Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project Completion Environmental Protection Acceptance Publicity
Release time:
2020-07-31
Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project
Completion Environmental Protection Acceptance Publicity
According to the requirements of Interim Measures for Environmental Protection Acceptance of Construction Project Completion (National Environmental Planning and Environmental Assessment [2017] No. 4 ) of the Ministry of Environmental Protection,
The environmental protection acceptance information of "Kiln End Flue Gas Desulfurization Project" of daye Jianfeng Cement Co., Ltd. is now publicized. Basic Information of
1. Project
Project Name: Kiln End Flue Gas Desulfurization Project
Project Construction Unit: Daye Jianfeng Cement Co., Ltd.
Project Construction Location: Yongguang Village, Baoan Town, daye city, nature of
Project in the existing factory area of daye Jianfeng Cement Co., Ltd: the construction content of the technical renovation
project is as follows:
This technical renovation project is mainly to build a wet desulfurization system for the kiln tail flue gas of the company's existing daily production 4000t cement clinker production line, adopting limestone - gypsum wet flue gas desulfurization process. The project covers a total area of 500m 2 , with a new construction area of about 450 m 2 . It mainly builds desulfurization complex building, flue gas system, SO 2 absorption system, limestone powder conveying and limestone slurry preparation system, process water system, gypsum dehydration system and supporting pipelines, etc. Power supply, water supply, compressed air and other public works rely on the existing plant.
Project Total Investment and Environmental Protection Investment: The total investment of the project is 1037 Yuan , all of which are environmental protection investment. The
project was commissioned by Huangshi Changjiang Environmental Engineering Design Institute to conduct an environmental impact assessment on 2017 9 . On 2017 11 16 , daye city Environmental Protection Bureau approved the document No.78 [2017]354 .
Implementation of 2. Environmental Protection Measures
The scope of this acceptance is Kiln End Flue Gas Desulfurization System and Supporting Facilities .
(1) Exhaust Gas Pollution Prevention Measures
Project Organized Exhaust Gas Emission Main Pollutants are SO 2 ; The main pollutant of unorganized exhaust gas emission is dust. In the
slurry preparation system, the processes of transportation, feeding, ash separation and silo are fully enclosed, and the pulping process is equipped with ash and dehumidification devices. The SO 2 in the waste gas of the rotary kiln is treated by limestone - gypsum method and discharged from the 110m high chimney at high altitude; the emission concentration of SO 2 and unorganized dust can meet the emission limit requirements of (GB4915-2013 ) "Comprehensive Emission Standard for Air Pollutants in Cement Industry.
(2) Water Environment Pollution Prevention and Control Measures
Project Drainage is divided into rain and sewage, and rainwater ditches (cement hardening) are set up. Rainwater at the project site enters the existing rainwater system in the plant area. Drainage ditches and water collecting tanks are built, equipped with cyclone machines and filtrate collection tanks. The wastewater is collected by the water collecting tanks and recycled for production without external discharge; A 570m 3 accident slurry tank has been built. The slurry discharged from the absorption tower during the accident will be collected in the accident slurry tank and recycled to the absorption tower without being discharged outside, thus having little impact on the outside world.
(3) noise prevention measures
project noise mainly comes from production equipment such as fans and water pumps, equipment is low noise equipment; The fans and pumps are all placed in closed compartments, and measures such as vibration reduction, noise elimination and distance attenuation are taken.
(4) Solid Waste Pollution Prevention Measures
The solid wastes discharged during the operation period of the project are mainly domestic garbage and desulfurization gypsum. A standardized temporary storage room for solid waste is built on the first floor of the desulfurization station. The dehydrated gypsum is collected by the temporary storage room and regularly transported to the gypsum storage yard in the plant area. As raw material, it enters the cement mill and is not discharged. Domestic waste is uniformly removed and transported by the local environmental protection department for centralized treatment.
3. Acceptance Survey Results
(I) Construction Period
During the construction period, various environmental protection measures were implemented with little impact on the surrounding environment.
