Akihama Public Works Class: Guaranteed operation and reduced energy consumption
Release time:
2020-07-15
Qiubin Public Works Class of Jianfeng Pharmaceutical Factory is a team with an average working life of more than 20 years. This group of 8 people is responsible for the daily maintenance, operation and maintenance and technical transformation of Qiubin Factory, artificial bezoar production line, water station, product development department and the whole factory.
study frequently and continuously improve their business level
as mechanics and electricians, they have to inspect the equipment on the production line every day. where there is a failure, there will be mechanics. Tang Songnian, an electrician, said that when there were problems with the equipment on the production line of the Qiubin factory, they were all solved by themselves. One reason was that it took time to find the manufacturer's technicians to repair it, but the production could not afford to wait. Another reason is that the maintenance costs of the manufacturers are very high. In the face of urgent market demand, maintenance teams do not rely on each other to solve problems and ensure the normal production and supply of products. At the beginning of the establishment of
Qiubin Factory, a soft bag line, which was the most advanced at that time, was purchased and installed. All the equipment was imported from the United States. After installation, the debugging and maintenance were all carried out by the personnel of the machine repair team. Because it is all imported, there is a problem with the equipment, not to mention that it takes a long time for the technicians of the manufacturers to repair, even the consultation is not so convenient, so only the mechanics and electricians can check the data and study the equipment themselves. However, the instructions are all in English, and Tang Songnian can only rely on translation software to understand the equipment of this production line according to their own experience and knowledge. The employees of
Qiubin Public Works Class are all old employees of Jianfeng Pharmaceutical Factory. They have always attached great importance to the accumulation of experience, strengthened communication with equipment manufacturers in their daily work, and continuously learned new theoretical knowledge and improved their own business level in combination with the characteristics of fast updating of equipment technology. At the same time, according to the actual production needs, analyze the problems and improve the equipment, while ensuring the product quality, further improve the production efficiency and equipment operation rate, and reduce energy consumption. When working hours are busy, everyone uses the time after work to study. They feel that technology is constantly improving. If they do not strengthen their own learning, they will be eliminated by this society.
gives full play to its own advantages and actively carries out technological innovation
Qiubin factory area was built earlier. The equipment on the production line was the most advanced at that time, but according to the current technological requirements, sometimes the energy consumption of the equipment will be affected. In the face of such equipment, team members start from the standardization of production safety, try every means to use good equipment, optimize and transform the equipment, give full play to the maximum benefits of the equipment, and lay a solid foundation for production and operation. In 2019, the Qiubin public works and machine repair electrician team in energy saving and consumption reduction results significantly, the full year in the preparation, raw materials production increased by 10%, 50%, power consumption decreased by 266000, down 17.5 percent year-on-year. The staff of
team reformed the cold water control system that had been paralyzed for many years according to the problems found in the usual inspection and daily production. On the premise of not changing the function of the original design drawing, the frequency conversion technology was adopted to change the motor running speed, and the automatic timing function of equipment operation was added. After the transformation, the power consumption of chilled water decreased by 67% and the cooling pump decreased by 72%. The cooling tower is equipped with frequency conversion device, the frequency is changed to reduce the motor speed, and the operation automatic timing function is added, the energy consumption is reduced by 86%; The blower that runs 24 hours a day in the sewage treatment system is equipped with frequency conversion device to adjust the speed, thus reducing the electric energy, and the operation timing function is installed to reduce the energy consumption by 44%. The renovation of the external steam supply and drain pipelines has saved the steam cost by 163000 yuan and the whole year, reducing the consumption by 34%; through the transformation of water supply pipeline and the adjustment of water consumption mode of water station, adjust the parameters of concentrated water discharge control valve, reduce concentrated water discharge, improve the output of qualified water, reduce water consumption...
The transformation of these equipment, or the maintenance personnel in the daily inspection, equipment maintenance, or water station staff in the process of operation, through daily observation, and then according to their own experience analysis put forward reasonable suggestions. The workshop conducts a reasonableness assessment based on these recommendations, and then implements the responsibility for rectification. Tang Songnian said that these renovations were designed, drawn drawings, bought materials and installed and renovated by themselves. Since they are all changed on the original basis, the scope involved will be wider than that of the newly installed equipment, and there will be more restrictions and considerations. Therefore, it will take several days to draw the drawings for each transformation. Time, repeated modifications can be completed, which is also the most energy-consuming link in the transformation process.
Public works class employees have a strong sense of belonging to the enterprise. They really take the enterprise as their home and think about the enterprise from the heart. This is also the influence of the peak culture accumulated for a long time. In normal work, all employees actively find problems in their own jobs, put forward reasonable suggestions, reduce energy consumption while ensuring the normal operation of equipment, reduce costs for enterprises from all aspects, and enhance product competitiveness. (Reporter Ni Yingzhen)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30