The company held the first half of the board of directors, the board of supervisors
Release time:
2020-07-22
company held the first half of the board of directors and the board of supervisors
semi-annual performance reached a record high
news 8# November 29 , the group company held the 10th board of directors 11 meeting by means of communication, deliberated and passed the "Jianfeng Group 2019 Semi-Annual Report", "On the company's internal control system amendment" and other proposals.
In the first half of the year, the company focused on the general work policy of "innovation and reform, integration and improvement, scientific layout, and steady development " , and focused on the optimization of economic structure and industrial upgrading. Opportunities, continuous internal resource integration, improvement of internal management system, and improvement of enterprise operation efficiency. In the first half of 2019 , the company realized total operating income of 16.86 .9 billion yuan, up 12.17% year-on-year, net profit attributable to owners of the parent company 4.76 .3 billion yuan, up 57.55% year-on-year, and the semi-annual operating performance reached a record high. As of the end of 2019 6 , the company's total assets were 53.83 .1 billion yuan, up 9.82 from the beginning of the year ; Net assets were 38.17 .5 billion yuan, up 10.64 from the beginning of the year .
In the first half of the year, the company made a new breakthrough in the expansion of cement business. The group company completed the acquisition of 100% equity of Guizhou huangpinggu longmingchuan cement co., ltd. and continued to invest in the construction of its new dry cement production line with a daily production of 4500 tons of cement clinker (with waste heat power generation); Yunnan Jianfeng invested ,500 yuan to participate in the establishment of Yunnan Jianfeng Da Zhan Cement Co., Ltd, the company plans to build a cement clinker production line in Mengla County, Xishuangbanna Dai Autonomous Prefecture in accordance with relevant national policies. The company's cement subsidiaries continue to carry out in-depth "three down three improve " activities, steadily implement standardized management, while strictly controlling production costs, and continuously improve labor productivity. Daye Peak, in accordance with the spirit of the Group's standardization year, has implemented standardization of production site management and has achieved good results. Comprehensive treatment of cement packaging dust, hydraulic system of limestone stacker, cement cooling commissioning and other technical renovation projects have been carried out in an orderly manner, all of which have reached good expectations. Yunnan Jianfeng timely grasps the price changes of related products of upstream suppliers through various channels, and strictly controls the procurement cost of raw materials. Concentrate on the development of market share in the core region as a key work, constantly explore and formulate sales strategies suitable for the regional market, effectively improve the market popularity and share of Jianfeng Cement, and achieve the best business performance since it was put into production.
Jianfeng Pharmaceutical continued to increase investment in drug research and development and obtained the Drug Registration Approval for Olopatadine Hydrochloride Eye Drops. In the face of changes in the pharmaceutical sales environment, Spike Pharmaceuticals has integrated its pharmaceutical business and pharmaceutical retail, and strived to extend and expand its third-end market share. Accelerate the consistency evaluation of related drugs, and lay a good foundation for the next step to participate in the centralized procurement of drugs. Jianfeng Pharmaceutical and its subsidiaries continue to increase investment in safety and environmental protection, improve and upgrade various safeguards, and improve the level of automatic control of equipment and facilities; adhere to prevention, improve safety management and three waste treatment capabilities, and effectively reduce environmental protection and safety Production risk. In the first half of the year, Jianfeng Pharmaceutical and its subsidiaries made new progress in a number of technological innovations and engineering constructions. Jianfeng Pharmaceutical's international project of annual production of 20 .7 billion solid preparations has obtained EIA approval and completed civil engineering and bidding for some equipment. Shanghai Beika Drug Approval R & D Laboratory Renovation Project has entered the stage of equipment installation and commissioning. A number of technological transformation projects in Anhui Beika have been carried out in an orderly manner, environmental protection transformation projects such as waste gas (RTO ) and sewage treatment have been put into operation, and the annual output of 1500 tons of acetamiprid powder in pesticide preparation workshop has entered the trial production stage. The laboratory renovation of GMP of Anhui Zhongwang Small Molecule Targeted Drug Research Institute has been basically completed, and the second phase technical renovation project of GMP workshop, including common drugs and small molecule targeted antitumor drugs, has obtained government approval.
The production and operation activities of other business segments of the company are carried out in a standardized and orderly manner.
On the same day, the company also held the rd meeting of the 9th Board of Supervisors and reviewed and approved the relevant report. (Yu fruit)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30