Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project Completion Environmental Protection Acceptance Publicity
Release time:
2020-07-31
Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project
Completion Environmental Protection Acceptance Publicity
According to the requirements of Interim Measures for Environmental Protection Acceptance of Construction Project Completion (National Environmental Planning and Environmental Assessment [2017] No. 4 ) of the Ministry of Environmental Protection,
The environmental protection acceptance information of "Kiln End Flue Gas Desulfurization Project" of daye Jianfeng Cement Co., Ltd. is now publicized. Basic Information of
1. Project
Project Name: Kiln End Flue Gas Desulfurization Project
Project Construction Unit: Daye Jianfeng Cement Co., Ltd.
Project Construction Location: Yongguang Village, Baoan Town, daye city, nature of
Project in the existing factory area of daye Jianfeng Cement Co., Ltd: the construction content of the technical renovation
project is as follows:
This technical renovation project is mainly to build a wet desulfurization system for the kiln tail flue gas of the company's existing daily production 4000t cement clinker production line, adopting limestone - gypsum wet flue gas desulfurization process. The project covers a total area of 500m 2 , with a new construction area of about 450 m 2 . It mainly builds desulfurization complex building, flue gas system, SO 2 absorption system, limestone powder conveying and limestone slurry preparation system, process water system, gypsum dehydration system and supporting pipelines, etc. Power supply, water supply, compressed air and other public works rely on the existing plant.
Project Total Investment and Environmental Protection Investment: The total investment of the project is 1037 Yuan , all of which are environmental protection investment. The
project was commissioned by Huangshi Changjiang Environmental Engineering Design Institute to conduct an environmental impact assessment on 2017 9 . On 2017 11 16 , daye city Environmental Protection Bureau approved the document No.78 [2017]354 .
Implementation of 2. Environmental Protection Measures
The scope of this acceptance is Kiln End Flue Gas Desulfurization System and Supporting Facilities .
(1) Exhaust Gas Pollution Prevention Measures
Project Organized Exhaust Gas Emission Main Pollutants are SO 2 ; The main pollutant of unorganized exhaust gas emission is dust. In the
slurry preparation system, the processes of transportation, feeding, ash separation and silo are fully enclosed, and the pulping process is equipped with ash and dehumidification devices. The SO 2 in the waste gas of the rotary kiln is treated by limestone - gypsum method and discharged from the 110m high chimney at high altitude; the emission concentration of SO 2 and unorganized dust can meet the emission limit requirements of (GB4915-2013 ) "Comprehensive Emission Standard for Air Pollutants in Cement Industry.
(2) Water Environment Pollution Prevention and Control Measures
Project Drainage is divided into rain and sewage, and rainwater ditches (cement hardening) are set up. Rainwater at the project site enters the existing rainwater system in the plant area. Drainage ditches and water collecting tanks are built, equipped with cyclone machines and filtrate collection tanks. The wastewater is collected by the water collecting tanks and recycled for production without external discharge; A 570m 3 accident slurry tank has been built. The slurry discharged from the absorption tower during the accident will be collected in the accident slurry tank and recycled to the absorption tower without being discharged outside, thus having little impact on the outside world.
(3) noise prevention measures
project noise mainly comes from production equipment such as fans and water pumps, equipment is low noise equipment; The fans and pumps are all placed in closed compartments, and measures such as vibration reduction, noise elimination and distance attenuation are taken.
(4) Solid Waste Pollution Prevention Measures
The solid wastes discharged during the operation period of the project are mainly domestic garbage and desulfurization gypsum. A standardized temporary storage room for solid waste is built on the first floor of the desulfurization station. The dehydrated gypsum is collected by the temporary storage room and regularly transported to the gypsum storage yard in the plant area. As raw material, it enters the cement mill and is not discharged. Domestic waste is uniformly removed and transported by the local environmental protection department for centralized treatment.
3. Acceptance Survey Results
(I) Construction Period
During the construction period, various environmental protection measures were implemented with little impact on the surrounding environment.
