The resumption of the internationalization project of Jianfeng Pharmaceutical is progressing smoothly.
Release time:
2020-07-15
Since February 15, since the resumption of work was allowed, the peak pharmaceutical international project department seriously do a good job in the prevention and control of the new crown epidemic, project construction and other work have been carried out, the current project construction gradually resumed.
In order to resume construction as soon as possible, the International Project Department has organized and formulated the epidemic prevention and control work plan and emergency plan in strict accordance with the requirements of the group company and the pharmaceutical company, combined with the relevant documents of the Jinhua municipal government and the development zone. At the same time, in order to effectively prevent and control the epidemic, the project construction team, in strict accordance with the requirements of Jinhua Economic and Technological Development Zone, set up a grid team to earnestly implement the information investigation of rework personnel, carry out green health code inspection on all rework personnel, register the "Project Department Staff Health Registration Form" and sign the "Epidemic Prevention and Control Commitment". After the resumption of work, the project department will call the original Hubei construction personnel one by one and ask them to postpone their return. Effective isolation shall be carried out for rework personnel outside the province in accordance with the requirements of the development zone documents to ensure the supply of materials during the isolation period; Necessary epidemic prevention safeguard measures shall be provided for rework personnel who meet the standard of exemption from isolation. The construction unit equipped each rework personnel with protective masks, hand sanitizer and other protective equipment, measured their body temperature twice a day, reported their health status, disinfected and killed offices, canteens, dormitories, toilets and other areas every day, and cut off the source of infection. The implementation of these measures has safely and effectively ensured the orderly recovery of project construction.
At the beginning of the resumption of work, there were only a few dozen construction workers on the site, and with the phased results of epidemic prevention and control, the speed of construction workers returning to work gradually accelerated, and the project construction work began to get on the right track. As of March 19, the office building, quality inspection building, preparation workshop, power workshop and warehouse of Jianfeng Pharmaceutical International Project have all resumed normal operation according to the construction plan. The total number of reworking personnel in the project construction unit is 198, and the physical condition is normal. The civil construction of the peak pharmaceutical internationalization project basically returned to normal level. (Zhou Hengbin/Wen Zhang Genlong/Photograph)
More information
In the eastern corner of the production area of Jianfeng Health Technology Company, there is a very inconspicuous building. From below, only a few pipes of uneven thickness can be seen on the top and the slogan "Focus on Environmental Protection and Promote Sustainable Development" with red letters on the yellow background on the stainless steel guardrail. Walking up, you can only see several closed pools and a small room with stacks of documents, test tubes, glass bottles and other testing tools on the table. This is the peak and healthy sewage treatment station. The production sewage of the whole factory area is concentrated here. After adjustment (PH adjustment), pre-acidification, anaerobic, anoxic, aerobic (aeration), precipitation and other links, it is discharged into the pipe network after reaching the special discharge standard. Yin Zhiwu, executive deputy general manager of Jianfeng Health, said that because the sewage treatment station in Wucheng District has not yet been built, Jianfeng Health has not yet been able to achieve pipe discharge, and the relevant national laws have strict requirements on the discharge of water pollutants from the extraction pharmaceutical industry. Sewage discharge must reach a special discharge limit, that is, chemical oxygen demand (COD) must be less than 50 mg/L. Enterprise development and environmental protection are both the concept of peak health since its establishment. In March this year, on the basis of the original environmental protection facilities, Jianfeng Health carried out technical renovation of waste gas collection and treatment facilities, and at the same time installed a sealing cover on the sewage treatment station to realize the closed collection of waste gas. Since the trial operation of this facility in mid-May, the overall effect has been obvious. The original treatment tank would emit an unpleasant smell during work, but now the smell has been significantly reduced. Compared with the young enterprise of peak health, the relatively "older" peak pharmaceutical has more experience in sewage treatment and environmental protection. Akihama
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-30
Jianfeng Pharmaceutical Won Advanced Collective of Municipal Red Cross Humanitarian Promotion Award
On April 24, the Red Cross Society of Jinhua issued a circular commending the advanced units and individuals of the 2016 Red Cross Humanitarian Promotion Award. Peak Pharmaceutical Company won the Red Cross Humanitarian Promotion Award for Advanced Collective. The Red Cross is a social relief organization engaged in humanitarian work, with the purpose of carrying forward the spirit of humanity, fraternity and dedication, protecting human life and health, and promoting the cause of peace and progress of mankind. As a socially responsible enterprise, Jianfeng Pharmaceutical has always attached importance to public welfare and charity work, vigorously promoted the spirit of the Red Cross, and vigorously supported the work of the Red Cross with practical actions. In September 2016, at the theme publicity activity of "World First Aid Day" and the opening ceremony of the municipal Red Cross emergency rescue station (point), Huang Jinlong, deputy general manager of the group company and general manager of the pharmaceutical company, donated 6 AEDs known as "life-saving artifact" to the Red Cross on behalf of Jianfeng Pharmaceutical, it is equipped with six Red Cross emergency rescue service stations (points), namely, Jinhua high-speed railway station, sports center, cultural center, Shuanglong scenic spot, Siping village scenic spot and Suoyuan village scenic spot. The configuration of AED equipment has played a very good role in improving the emergency rescue capacity of Jinhua's key locations, and has been affirmed by the Red Cross and related units. (Spike Pharmaceuticals)
2020
07-31
Jingmai Airport Test Flight Successfully Runway Cement Spike Manufacturing
On April 7, a Boeing 737-700 aircraft of China Eastern Airlines Yunnan took off from Kunming. After completing two flight test subjects, it landed safely at Lancang Jingmai Airport. This not only marked the basic completion of the airport flight area, The official start of the test flight also marked that the "Peak" brand airport runway cement passed the first "final exam". Lancang Jingmai Airport is a major project with milestone significance in the history of Pu'er transportation construction. Since then, an air corridor connecting southwest Yunnan and Southeast Asia has been added between Kunming and Pu'er, which will greatly promote the development and utilization of tourism resources in Lancang, Menglian and Ximeng "Pu'er Green Triangle" area, and promote the sustainable development of local economy and society; it is of great significance to strengthen the city's national defense construction, maintain border stability, promote national unity, improve emergency rescue capabilities, and promote Pu'er's integration into the country's "Belt and Road" construction. Since the start of the construction of the airport, Yunnan Jianfeng has been paying close attention to it, organizing technical research and repeated tests, and finally produced high-quality airport runway special cement, and with excellent product quality, superior product performance and high-quality service, it has become a runway for Lancang Airport. Cement manufacturer. This not only fills the gap of "peak" airport special cement, but also is of great significance to promote the "peak" brand and improve the market influence of enterprises. It is understood that Jingmai Airport is initially confirmed to be officially opened to traffic at the end of May. (Li Liangping)
2020
07-31