Discussion on Safety Management Defects
Release time:
2020-07-22
Safety Management Defects Discussion
Accidents are caused by unsafe behaviors of people, unsafe conditions of things and management defects. Although the management defects in the three major factors are ranked at the end, in the long run, safety management has a decisive impact on the two major accident causes of unsafe behavior of people and unsafe state of things at the same time. Therefore, the inspection and evaluation of the safety management status is the focus of the company's safety supervision of various enterprises in the next stage. Summarizing the previous safety management situation, the management defects are more or less manifested in the following ten aspects:
1. Safety management organization defects. Mainly in the safety management organization, personnel composition does not adapt to the production system; not according to the requirements of the safety quality of the appropriate, sufficient management personnel, resulting in the safety management of the existence of improper convergence, management gaps, etc.; personnel cross authority, resulting in management confusion.
2. Safety rules and regulations are flawed. It is mainly manifested in the failure to formulate and improve the safety production responsibility system and safety production management system according to its own characteristics, resulting in no rules to follow in the work and chaotic production sequence; the safety production responsibility system is not implemented in every link, every post and every person, and their respective responsibilities are not clear; there is a lack of mutual cooperation and promotion mechanism between different safety rules and management systems; the safety rules and management system is mere formality, with imperfect and incomplete content; the requirements of safety rules and regulations are out of touch with the actual work, etc.
3. Insufficient safety quality of employees. Insufficient safety education and training for employees, safety management personnel and grassroots operators have not received training or insufficient training hours, and do not have the corresponding safety production knowledge and job ability; The quality of employees is low, the knowledge is outdated, and the concept is backward, resulting in poor safety awareness and a large number of unsafe behaviors; The safety education and training of foreign employees are ignored.
4. loose management of hazardous chemicals, hazardous processes and major hazard sources, inadequate monitoring measures, insufficient risk identification, unclear control methods, insufficient prevention and emergency treatment, and backward predictive management methods.
5. The supervision, inspection and assessment of management personnel are insufficient, there are prohibitions, orders, illegal behaviors, and special operation safety management is not in place.
6. Hidden dangers are not thoroughly investigated and control measures are not appropriate.
7. New construction, renovation projects or new equipment of enterprises fail to carry out "three simultaneous" safety facilities as required, resulting in congenital deficiency of safety production conditions.
8. Insufficient investment in safety funds, insufficient safety education and training, inadequate personal protection, insufficient safety facilities, and failure to provide funds for the investigation and management of hidden dangers of accidents have led to accidents.
9. Failure to establish safety production record files is not conducive to timely, comprehensive and systematic grasp of the safety production situation of enterprises and timely reflection of safety production trends; It is not conducive to analyzing the risk factors in safety production and making safety management decisions. The safety management system has not formed a virtuous circle mode of "PDCA .
