Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project Completion Environmental Protection Acceptance Publicity
Release time:
2020-07-31
Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project
Completion Environmental Protection Acceptance Publicity
According to the requirements of Interim Measures for Environmental Protection Acceptance of Construction Project Completion (National Environmental Planning and Environmental Assessment [2017] No. 4 ) of the Ministry of Environmental Protection,
The environmental protection acceptance information of "Kiln End Flue Gas Desulfurization Project" of daye Jianfeng Cement Co., Ltd. is now publicized. Basic Information of
1. Project
Project Name: Kiln End Flue Gas Desulfurization Project
Project Construction Unit: Daye Jianfeng Cement Co., Ltd.
Project Construction Location: Yongguang Village, Baoan Town, daye city, nature of
Project in the existing factory area of daye Jianfeng Cement Co., Ltd: the construction content of the technical renovation
project is as follows:
This technical renovation project is mainly to build a wet desulfurization system for the kiln tail flue gas of the company's existing daily production 4000t cement clinker production line, adopting limestone - gypsum wet flue gas desulfurization process. The project covers a total area of 500m 2 , with a new construction area of about 450 m 2 . It mainly builds desulfurization complex building, flue gas system, SO 2 absorption system, limestone powder conveying and limestone slurry preparation system, process water system, gypsum dehydration system and supporting pipelines, etc. Power supply, water supply, compressed air and other public works rely on the existing plant.
Project Total Investment and Environmental Protection Investment: The total investment of the project is 1037 Yuan , all of which are environmental protection investment. The
project was commissioned by Huangshi Changjiang Environmental Engineering Design Institute to conduct an environmental impact assessment on 2017 9 . On 2017 11 16 , daye city Environmental Protection Bureau approved the document No.78 [2017]354 .
Implementation of 2. Environmental Protection Measures
The scope of this acceptance is Kiln End Flue Gas Desulfurization System and Supporting Facilities .
(1) Exhaust Gas Pollution Prevention Measures
Project Organized Exhaust Gas Emission Main Pollutants are SO 2 ; The main pollutant of unorganized exhaust gas emission is dust. In the
slurry preparation system, the processes of transportation, feeding, ash separation and silo are fully enclosed, and the pulping process is equipped with ash and dehumidification devices. The SO 2 in the waste gas of the rotary kiln is treated by limestone - gypsum method and discharged from the 110m high chimney at high altitude; the emission concentration of SO 2 and unorganized dust can meet the emission limit requirements of (GB4915-2013 ) "Comprehensive Emission Standard for Air Pollutants in Cement Industry.
(2) Water Environment Pollution Prevention and Control Measures
Project Drainage is divided into rain and sewage, and rainwater ditches (cement hardening) are set up. Rainwater at the project site enters the existing rainwater system in the plant area. Drainage ditches and water collecting tanks are built, equipped with cyclone machines and filtrate collection tanks. The wastewater is collected by the water collecting tanks and recycled for production without external discharge; A 570m 3 accident slurry tank has been built. The slurry discharged from the absorption tower during the accident will be collected in the accident slurry tank and recycled to the absorption tower without being discharged outside, thus having little impact on the outside world.
(3) noise prevention measures
project noise mainly comes from production equipment such as fans and water pumps, equipment is low noise equipment; The fans and pumps are all placed in closed compartments, and measures such as vibration reduction, noise elimination and distance attenuation are taken.
(4) Solid Waste Pollution Prevention Measures
The solid wastes discharged during the operation period of the project are mainly domestic garbage and desulfurization gypsum. A standardized temporary storage room for solid waste is built on the first floor of the desulfurization station. The dehydrated gypsum is collected by the temporary storage room and regularly transported to the gypsum storage yard in the plant area. As raw material, it enters the cement mill and is not discharged. Domestic waste is uniformly removed and transported by the local environmental protection department for centralized treatment.
3. Acceptance Survey Results
(I) Construction Period
During the construction period, various environmental protection measures were implemented with little impact on the surrounding environment.
(II) operation period
1 , acceptance monitoring condition
acceptance monitoring period (2019 3 July 21-22 ; 2019 172 5 March 27-28 ), the project is operating normally, design and production of cement 4000t/d ; The actual 3 September 21-22 day, 5 March 27-28 day production load all reached above 82% of , the completion acceptance monitoring condition was greater than 75% of , and the monitoring data were valid.
and Waste Gas
3 monitoring points were set up at the factory boundary to monitor the unorganized particulate matter emitted by the project for two days. The maximum concentration of unorganized particulate matter emitted from the factory boundary is lower than 0.5 mg/m 3 , does not exceed the unorganized emission limit of in table of "cement industry comprehensive emission standard for air pollutants " (GB 4915-2013 ).