(II) operation period
1 , acceptance monitoring condition
acceptance monitoring period (2019 3 July 21-22 ; 2019 172 5 March 27-28 ), the project is operating normally, design and production of cement 4000t/d ; The actual 3 September 21-22 day, 5 March 27-28 day production load all reached above 82% of , the completion acceptance monitoring condition was greater than 75% of , and the monitoring data were valid.
and Waste Gas
3 monitoring points were set up at the factory boundary to monitor the unorganized particulate matter emitted by the project for two days. The maximum concentration of unorganized particulate matter emitted from the factory boundary is lower than 0.5 mg/m 3 , does not exceed the unorganized emission limit of in table of "cement industry comprehensive emission standard for air pollutants " (GB 4915-2013 ).
During this acceptance monitoring period, SO 219 in the inlet and outlet exhaust gas of the desulfurization tower at the end of the rotary kiln was monitored. The monitoring results show that the average desulfurization efficiency of the desulfurization tower at the end of the rotary kiln reaches above 91% in the desulfurization 223. in the exhaust gas at the outlet of the exhaust pipe
More information
In March, the authoritative organization of the cement industry successively released two series of lists of China's top 500 building materials enterprises in 2022 and China's top 100 cement clinker production capacity in 2022. Jianfeng Group ranked among the "top 100" in the two lists ". The list of China's top 500 building materials enterprises was officially released in early March. This series of lists was selected by the China Building Materials Enterprise Management Association. Through more than 20 years of comprehensive data research on China's building materials industry, referring to international practices, the rankings are based on the company's annual operating income., Cement products, building ceramics, waterproof materials, aluminum-plastic profiles, coatings, glass, building materials equipment manufacturing and other sub-industries related to building materials. Jianfeng Group ranks 96th among the companies on the list and 27th among the cement manufacturers on the list. On March 16, the awarding ceremony of 2022 China's top 100 cement clinker production capacity list was held in Hangzhou. This series of lists is released by China Cement Network, an authoritative organization in China's cement industry. The ranking is based on the total production capacity (excluding the production capacity of other kiln types and grinding stations) of new dry clinker production lines completed and put into operation by Chinese cement enterprises in China as of December 31, 2022. The data statistics are calculated based on the design production capacity and 310 days of annual operation. Jianfeng Group ranked 53rd with an annual design capacity of 3.627 million tons. (this newspaper reporter)
2023
03-21
Company sends off retired employees
On the morning of February 22, the trade union of the group company held a simple and warm farewell party for retired employees in 2021-2022. More than 50 retired employees gathered together to discuss and exchange with Jiang Xiaomeng and other group leaders.
2023
03-04
On the first day of the new year, group leaders went to the grassroots level.
On January 29, the first day of work after the Spring Festival holiday, the leaders of the group company made a video connection to subordinate enterprises stationed abroad, and separately visited the gold enterprises to learn about the resumption of work and put forward requirements for the implementation of the work plan for the new year.
2023
02-17
Group Companies Commend 2022 Advanced
On the morning of January 18, the group company held the 2022 annual summary commendation meeting to review the work of the previous year, make arrangements for the work in 2023, sign the 2023 economic responsibility system with various professional companies and directly affiliated enterprises, and solemnly commend the 2022 advanced collectives and individuals.
2023
01-29
Jiang Xiaomeng re-elected chairman of the Municipal Federation of Industry and Commerce
On December 24, 2022, the Jinhua Federation of Industry and Commerce (General Chamber of Commerce) held the seventh member representative meeting. Jiang Xiaomeng, secretary of the party committee and chairman of the group company, was re-elected as the chairman of the Municipal Federation of Industry and Commerce at this meeting.
2023
01-12
Peak Pharmaceutical Donates Epidemic Prevention Materials
Since the optimization and adjustment of the new crown infection epidemic management policy, there has been an explosive growth of infected people in the country, and the pressure on the supply of related materials has increased sharply. Before and after New Year's Day, the company has twice organized epidemic prevention materials, through the Jinhua City Charity Federation, Jinhua City Economic and Technological Development Zone Charity Federation targeted donations, a total value of more than 200,000 yuan.
2023
01-12