Remembering the Past
Release time:
2020-08-14
Memories of Past
■ Qiubin Pharmaceutical Factory Wang Haibin
Sun and Moon are like flies. It has been more than 10 20 years since it entered the peak. It was in the late 1990 s. With the deepening of reform and opening up and the restructuring of state-owned enterprises, many employees of state-owned enterprises, including me, were faced with life choices. At that time, there were many employment plans to choose from. I chose Jianfeng Group, because Jianfeng was the only listed company at the same level in Jinhua City at that time, and many young people dreamed of entering. Shortly after my resume was submitted, I successfully received the notice to go to work. At that time, I was very excited and felt that I had a platform to struggle and rely on.
Shortly after I went to work at the peak, I was assigned to the preparatory group of the Pharmaceutical Development Company to engage in the "Special New" disinfectant project transferred from Tianjin Medical Institute. In those years, due to the macro-control of national infrastructure projects and the depression of the cement industry, the group company made a strategic plan to enter the pharmaceutical industry. "Special New" was the first project of Jianfeng Pharmaceutical Development Company, and its significance can be imagined. We are all very excited to be the first batch of workers in the peak medical project, and we also feel the great burden and responsibility on our shoulders.
At that time, the personnel of the project team were basically transferred from outside, including Huang Fu Xiaosheng, a government cadre from Lanxi City, Zheng Yinghua, a process engineer, Wang Yulin, an equipment engineer, Huang Chaoyun and Yang Xiaojuan, chief engineers of the original dyeing and chemical plant, and Li Chengxiang, who graduated from Peking University. These new peak people from all over the world have a common wish, hoping that through the team and their own efforts, the project will be put into effect as soon as possible and contribute to the diversified development of the peak. Some of these former colleagues have retired, some have left the peak, and the memory of them has gradually blurred over time, but the past of those who worked together is still fresh in my mind. During the period of
, the colleagues of the project team worked hard according to the division of labor, day and night. Like everyone else, I do everything well. After careful study and calculation of the pilot scheme and design drawings submitted by Tianjin Medical Institute, according to the accumulation of previous work, the process flow chart with control points and the layout of equipment level and elevation are re-optimized and designed. The process equipment is arranged three-dimensionally according to the reaction steps and operation units. The plant space is reasonably utilized, and the equipment operation, maintenance and production control are more convenient and reliable.
The work during the trial production period is even more complicated. In addition to debugging the machine, we also need to organize raw and auxiliary materials, formulate process regulations, carry out staff training, prepare the trial production plan, etc. Everyone is very busy. The most worrying thing is that the project involves many flammable, explosive, toxic and hazardous chemicals such as toluene, chlorobenzene, n-hexane, ethanol, acetic acid, etc. At that time, the hydrogenation reduction and diazotization reactions in the production process have now been The national safety supervision department determines that it is a dangerous production process, and the requirements for fire and explosion prevention are particularly high. Most of our operators are transferred from cement plants and lack understanding of chemical production. Although they have conducted strict training and assessment before, they have no perceptual knowledge of hazardous chemicals, and they are often careless and random in their work. As a result, several small safety production accidents and attempted accidents occurred. In view of these situations, we have strengthened post inspection and hidden danger investigation, strengthened safety education, training and assessment, especially through strict implementation of hot work, inspection and maintenance and other work permit systems, and strengthened the inspection and assessment of "three violations" to prevent the occurrence of more accidents. Looking back on those days, it was precisely because we practiced the peak spirit of "unity and struggle, truth-seeking and innovation, determination to rise to the top, and forever climbing the peak" that we could complete the project design, equipment installation and trial production in less than half a year.
Although "Texin" was discontinued later due to market changes and improved management requirements, the pace of development of our peak pharmaceutical industry has not stopped. The product "Shu Jiaqing" of the Jiangnan Factory of Dier Pharmaceutical, a joint venture with Dier Pharmaceutical, is sold well in the north and south of the Yangtze River. The merger of Jinhua Biochemical Pharmaceutical Factory and the registration of Zhejiang Jianfeng Pharmaceutical Co., Ltd. have entered a healthy development track since then. With the cephalosporin powder injection preparation workshop, solid preparation workshop and Qiubin Pharmaceutical Factory of Jiangnan Factory of Jianfeng Pharmaceutical Co., Ltd. successively completed and put into operation, new products such as azithromycin, gatifloxacin, Lester, paroxetine and cefmenoxime were successively introduced, and Jinxi Factory, which is in line with international counterparts, was built in 2014 . The enterprise is growing day by day, the technology and equipment are becoming more and more advanced, and the efficiency is getting better and better. As a participant who has witnessed the development of Jianfeng Pharmaceutical from scratch, from small to large, and from weak to strong, I have witnessed the leaders and colleagues who have worked hard for this all the way, and also shared the achievements and joy brought by the development of the enterprise. I deeply realize that only when the enterprise develops can we realize our ideals; only when the employees of the enterprise work hard can the enterprise develop. The individual is a seed, the enterprise is the fertile land, the seed only buried in the fertile land, it is possible to thrive.
