Announcement on the Project of Annual Production of 2 billion Solid Preparations by Peak Pharmaceutical
Release time:
2020-08-05
Securities Code: 600668 Securities Abbreviation: Jianfeng Group Announcement No.: Pro 2018-024
Bond Abbreviation: 13 Spike 02 Bond Code: 122344
Announcement of Zhejiang Jianfeng Group Co., Ltd.
on Jianfeng Pharmaceutical's Annual Production of 2 billion Solid Preparations
The Board of Directors and all directors of the Company guarantee that there are no false records, misleading statements or major omissions in the contents of this announcement, and assume individual and joint responsibility for the truthfulness, accuracy and completeness of its contents.
Important Content Note:
l Project Name: 2 billion Pieces of Solid Preparation Project
l Annual Output of Jinxi Production Base of Jianfeng Pharmaceutical Industry Investment Amount: The total planned investment of the project is 501.46 million yuan, and the source of funds is self-raised.
l Special Risk Reminder: The construction period of this project is relatively long. With the continuous advancement of the domestic medical system reform
, the hospital's strict control of drug proportion, sunshine procurement and quantity procurement, secondary bargaining, prescription outflow, etc. continue to deepen, and drug prices show a downward trend. In addition, trade protectionism is on the rise and competition in the international market will become more intense, profitability may be affected and there is a risk that project returns will not meet expectations.
1. Project Investment Overview
According to the company's strategic policy of "strengthening the main business through cooperation and innovation, standardizing science and seeking development", Zhejiang Jianfeng Pharmaceutical Co., Ltd. (hereinafter referred to as "Jianfeng Pharmaceutical Co., Ltd."), a subsidiary of the company, is based on the development strategy of the company and relevant regulations of national pharmaceutical production, in order to further improve the solid preparation production capacity of Jianfeng Pharmaceutical, it is planned to acquire about 78 mu of land on the north side of the existing factory area of Jianfeng Pharmaceutical in Jinhua Economic Development Zone, set up a new preparation factory area, and build a preparation manufacturing platform that meets the requirements of GMP in Europe and America. The construction of the project with an annual output of 2 billion solid preparations in Jinxi Production Base of Jianfeng Pharmaceutical includes two preparation workshops and supporting storage, quality inspection, public works, etc. After the completion of the preparation workshop 1 to form an annual production capacity of 2 billion pieces of solid preparations, while reserving the preparation workshop 2 for later development.
On August 3, 2018, the fifth meeting of the tenth board of directors of the company reviewed and approved the "Proposal on the Project of 2 billion Solid Preparations per Year in Jinxi Production Base of Jianfeng Pharmaceutical", and agreed to invest in the construction of Jinxi Production Base with an annual output of 2 billion solid preparations.
In accordance with the "Shanghai Stock Exchange Stock Listing Rules", "Articles of Association" and other relevant regulations, this project investment is within the decision-making authority of the company's board of directors and does not need to be submitted to the company's shareholders meeting for approval. Related party transactions do not constitute a major asset reorganization as stipulated in the "Administrative Measures for the Major Asset Reorganization of Listed Companies.
Basic Information of 2. Investment Subject
(I) Investment Subject: Zhejiang Jianfeng Pharmaceutical Co., Ltd.
(II) Enterprise Nature: Other Limited Liability Company
(III) Registered Capital: 198.53 million yuan
(IV) Registered Address: legal Representative of (V) Company
, 2nd Floor, X02 Office Quality Inspection Building, No. 58 Gaofan Section, Baitang Downline, Wucheng District, Jinhua City, Zhejiang Province: Jiang Xiaomeng
(VI) Scope of Business: Drug Research and Development and Production (Operating with Valid License); Annual recovery: 8 tons of isopropanol, 76 tons of ethanol, 40 tons of toluene, 409 tons of dichloromethane, and 11 tons of ethyl acetate (operating with valid licenses); imported raw and auxiliary materials for production and scientific research; imported machinery and equipment, instruments and spare parts. (Projects subject to approval according to law can only be operated after approval by relevant departments)
(VII) Financial Situation: As of December 31, 2017, Jianfeng Pharmaceutical has total assets of 1,193.4823 million yuan and net assets of 378.2793 million yuan attributable to owners of the parent company. In 2017, it will realize operating income of 1,337.522 million yuan, operating profit of 50.6395 million yuan and net profit of 37.6413 million yuan attributable to owners of the parent company. Basic Information of
3. Investment Project
(I) Project Name: Jianfeng Pharmaceutical Jinxi Production Base Annual Output of 2 billion Pieces of Solid Preparation Project
(II) to Form Production Scale after Completion: Annual Output of 2 billion Pieces of Solid Preparation
(III) Total Building Area: 63352 m2
Total (IV) Investment: the total investment is 501.46 million yuan, of which the investment in fixed assets is 481.98 million yuan and the working capital is 19.48 million yuan.
