experience of "training"
Release time:
2020-07-22
"Training" Experience
Some time ago, I participated in a trial production of the product. This was a rare exercise opportunity for me and I learned a lot. Through this "training", I realized that in production management, we should not only master the pharmaceutical technology, but also be familiar with and master the equipment in order to use the equipment skillfully.
In this "training", I felt that I was not fully prepared. Let's take a small matter. In the production process, because I did not fully communicate with the engineers of the other party in advance, I directly chose domestic activated carbon when preparing materials during the day. As a result, when I used it in the middle of the night, the engineers said that I would use imported activated carbon. I had to contact the relevant person in charge temporarily to receive imported activated carbon. If you can not get imported activated carbon at that time, it will not only affect the production schedule, but also may bring risks to the quality of drugs. If I am responsible for product production in the future, I will definitely make a detailed production schedule, personnel schedule, material list (name, model, dosage, manufacturer and use time, etc.), equipment list (name, model and other special requirements), work coordination contact list (including which department needs help and which work to cooperate, when do you need their help, etc.)...
During the trial production of the product, the workshop technicians must follow up the whole process. Workshop technicians take turns to track, I personally think it is not very feasible, because our technical strength is relatively weak, and the harvest of visiting the site is far more than that obtained by watching other people's summaries, records and explanations, and the results are also first-hand information, and we can also communicate with engineers at any time and understand more deeply. There is a saying that seeing is better than hearing. I think it is quite appropriate to use it here. As for the limited energy of a person to track the whole process, I personally think that even if the trial production is tracked throughout the whole process, it will only take a few days, and no matter how hard and tired it is, we must get used to continuous fighting and hard fighting. Moreover, the engineer who handed over the process is also a person. He can do it well. I believe we can do it and do it better.
site is a teaching place, but also a practice place. The trial production process is the time when the whole product has the most problems. The site can not only find many problems, but also solve them quickly. In the process of drug production, we should always follow the principle of on-site problem solving, because the scene is the place where problems can be found and the inspiration for solving problems can be triggered most. (Liu Bin)
More information
Tianjin Flemish Company Donates Anti-epidemic Materials
On the morning of July 13, Tianjin Jianfeng Flanders Pharmaceutical Technology Development Co., Ltd. donated materials to the Tianjin Development Zone Charity Association to help the development zone community fight the epidemic.
2020
08-05
In late July, leaders of the group company Jiang Xiaomeng, Yu Jianhong, Chen Tianci and Qin Xuping visited subordinate enterprises separately and sent heatstroke prevention and cooling supplies to employees working under high temperature, urging everyone to pay attention to heatstroke prevention and cooling and safe production work to ensure good physical condition.
2020
08-05
On July 17 and 18, the Group's work analysis meeting for the first half of 2020 was held at the Peak Building of the Group's headquarters to summarize and review the work in the first half of the year and make arrangements for the work in the second half of the year.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-22
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-31