(II) operation period
1 , acceptance monitoring condition
acceptance monitoring period (2019 3 July 21-22 ; 2019 172 5 March 27-28 ), the project is operating normally, design and production of cement 4000t/d ; The actual 3 September 21-22 day, 5 March 27-28 day production load all reached above 82% of , the completion acceptance monitoring condition was greater than 75% of , and the monitoring data were valid.
and Waste Gas
3 monitoring points were set up at the factory boundary to monitor the unorganized particulate matter emitted by the project for two days. The maximum concentration of unorganized particulate matter emitted from the factory boundary is lower than 0.5 mg/m 3 , does not exceed the unorganized emission limit of in table of "cement industry comprehensive emission standard for air pollutants " (GB 4915-2013 ).
During this acceptance monitoring period, SO 219 in the inlet and outlet exhaust gas of the desulfurization tower at the end of the rotary kiln was monitored. The monitoring results show that the average desulfurization efficiency of the desulfurization tower at the end of the rotary kiln reaches above 91% in the desulfurization 223. in the exhaust gas at the outlet of the exhaust pipe
More information
2020
11-03
Jinhua Municipal Party Committee Secretary Chen Long: I wish your enterprise better and better
On the morning of October 16, Chen long, secretary of the Jinhua Municipal CPC Committee, and his entourage came to the construction site of Jianfeng Pharmaceutical's internationalization project to investigate and affirmed the good development status and clear future development ideas of Jianfeng Pharmaceutical. At the construction site, Jiang Xiaomeng, chairman of the group company and chairman of the pharmaceutical company, introduced the overall situation of the investment scale, factory layout, and production direction of the Jianfeng Pharmaceutical internationalization project to Chen Long and his entourage. Huang Jinlong, general manager of the pharmaceutical company, accompanied Chen Long and his entourage to visit the preparation workshop under construction. The construction site is neat, tidy and orderly, and the facilities and equipment are perfect and advanced, all have been unanimously affirmed by the leaders who came to investigate. When learning that the peak internationalization project has introduced international advanced equipment, built in accordance with European and American standards, and its products are oriented to the international market, Chen long said happily: "your goals are very clear and your thinking is very clear. I wish your enterprise better and better!" (this newspaper reporter)
2020
10-23
Liu Haiping, vice mayor of Pu'er City, said during the survey: "Peak is an enterprise with feelings"
On September 30, Liu Haiping, member of the standing Committee of the Pu'er Municipal CPC Committee and vice mayor of Pu'er City, Yunnan Province, and relevant responsible persons of Pu'er City and Simao District, visited the company for investigation and research, and communicated with the leaders of the group company on topics such as further strengthening cooperation between the two sides. "Yunnan Jianfeng has not only developed well in Pu'er these years, achieved good benefits and contributed considerable tax revenue, but also made great contributions to promoting the economic development of Pu'er and the stability of the southwest border region. It is our 'star enterprise' and 'baby enterprise '." Liu Haiping said so in the exchange. He said that Pu'er is an important window for the implementation of the "Belt and Road" concept. It has good conditions in natural resources, transportation, electricity, etc., and the peak is a "sentimental enterprise" and has a good foundation in the local area. Strengthen cooperation; various government departments will also earnestly "stand on the platform" and "do a good job as a shopkeeper" to serve enterprises. Chairman Jiang Xiaomeng and General Manager Yu Jianhong exchanged views with Liu Haiping and his party on the layout of peak industry and strengthening cooperation with Pu 'er. After that, accompanied by General Manager Yu Jianhong and Deputy General Manager Huang Jinlong, Liu Haiping and his party visited the Jinxi Factory of Jianfeng Pharmaceutical Factory. (this newspaper reporter)
2020
10-09
The first batch of Jianfeng Pharmaceuticals to enter Jinhua (Shanghai) Science and Technology Center