(V) construction progress: after the conditions are met, the project construction period is 2 years. The main content of the
(VI) project: the annual output of 2 billion pieces of solid preparations in Jinxi production base of Jianfeng pharmaceutical includes two preparation workshops and supporting storage, quality inspection, public works, etc. After the completion of the preparation workshop 1 to form an annual production capacity of 2 billion pieces of solid preparations, while reserving the preparation workshop 2 for later development.
Impact of 4. Investment Project on Listed Companies
Jianfeng Pharmaceutical has rich experience in preparation research and development, production and sales. This project will further improve the construction of generic preparation production base, promote the upgrading of preparation industry and enhance the comprehensive competitiveness of the company's pharmaceutical sector. Under the background of preparation internationalization and continuous improvement of generic drug consistency evaluation, this project takes international generic drugs as the entry point, which is of great significance to improve the equipment level and manufacturing capacity of Jianfeng pharmaceutical preparations, expand the industrial scale, optimize the product structure and participate in international competition, and will have a positive impact on the future development of the company.
Risk Analysis of 5. Investment Project
(I) Market Risk
The construction period of this project is relatively long. With the continuous advancement of domestic medical system reform, hospitals continue to deepen the 120 of # in strict control of drug proportion, sunshine procurement and quantity procurement, secondary bargaining, prescription outflow, etc, drug prices are on a downward trend; in addition, trade protectionism is on the rise and competition in the international market will become more intense, which may affect profitability, and there is a risk that the project revenue will not meet expectations .
(II) Project Construction and Management Technical Risks
Project is still in the preliminary preparation stage, and land acquisition and environmental assessment have not yet been completed. With the adjustment of relevant national industrial policies and urban planning, the project construction There are certain uncertainties in the content, cycle and process. After the project is completed and put into production, there is a possibility that the expected goals may not be achieved in terms of product process improvement and cost control, and there are certain management and technical risks.
(III) Capital Risk
The total investment of this project is relatively large. The project is invested through self-raised funds. There is uncertainty as to whether the funds can be in place on schedule. The fund raising and credit policy changes in the construction process, The smoothness of financing channels will make the company bear certain capital risks.
(IV) Approval Risk
After the project is reviewed and approved by the board of directors, the project construction still needs to go through compliance procedures such as safety assessment and environmental assessment, and is still in the process of approval. Therefore, whether the project can be finally implemented, There is still some uncertainty about the progress after implementation.
6. Reference Document
Resolution of the Fifth Meeting of the Tenth Board of Directors
is hereby announced.