During this acceptance monitoring period, SO 219 in the inlet and outlet exhaust gas of the desulfurization tower at the end of the rotary kiln was monitored. The monitoring results show that the average desulfurization efficiency of the desulfurization tower at the end of the rotary kiln reaches above 91% in the desulfurization 223. in the exhaust gas at the outlet of the exhaust pipe
More information
Peak health marketing and a new "play"
Building a New System, Flattening Management, Spike Health Marketing, New "Way to Work" On February 17, Spike Health Technology Company held a sales meeting to integrate and adjust the construction of a new marketing system and deploy and implement the 2017 sales work. Chen Daiyou, general manager of Health Technology Company, carefully explained and answered the marketing system construction and sales management assessment methods at the meeting, and reached a consensus on unifying thinking. The sales business of Health Technology Company involves three categories: health care products, plant extracts and Chinese herbal pieces. The product attributes and categories are different, and the product sales channels are diversified. In order to facilitate market expansion and adapt to the rapid response to market changes, the Company focuses on key products, key channels and key markets, adjusts the original business model, unifies all sales businesses of the Company, establishes a marketing center, and centralizes and unifies flat management. At the meeting, the Health Technology Company issued the "2017 Sales Management Assessment Measures", which takes sales performance as the leading factor, defines the sales staff's business expenses and market expansion support policies, implements quarterly and annual assessment of sales targets, and directly links the assessment of the progress of sales staff's target tasks with monthly income. After two-way selection, adjustment and implementation of sales positions and target tasks, all sales staff of Health Technology Company have signed a sales economic responsibility system. Chen Daiyou hopes that marketers will build confidence to meet the challenges and grow and progress together with the enterprise. At the same time, he said that the health technology company will focus on strengthening the construction and cultivation of the sales team, and carry out training, learning and experience sharing in various ways, so as to improve the business ability and level of the sales team. (Spike Health)
2020
07-30
2020
07-30
2020
07-31
2020
07-31
On January 23, the group company held a special working meeting to summarize the safety and environmental protection work in 2016 and make arrangements for the work in the new year. General manager Yu Jianhong pointed out at the meeting that hidden dangers are accidents, accidents should be assessed, and safety and environmental protection work should continue to be carried out with a "zero tolerance" attitude. At the meeting, Chen Tianci, assistant to the general manager of the group company and manager of the audit performance management department, summarized the safety and environmental protection work in 2016 from the aspects of the completion of the safety and environmental protection responsibility system objectives, self-examination and self-correction of illegal operations, and the establishment of safety and environmental protection accident-free factories, analyzed the problems existing in the work, and put forward the safety and environmental protection work plan for 2017 in a targeted manner. Jiang Xiaomeng, chairman of the group company, stressed at the meeting that the work of safety and environmental protection is endless and must be carried out unremittingly. All enterprises should focus on safety and environmental protection management in a planned and focused manner according to the characteristics of their respective industries and industries, seasonal changes, and national policy adjustments. It is more important to establish awareness than inspection. It is necessary to strengthen safety and environmental protection education and improve the safety and environmental protection awareness and related work skills of all employees. Conduct in-depth pre-inspection and strict post-assessment to achieve full management and comprehensive prevention, and realize the overall improvement of enterprise safety and environmental protection. At the meeting, Jiang Xiaomeng, on behalf of the group company, signed the 2017 safety and environmental protection work responsibility letter with various professional companies and directly affiliated enterprises. In his concluding speech, Yu Jianhong, general manager of the group company, pointed out that safety runs through the development of the enterprise, and safety and environmental protection cannot be separated from production and operation. The two promote each other and complement each other, and managers at all levels must have a deep level of this.
2020
07-31
"Spike" Cement Becomes Yunnan Famous Brand Product
News from our newspaper At the beginning of the new year, good news came from Yunnan Jianfeng Cement Company. The "Jianfeng" brand cement successfully passed the examination and approval and won the title of "Yunnan Famous Brand Product. Since it was put into production in 2013, the "Jianfeng" brand cement produced by Yunnan Jianfeng has won good sales performance and reputation in the southwest Yunnan market, and its popularity and brand influence have been continuously improved. Therefore, Yunnan Jianfeng started to declare "famous brand products" in 2016. After preliminary data preparation, preliminary examination by Pu'er Municipal Bureau of Quality and Technical Supervision, expert review by Yunnan Provincial Bureau of Quality and Technical Supervision and on-site verification, Yunnan Provincial Bureau of Quality and Technical Supervision finally passed the examination and approval of "Yunnan Famous Brand Products" organized by Yunnan Provincial Strategic Leading Group for Implementing Brand and Strong Quality Province in 2017. The acquisition of this honorary title will further enhance the market competitiveness of Jianfeng Cement in southwestern Yunnan, and also increase the popularity of Yunnan Jianfeng, laying a more solid foundation for further market development in the future. (Li Chun)
2020
07-31