News from our newspaper On September 16, at the unveiling ceremony of the Yangtze River Delta G60 Jinhua (Shanghai) Science and Technology Innovation Center and Jinhua (Shanghai) Talent Building, Jiang Xiaomeng, chairman of the group company and chairman of the pharmaceutical company, took over from Chen Long, secretary of the Jinhua Municipal Party Committee. The golden key with big red flowers. Spike Pharmaceuticals became one of the first seven companies to enter the center. The Yangtze River Delta G60 Jinhua (Shanghai) Science and Technology Center and Jinhua (Shanghai) Talent Building are the first "Science and Technology and Talent Enclave" in Shanghai in the nine cities of the Yangtze River Delta G60 Science and Technology Corridor, and the first cross-regional industrial collaborative innovation center in the Science and Technology Corridor. The center is located in Shanghai Lingang Songjiang Science and Technology City, with a total area of nearly 10,000 square meters. It includes two parts: science and technology innovation and talent service. There are five major centers, including talent service center, science and technology innovation exhibition center, business incubation center, enterprise research and development center, and talent project roadshow center. It is a science and technology innovation platform that integrates the functions of project incubation, recruitment of institutions, and talent recruitment. Chen Long, secretary of the Jinhua Municipal Party Committee, said in his speech at the unveiling ceremony that in the future, all scientific and technological enterprises stationed in Jinhua (Shanghai) Science and Technology Center and Talent Building can equally enjoy Jinhua's local science and technology and talent policies, so as to further break the space limitation, enable talents from the two places to share the most favorable treatment and convenient services, help enterprises to develop in Shanghai and achieve industrialization in Jinhua. At the ceremony, leaders such as Chen Long, secretary of the Jinhua Municipal Party Committee, and Cheng Xiangmin, secretary of the Shanghai Songjiang District Party Committee, awarded seven companies, including Jianfeng Pharmaceutical, the golden key to symbolize their entry. At the Yangtze River Delta Integrated Talent Cooperation Project Symposium held after the ceremony, Jiang Xiaomeng spoke as a representative of Jinhua entrepreneurs. He believed that Shanghai, as an international metropolis, has an agglomeration effect on high-end intellectual resources and grasps the first-class element resources of scientific and technological innovation in China and even the world. The establishment of G60 Jinhua (Shanghai) science and technology innovation center and talent building in the Yangtze River Delta helps Jinhua enterprises to take off in scientific and technological innovation and information exchange, which will provide strong and continuous scientific and technological support and intellectual support for the long-term development of enterprises in the future, and attract more excellent domestic and foreign talents to serve Jinhua enterprises, It plays a key role in further improving scientific research ability, innovation ability and personnel training. During the event, Jiang Xiaomeng successively accepted on-site interviews with "People's Daily", "Liberation Daily", "Zhejiang Daily" and other media. He said that the establishment of science and technology innovation and talent bases in Shanghai has greatly enhanced Jinhua's attractiveness to enterprises. "With this base, we don't need to introduce talents to Jinhua, but directly recruit talents in Shanghai, and at the same time enjoy Jinhua's various talent recruitment policies, and change Shanghai talents to Jinhua's use. This is a kind of bold. The innovation has greatly solved the dilemma of attracting talents for enterprises." As a settled enterprise, it will also make full use of its own advantages to continuously inject resource vitality into the science and technology innovation center, and continue to contribute to the long-term development of Jinhua's economy. (this newspaper reporter)
2020
09-22
Spike Pharmaceutical Added New Products
On September 3, Spike Pharmaceutical Company received the approval of the State Drug Administration for the registration of esomeprazole sodium for injection (approval number: 2020S00572). Esomeprazole sodium for injection is mainly used to treat low-risk patients with gastroesophageal reflux disease and acute gastric or duodenal ulcer bleeding when oral therapy is not applicable. It has been listed in the National Basic Medical Insurance, Work Injury Insurance and Maternity Insurance Drug List (2017 Edition) ", classified as Class B. According to industry statistics, 30 companies including Zhengda Tianqing and Qilu Pharmaceutical have been approved for listing in China. In 2019, domestic sales (including urban and county-level public hospitals, community and township health centers) were about 3.317 billion yuan. Jianfeng Pharmaceutical submitted an application for registration of esomeprazole sodium for injection to the State Food and Drug Administration in November 2013 and was accepted. Up to now, Jianfeng Pharmaceutical has invested nearly 15 million yuan in research and development for the project and has a corresponding production line. This time to obtain the injection of esomeprazole sodium drug registration approval, marking the peak pharmaceutical has the drug production, sales qualification, will further enrich the peak pharmaceutical product line, help to enhance the competitiveness of the peak pharmaceutical business. (Lu Yating, Liu Yang)
2020
09-11