Zhejiang Jianfeng Group Co., Ltd. Board of Directors
August 3, 2018
More information
Editor's note: During the National Day, the "Jinhua New Observation" column of Jinhua TV Station launched a series of reports on "National Day New Observation: New Development of Old Enterprises" to understand the new developments of those old enterprises that have grown up with New China in the new era. October 3 broadcast of the "peak of the 'centennial 'ideal", about the development of the peak group and the future direction of development. The "century" ideal of the peak Jinhua TV reporter Wang Dujuan Jiang Qian host: speaking of Zhejiang Jianfeng Group Co., Ltd., Jinhua people are no stranger. The older generation of Jinhua people are more familiar with, may be the predecessor of Jianfeng Group-Jinhua Cement Factory. Open the first old photo 58 years ago, surrounded by mountains and a rice field in the middle. Old Jinhua can see at a glance that this is the Wise Temple, 8 kilometers north of Jinhua City and east of the former Zhuangtou of Luodian Town. In August 1958, the first group of pioneers came here and built Jinhua's first cement factory on a desolate hillside of 16.94 mu with a pair of hands and warm blood. From the earliest cattle-drawn ball forming machine to the electric ball forming machine, from pure manual labor to machine substitution, it took 26 years of hard work. By 1983, the annual output of peak cement reached 120000 tons, the output value was 6.75 million yuan, and the profit was 2.4 million yuan. In these 26 years, the cement plant has experienced a difficult period of the country, and the ten-year catastrophe of the "Cultural Revolution" has finally ushered in a good time of reform and opening up with tenacious vitality, laying the foundation for steady development in the future. Looking at these old pictures,
2020
07-31
Peak Cement Successfully Enters Lancang Airport Project
News from our newspaper On September 26, the first batch of airport runway cement produced by Yunnan Jianfeng Cement Company was successfully delivered to the Lancang Airport site, which marked another important step in the expansion of Jianfeng Cement in the southwest Yunnan market. Lancang Airport is located in Donghi Town, Lancang Lahu Autonomous County, Pu'er City. It is the center of the "three counties" and "Pu'er Green Triangle" tourist areas of Lancang, Menglian and Ximeng, with a wide range of radiation and obvious location advantages. The project is a national "Twelfth Five-Year Plan" construction project and a key construction project in Yunnan Province. It was approved by the State Council and the Central Military Commission in January 2013. It started construction at the end of November 2014 and is expected to be completed in April 2017. The current project of Lancang Airport is designed to meet the target of 250000 passenger throughput and 750 tons of cargo throughput by 2020, including the construction of a 2600-meter-long and 45-meter-wide runway, the construction of a new 3000-square-meter terminal building and 4 apron parking spaces, including communication, navigation, lighting, meteorology and other supporting projects. The total investment of the project is 1.533 billion yuan. Upon completion, it can be used for Boeing 737 series, Airbus A319 and A320 series, MA-60 and other passenger aircraft take off and land. Since the start of the Lancang Airport project, Yunnan Peak has listed it as an important goal to strive. Compared with ordinary cement, special cement for airport runways has the characteristics of small shrinkage, strong wear resistance, good frost resistance and low alkali content in addition to the requirements of ordinary 42.5 Portland cement. To this end, Yunnan peak in the project to strive for at the same time, the collection of technical forces to tackle the problem, in the clinker composition to determine, cooked.
2020
07-31
Jianfeng won the Zhejiang Industrial Award
A few days ago, we learned from the relevant departments of Zhejiang Province that the company won the 2016 "Zhejiang Industrial Award Silver Award". Zhejiang Industrial Award was established in 2014 and is selected every two years. The purpose of carrying out the selection and commendation of the Zhejiang Industrial Awards is to thoroughly implement the "August 8 Strategy", comprehensively implement the innovation-driven development strategy, speed up the industrial transformation and upgrading with the "four for three" as the starting point, and commend the adherence to the scientific concept of development. adhere to industry, conscientiously fulfill social responsibilities, establish a modern enterprise system, and take a new road of industrialization with characteristics. The evaluation work is jointly organized and implemented by Zhejiang Industrial Economic Federation, Enterprise Federation, Entrepreneur Association, relevant provincial industry associations, municipal industrial economic federations, enterprise federations, entrepreneur associations, and relevant units. The award review committee is composed of relevant government departments, provincial "three committees", relevant provincial industry associations, and experts in industrial economy, management, finance, taxation, quality, environmental protection, safety, technology, and law, the