Akihama Public Works Class: Guaranteed operation and reduced energy consumption
Release time:
2020-07-15
Qiubin Public Works Class of Jianfeng Pharmaceutical Factory is a team with an average working life of more than 20 years. This group of 8 people is responsible for the daily maintenance, operation and maintenance and technical transformation of Qiubin Factory, artificial bezoar production line, water station, product development department and the whole factory.
study frequently and continuously improve their business level
as mechanics and electricians, they have to inspect the equipment on the production line every day. where there is a failure, there will be mechanics. Tang Songnian, an electrician, said that when there were problems with the equipment on the production line of the Qiubin factory, they were all solved by themselves. One reason was that it took time to find the manufacturer's technicians to repair it, but the production could not afford to wait. Another reason is that the maintenance costs of the manufacturers are very high. In the face of urgent market demand, maintenance teams do not rely on each other to solve problems and ensure the normal production and supply of products. At the beginning of the establishment of
Qiubin Factory, a soft bag line, which was the most advanced at that time, was purchased and installed. All the equipment was imported from the United States. After installation, the debugging and maintenance were all carried out by the personnel of the machine repair team. Because it is all imported, there is a problem with the equipment, not to mention that it takes a long time for the technicians of the manufacturers to repair, even the consultation is not so convenient, so only the mechanics and electricians can check the data and study the equipment themselves. However, the instructions are all in English, and Tang Songnian can only rely on translation software to understand the equipment of this production line according to their own experience and knowledge. The employees of
Qiubin Public Works Class are all old employees of Jianfeng Pharmaceutical Factory. They have always attached great importance to the accumulation of experience, strengthened communication with equipment manufacturers in their daily work, and continuously learned new theoretical knowledge and improved their own business level in combination with the characteristics of fast updating of equipment technology. At the same time, according to the actual production needs, analyze the problems and improve the equipment, while ensuring the product quality, further improve the production efficiency and equipment operation rate, and reduce energy consumption. When working hours are busy, everyone uses the time after work to study. They feel that technology is constantly improving. If they do not strengthen their own learning, they will be eliminated by this society.
gives full play to its own advantages and actively carries out technological innovation
Qiubin factory area was built earlier. The equipment on the production line was the most advanced at that time, but according to the current technological requirements, sometimes the energy consumption of the equipment will be affected. In the face of such equipment, team members start from the standardization of production safety, try every means to use good equipment, optimize and transform the equipment, give full play to the maximum benefits of the equipment, and lay a solid foundation for production and operation. In 2019, the Qiubin public works and machine repair electrician team in energy saving and consumption reduction results significantly, the full year in the preparation, raw materials production increased by 10%, 50%, power consumption decreased by 266000, down 17.5 percent year-on-year. The staff of
team reformed the cold water control system that had been paralyzed for many years according to the problems found in the usual inspection and daily production. On the premise of not changing the function of the original design drawing, the frequency conversion technology was adopted to change the motor running speed, and the automatic timing function of equipment operation was added. After the transformation, the power consumption of chilled water decreased by 67% and the cooling pump decreased by 72%. The cooling tower is equipped with frequency conversion device, the frequency is changed to reduce the motor speed, and the operation automatic timing function is added, the energy consumption is reduced by 86%; The blower that runs 24 hours a day in the sewage treatment system is equipped with frequency conversion device to adjust the speed, thus reducing the electric energy, and the operation timing function is installed to reduce the energy consumption by 44%. The renovation of the external steam supply and drain pipelines has saved the steam cost by 163000 yuan and the whole year, reducing the consumption by 34%; through the transformation of water supply pipeline and the adjustment of water consumption mode of water station, adjust the parameters of concentrated water discharge control valve, reduce concentrated water discharge, improve the output of qualified water, reduce water consumption...
The transformation of these equipment, or the maintenance personnel in the daily inspection, equipment maintenance, or water station staff in the process of operation, through daily observation, and then according to their own experience analysis put forward reasonable suggestions. The workshop conducts a reasonableness assessment based on these recommendations, and then implements the responsibility for rectification. Tang Songnian said that these renovations were designed, drawn drawings, bought materials and installed and renovated by themselves. Since they are all changed on the original basis, the scope involved will be wider than that of the newly installed equipment, and there will be more restrictions and considerations. Therefore, it will take several days to draw the drawings for each transformation. Time, repeated modifications can be completed, which is also the most energy-consuming link in the transformation process.