10. Improper management of accidents (including attempts) has worsened the accidents, such as late reporting, omission, false reporting or concealment of the accidents, failure to find out the cause of the accidents, failure to educate the masses, etc., thus causing minor accidents (signs) to become major accidents. (Safety Management Office of CNPC)
More information
In the eastern corner of the production area of Jianfeng Health Technology Company, there is a very inconspicuous building. From below, only a few pipes of uneven thickness can be seen on the top and the slogan "Focus on Environmental Protection and Promote Sustainable Development" with red letters on the yellow background on the stainless steel guardrail. Walking up, you can only see several closed pools and a small room with stacks of documents, test tubes, glass bottles and other testing tools on the table. This is the peak and healthy sewage treatment station. The production sewage of the whole factory area is concentrated here. After adjustment (PH adjustment), pre-acidification, anaerobic, anoxic, aerobic (aeration), precipitation and other links, it is discharged into the pipe network after reaching the special discharge standard. Yin Zhiwu, executive deputy general manager of Jianfeng Health, said that because the sewage treatment station in Wucheng District has not yet been built, Jianfeng Health has not yet been able to achieve pipe discharge, and the relevant national laws have strict requirements on the discharge of water pollutants from the extraction pharmaceutical industry. Sewage discharge must reach a special discharge limit, that is, chemical oxygen demand (COD) must be less than 50 mg/L. Enterprise development and environmental protection are both the concept of peak health since its establishment. In March this year, on the basis of the original environmental protection facilities, Jianfeng Health carried out technical renovation of waste gas collection and treatment facilities, and at the same time installed a sealing cover on the sewage treatment station to realize the closed collection of waste gas. Since the trial operation of this facility in mid-May, the overall effect has been obvious. The original treatment tank would emit an unpleasant smell during work, but now the smell has been significantly reduced. Compared with the young enterprise of peak health, the relatively "older" peak pharmaceutical has more experience in sewage treatment and environmental protection. Akihama
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-30
Jianfeng Pharmaceutical Won Advanced Collective of Municipal Red Cross Humanitarian Promotion Award
On April 24, the Red Cross Society of Jinhua issued a circular commending the advanced units and individuals of the 2016 Red Cross Humanitarian Promotion Award. Peak Pharmaceutical Company won the Red Cross Humanitarian Promotion Award for Advanced Collective. The Red Cross is a social relief organization engaged in humanitarian work, with the purpose of carrying forward the spirit of humanity, fraternity and dedication, protecting human life and health, and promoting the cause of peace and progress of mankind. As a socially responsible enterprise, Jianfeng Pharmaceutical has always attached importance to public welfare and charity work, vigorously promoted the spirit of the Red Cross, and vigorously supported the work of the Red Cross with practical actions. In September 2016, at the theme publicity activity of "World First Aid Day" and the opening ceremony of the municipal Red Cross emergency rescue station (point), Huang Jinlong, deputy general manager of the group company and general manager of the pharmaceutical company, donated 6 AEDs known as "life-saving artifact" to the Red Cross on behalf of Jianfeng Pharmaceutical, it is equipped with six Red Cross emergency rescue service stations (points), namely, Jinhua high-speed railway station, sports center, cultural center, Shuanglong scenic spot, Siping village scenic spot and Suoyuan village scenic spot. The configuration of AED equipment has played a very good role in improving the emergency rescue capacity of Jinhua's key locations, and has been affirmed by the Red Cross and related units. (Spike Pharmaceuticals)
2020
07-31
Jingmai Airport Test Flight Successfully Runway Cement Spike Manufacturing
On April 7, a Boeing 737-700 aircraft of China Eastern Airlines Yunnan took off from Kunming. After completing two flight test subjects, it landed safely at Lancang Jingmai Airport. This not only marked the basic completion of the airport flight area, The official start of the test flight also marked that the "Peak" brand airport runway cement passed the first "final exam". Lancang Jingmai Airport is a major project with milestone significance in the history of Pu'er transportation construction. Since then, an air corridor connecting southwest Yunnan and Southeast Asia has been added between Kunming and Pu'er, which will greatly promote the development and utilization of tourism resources in Lancang, Menglian and Ximeng "Pu'er Green Triangle" area, and promote the sustainable development of local economy and society; it is of great significance to strengthen the city's national defense construction, maintain border stability, promote national unity, improve emergency rescue capabilities, and promote Pu'er's integration into the country's "Belt and Road" construction. Since the start of the construction of the airport, Yunnan Jianfeng has been paying close attention to it, organizing technical research and repeated tests, and finally produced high-quality airport runway special cement, and with excellent product quality, superior product performance and high-quality service, it has become a runway for Lancang Airport. Cement manufacturer. This not only fills the gap of "peak" airport special cement, but also is of great significance to promote the "peak" brand and improve the market influence of enterprises. It is understood that Jingmai Airport is initially confirmed to be officially opened to traffic at the end of May. (Li Liangping)
2020
07-31