross emergency rescue service stations (points), namely, Jinhua high-speed railway station, sports center, cultural center, Shuanglong scenic spot, Siping village scenic spot and Suoyuan village scenic spot. The configuration of AED equipment has played a very good role in improving the emergency rescue capacity of Jinhua's key locations, and has been affirmed by the Red Cross and related units. (Spike Pharmaceuticals)
2020
07-31
Jingmai Airport Test Flight Successfully Runway Cement Spike Manufacturing
On April 7, a Boeing 737-700 aircraft of China Eastern Airlines Yunnan took off from Kunming. After completing two flight test subjects, it landed safely at Lancang Jingmai Airport. This not only marked the basic completion of the airport flight area, The official start of the test flight also marked that the "Peak" brand airport runway cement passed the first "final exam". Lancang Jingmai Airport is a major project with milestone significance in the history of Pu'er transportation construction. Since then, an air corridor connecting southwest Yunnan and Southeast Asia has been added between Kunming and Pu'er, which will greatly promote the development and utilization of tourism resources in Lancang, Menglian and Ximeng "Pu'er Green Triangle" area, and promote the sustainable development of local economy and society; it is of great significance to strengthen the city's national defense construction, maintain border stability, promote national unity, improve emergency rescue capabilities, and promote Pu'er's integration into the country's "Belt and Road" construction. Since the start of the construction of the airport, Yunnan Jianfeng has been paying close attention to it, organizing technical research and repeated tests, and finally produced high-quality airport runway special cement, and with excellent product quality, superior product performance and high-quality service, it has become a runway for Lancang Airport. Cement manufacturer. This not only fills the gap of "peak" airport special cement, but also is of great significance to promote the "peak" brand and improve the market influence of enterprises. It is understood that Jingmai Airport is initially confirmed to be officially opened to traffic at the end of May. (Li Liangping)
2020
07-31