Public works class employees have a strong sense of belonging to the enterprise. They really take the enterprise as their home and think about the enterprise from the heart. This is also the influence of the peak culture accumulated for a long time. In normal work, all employees actively find problems in their own jobs, put forward reasonable suggestions, reduce energy consumption while ensuring the normal operation of equipment, reduce costs for enterprises from all aspects, and enhance product competitiveness. (Reporter Ni Yingzhen)
More information
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
The water and soil conservation scheme of Daye Peak Mine passed the review.
The water and soil conservation plan of Jinshan limestone mine and Baiyunsi sand shale mine of Daye Peak Cement Company passed expert review a few days ago. In order to effectively prevent and control soil erosion, protect and rationally utilize water and soil resources, reduce water, drought, wind and sand disasters, and improve the ecological environment, in accordance with the "the People's Republic of China Soil and Water Conservation Law", "Management Measures for Soil and Water Conservation Programs for Development and Construction Projects" and other laws and regulations Relevant technical specifications and the requirements of local management departments, Daye Peak commissioned Daye City Soil and Water Conservation Test Station in May this year to prepare soil and water and soil and soil conservation plans for Jinshan limestone mine. Recently, the water and soil conservation plans of the two mines have been prepared and reviewed by experts. After nearly a day of careful review, the participating experts and leaders gave a high evaluation of the plan, and put forward some suggestions and opinions for improvement. At the same time, they fully affirmed Daye Peak's attitude of attaching great importance to the work of soil and water conservation in the mine, and unanimously agreed that the above two The plan passed the review. The service life of water and soil conservation scheme of Jinshan Limestone Mine and Baiyunsi Sand Shale Mine is 5 years. In the next five years, Daye Peak will entrust water and soil conservation supervision and monitoring, and gradually organize the implementation of prevention and control measures in accordance with the plan. By 2021, Daye Peak will prepare a technical evaluation report based on the implementation of the water and soil conservation plan, check the construction and implementation of responsibilities, evaluate the effect of soil erosion prevention and control, and apply for completion acceptance. (Daye Peak)
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-30
Spike Pharmaceuticals Enters Infant Drug Market
Jindal Baby Drug Co., Ltd. Established Peak Pharmaceuticals to Enter Infant Drug Market Recently, Zhejiang Jindal Baby Drug Co., Ltd., a Sino-German joint venture controlled by Peak Pharmaceuticals, completed registration. Peak Pharmaceuticals will use this as a basis to introduce German technology and products and develop the infant drug market. Zhejiang Jindel Baby Drug Co., Ltd. was jointly funded by Jianfeng Pharmaceutical, Germany Gefu Pharmaceutical Co., Ltd. and Zhuhai Hengqin Deyunjia International Trade Co., Ltd., with a registered capital of 20 million yuan, of which Jianfeng Pharmaceutical contributed 11 million yuan in cash, accounting for 55% of the registered capital. Gefu Pharmaceuticals invested 5 million yuan in the evaluation of two proprietary technologies of "diazepam suppository" and "acetaminophen suppository, 25% of the registered capital; De Yunjia contributed 4 million yuan in cash, accounting for 20% of the registered capital. The company's registered address is in Jinxi Development Zone, Jinhua City. It will rent the existing factory building of Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory for renovation, and strive to absorb their respective expertise and adopt appropriate advanced technology and scientific management methods. A modern pharmaceutical enterprise focusing on the research and development, production and sales of pharmaceutical preparations for infants and children. In this cooperation, the corresponding products of "diazepam suppository" and "acetaminophen suppository", which Ge Fu pharmaceutical has invested in with proprietary technology evaluation, have been listed in Germany, among which diazepam suppository is a therapeutic drug for anti-anxiety, sleep disorder and muscle tension increase; acetaminophen is used for fever caused by cold or cold, and also for relieving mild to moderate pain. After the establishment of the joint venture company, it will be based on these two know-how.
2020
07-31
Jinhua City People's Congress Leaders Peak Survey
On July 26, Cai Jian, deputy director of the Jinhua Municipal People's Congress, Chen Zhishi, secretary general of the Standing Committee of the National People's Congress, and a group of four people visited Jianfeng to conduct research on the introduction of talents and technological innovation, and to communicate with Jiang Xiaomeng, Yu Jianhong, Huang Jinlong, Xiang Chongping, Lan Xiaolong and other group company leaders conducted in-depth exchanges. (this newspaper reporter)
2020
07-31