participating enterprises are comprehensively evaluated from the aspects of industry demonstration role, scientific and technological innovation, economic benefits, resource utilization, environmental protection, brand strategy, product quality, production safety, social responsibility, enterprise management, human resources and so on. "The enterprises that have won the Zhejiang Industrial Award this time are all outstanding enterprises that have made significant contributions to the promotion of Zhejiang's economic development; they are all leading enterprises, backbone enterprises, and high-growth enterprises from different industries, representing the scale of Zhejiang's industrial development. The direction and leading spirit represent the highest level of Zhejiang's industrial development." According to the organizers related negative
2020
07-31
Peak Cement Successfully Enters Lancang Airport Project
News from our newspaper On September 26, the first batch of airport runway cement produced by Yunnan Jianfeng Cement Company was successfully delivered to the Lancang Airport site, which marked another important step in the expansion of Jianfeng Cement in the southwest Yunnan market. Lancang Airport is located in Donghi Town, Lancang Lahu Autonomous County, Pu'er City. It is the center of the "three counties" and "Pu'er Green Triangle" tourist areas of Lancang, Menglian and Ximeng, with a wide range of radiation and obvious location advantages. The project is a national "Twelfth Five-Year Plan" construction project and a key construction project in Yunnan Province. It was approved by the State Council and the Central Military Commission in January 2013. It started construction at the end of November 2014 and is expected to be completed in April 2017. The current project of Lancang Airport is designed to meet the target of 250000 passenger throughput and 750 tons of cargo throughput by 2020, including the construction of a 2600-meter-long and 45-meter-wide runway, the construction of a new 3000-square-meter terminal building and 4 apron parking spaces, including communication, navigation, lighting, meteorology and other supporting projects. The total investment of the project is 1.533 billion yuan. Upon completion, it can be used for Boeing 737 series, Airbus A319 and A320 series, MA-60 and other passenger aircraft take off and land. Since the start of the Lancang Airport project, Yunnan Peak has listed it as an important goal to strive. Compared with ordinary cement, special cement for airport runways has the characteristics of small shrinkage, strong wear resistance, good frost resistance and low alkali content in addition to the requirements of ordinary 42.5 Portland cement. To this end, Yunnan peak in the project to strive for at the same time, the collection of technical forces to tackle the problem, in the clinker composition to determine, cooked.
2020
07-31
Peak Cement Successfully Enters Lancang Airport Project
News from our newspaper On September 26, the first batch of airport runway cement produced by Yunnan Jianfeng Cement Company was successfully delivered to the Lancang Airport site, which marked another important step in the expansion of Jianfeng Cement in the southwest Yunnan market. Lancang Airport is located in Donghi Town, Lancang Lahu Autonomous County, Pu'er City. It is the center of the "three counties" and "Pu'er Green Triangle" tourist areas of Lancang, Menglian and Ximeng, with a wide range of radiation and obvious location advantages. The project is a national "Twelfth Five-Year Plan" construction project and a key construction project in Yunnan Province. It was approved by the State Council and the Central Military Commission in January 2013. It started construction at the end of November 2014 and is expected to be completed in April 2017. The current project of Lancang Airport is designed to meet the target of 250000 passenger throughput and 750 tons of cargo throughput by 2020, including the construction of a 2600-meter-long and 45-meter-wide runway, the construction of a new 3000-square-meter terminal building and 4 apron parking spaces, including communication, navigation, lighting, meteorology and other supporting projects. The total investment of the project is 1.533 billion yuan. Upon completion, it can be used for Boeing 737 series, Airbus A319 and A320 series, MA-60 and other passenger aircraft take off and land. Since the start of the Lancang Airport project, Yunnan Peak has listed it as an important goal to strive. Compared with ordinary cement, special cement for airport runways has the characteristics of small shrinkage, strong wear resistance, good frost resistance and low alkali content in addition to the requirements of ordinary 42.5 Portland cement. To this end, Yunnan peak in the project to strive for at the same time, the collection of technical forces to tackle the problem, in the clinker composition to determine, cooked.
2020
07-30
Peak two enterprises were commended
On September 23, the launching ceremony of the 2016 Jinhua Zhejiang Shopping Festival and the 2015 Jinhua Honest Enterprise Commendation Conference were held in the urban people's square. Jianfeng Group's Jinhua Jianfeng Pharmacy Chain Co., Ltd. and Zhejiang Jianfeng International Trade Co., Ltd. were commended.
2020
07-31