Peak Flemish New Crown Prevention and Control Notes
Release time:
2020-07-15
The Chinese New Year holiday in 2020 was put at risk by the new coronavirus pneumonia. Before, although I heard that someone in Wuhan had pneumonia, I always felt that there was no need to worry about it thousands of miles away. On January 20, the "human-to-human" broke out, and on the morning of January 23, the news of Wuhan's city closure came. It was really a surprise.
It should be said that the group leaders are quite keen on epidemic prevention and control. On January 21, the group company issued two consecutive notices to remind employees not to go to Wuhan without special circumstances and to wear masks to prevent infection. Reduce visits to relatives and friends and avoid going to crowded places. Employees who have recently been to Wuhan and surrounding areas should avoid going out within 14 days after returning home. If they have symptoms of cold and fever, they should go to the hospital for examination in time and take the initiative to explain the situation... and so on. These tips have clear guiding significance for us who are ignorant. At that time, we, who had made various plans for the New Year, canceled the party one after another and hurried to buy masks and disinfectant to take personal protection.
Even so, the severity of the epidemic prevention and control situation is unimaginable-from 0:00 on January 24, Tianjin launched a first-level response to a major public health emergency. The last time was SARS in 2003. That's when we really realized the seriousness of the new coronavirus. At a loss, the group company issued the "Notice on Preventing New Coronavirus Pneumonia (No. 2)" on January 27, which made detailed and comprehensive arrangements for the organization of epidemic prevention and control, preparation of epidemic prevention supplies, daily epidemic prevention measures and implementation. This undoubtedly points out the focus and direction of the epidemic prevention and control work for us.
After receiving the notice, our Flemish company immediately set up an epidemic prevention leading group headed by General Manager Wang Wei, with a detailed division of labor and clear responsibilities. According to the division of labor, I am mainly responsible for the procurement of epidemic prevention supplies. After confirming the number of alcohol and masks available in the company with my colleagues, I called the supplier on the third day of the new year and asked him to leave us all the alcohol and masks on hand, and continue to add orders with the upstream to ensure our long-term epidemic prevention and resumption of production. Because the mercury thermometer is not convenient to use in the unit, I placed an appointment order for a thermometer in Alibaba for the first time. I was afraid of not being insured. I ran three pharmacies in a row, and finally found a thermometer. The price was ridiculously expensive. At the same time, Mr. Wang also contacted friends in the medical field to buy masks and other epidemic prevention materials. I heard that he could buy a thermometer gun, so I safely withdrew the online order. In order to facilitate the spraying of disinfectant in the office area, I went to the supermarket and bought two large watering cans. I have finished everything I can think of, and my nervous and anxious mood has finally settled down a little.
received the notice of the group to extend the holiday. on the one hand, Mr. Wang asked all employees to minimize going out and do a good job in home protection. on the other hand, he arranged me to set up a file from now on to record the temperature of each employee and co-residents, as well as the time and place of return of employees from other places, and to record the detailed travel situation of each employee in the past 14 days from January 31, actively prepare for the prevention and control of the epidemic and the safe resumption of work.
With the passage of time, the development of the epidemic is becoming more and more thrilling. Looking at the rising numbers every day, everyone's heart is full of panic. More and more people in the WeChat working group of the development zone are eagerly asking where to buy masks and where to find disinfectant. Through communication with the supplier, I learned that their additional 2 tons of alcohol had arrived and 20000 medical masks had been delivered, but they could not be received in time due to traffic barriers. I reported this situation to Mr. Wang again. Mr. Wang said that he had found 1000 masks over there, so that there would be enough time to wait for the masks behind the supplier. After straightening out the protective materials, I couldn't help but break out in a cold sweat. If it weren't for the foresight of the group leaders and the advance notice, they immediately put forward specific requirements for us to prepare epidemic prevention materials. I'm afraid I'm like other people. Like ants on a hot pot, I 've hit a wall everywhere without getting anything.
In order to facilitate the communication of epidemic prevention and control information, the Group and pharmaceutical companies have set up epidemic prevention and control groups, on the one hand, to pay attention to and guide the company's epidemic prevention and control work, requiring enterprises and each employee to sign a commitment to epidemic prevention and control, and effectively put epidemic prevention work in place. On the one hand, all employees of the group are required to learn the "Operation Manual for Resuming Trainees", so that every employee is aware of the various work requirements of returning to work and is prepared to fight. While stepping up efforts to educate employees, the Group and pharmaceutical companies have also introduced new coronary pneumonia emergency plans to guide companies around the world to prepare for the resumption of work. At present, the Group has a number of companies have been approved to resume work, we Flanders has also asked employees to learn and master the requirements of the resumption of work, and developed an epidemic prevention and control plan, to the Binhai New Area Development Zone submitted an application for resumption of work. "There are thousands of sails on the side of the sunken boat, and thousands of trees in front of the sick tree." I hope that our application for resumption of work can be approved as soon as possible, and that the Qingfei Liyan products developed in cooperation with medical institutions can be delivered to the hands of doctors and patients as soon as possible, so as to make our contribution to the prevention and control of the epidemic to the maximum extent. (Liu Hairong)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30