Past is like smoke, years are like songs. On the 33rd anniversary of peak start-up 60#, recalling these past events, I am deeply gratified that I decided to come to peak, and proud that I am a peak person! Dripping water en Yongquan newspaper, a mi en thousand dou also. Thanks to the peak for giving us such a platform for development, and thanks to the peak leadership team that led us all the way forward. As an old employee, I will try my best to stand on the last shift. I hope that the young scientific and technological workers of the peak will cherish the development platform provided by the enterprise, motivate themselves with the spirit of the peak, continue to innovate, and strive to create a beautiful century-old peak!
More information
Since the implementation of the large-scale inspection in early November 2016, Daye Jianfeng Cement Company has embarked on a comprehensive institutional adjustment and optimization, which has been carried out for more than five months. In just a few months, the internal management of Daye Peak has achieved a preliminary transformation, the process has been further straightened out, and the work efficiency has also been significantly improved. Reduce the hierarchy and further flatten the management. In the past, in order to avoid responsibilities, there were often repeated and overlapping settings in the setting of enterprise posts, and even there were cases where no one handled the accident and no one took responsibility. In order to truly realize flat management, daye peak merged the original production department, technology department, manufacturing workshop and finished product workshop to form a manufacturing department in early January this year after the implementation of large-scale inspection. Merging the former Environmental Security Department and the Comprehensive Management and Security Department to form the Environmental Security Department; The purchasing functions of the original departments were merged into the purchasing department. The functions of the infrastructure section of the former comprehensive management department were merged into the waste heat power generation department. After the adjustment of the organization, the members of the management team in charge of production also served as department managers, realizing the "sinking" of management ". Adjust and formulate the responsibility system to ensure that tasks are on duty and responsibilities are on duty. In response to changes in institutions and job settings, Daye Peak has carried out a comprehensive revision of the job responsibility system, making requirements around the key indicators of various departments and positions, and implementing "personalization" of responsibilities ". For example, the relevant indicators of mechanics focus on the consumption of machinery and materials, the operation rate of the equipment under their jurisdiction, and the failure time, and the hook for cement and clinker production has been canceled. Responsibility assessment is carried out according to post responsibilities and relevant management systems, and the assessment has been strengthened. In order to understand the actual effect of daye peak institutional reform, on March 30, the group company
2020
07-31
Group Party Committee to determine the annual work plan
The party Committee of the group company has determined its work ideas and work plan for 2017 a few days ago, and relevant work has been arranged below. In view of the current new political and economic situation and the task of enterprise transformation and development, the general requirements of the Party Committee of the Group Company for 2017 are: to thoroughly study and implement the spirit of the Sixth Plenary Session of the 18th CPC Central Committee and the series of important speeches by General Secretary Xi Jinping, the spirit of the Seventh Party Congress of Jinhua City, to closely revolve around the center of enterprise production, operation and reform and development, and to adhere to scientific development and cross-regional development as the first priority, in order to continue to carry out the study and education of "five stars striving for innovation" and "two learning and one doing", we should highlight the main line of comprehensively and strictly administering the party according to the rules, firmly establish the political awareness, overall situation awareness, core awareness and alignment consciousness of the majority of Party members and cadres, strengthen and improve the party building work in enterprises in the spirit of reform, and strive to improve the scientific, standardized and institutionalized level of Party building work in enterprises, in order to promote the scientific development of the group company, leapfrog development and harmonious development, it provides a strong political, ideological and organizational guarantee. The working idea of the Party Committee of the Group Company in 2017 is to focus on "one center", adhere to "one concept", highlight "three key points" and do a good job in "three constructions". That is: centering on the "one center" of enterprise production, operation and reform and development, we should strive to strengthen the "one concept" of "the organic unity of the party's leadership and the improvement of corporate governance"; to "thoroughly implement the main responsibility of the party committee; continue to carry out the study and education of" two learning and one doing "; and improve the system of party building work" as the "three key points", and focus on "team building and team building
2020
07-30
End of 2016 Qualification Review
According to our newspaper, the 2016 employee qualification evaluation work ended a few days ago, and 380 employees obtained new qualifications. Since the implementation of the employee qualification evaluation system in 2010, it has produced certain results in promoting employees to strengthen self-learning and improve and establish a multi-channel career development system for employees. Since the company's cement sector was included in the scope of qualification management for the first time, in accordance with the relevant regulations of the company's employee qualification management, the written examination for this review was conducted in Jinhua, Daye, and Pu'er on December 25, 2016. After professional knowledge examination, performance evaluation and comprehensive evaluation, the qualification of the corresponding grade and grade is finally determined. A total of 380 employees participated in the review, including 40 in management, 59 in technology and 281 in technicians. According to the unit, there are 2 people in the group department, 186 in daye peak, 89 in Yunnan peak, 56 in pharmaceutical company, 6 in international trade company and 41 in peak health. For employees who apply for qualifications above level 3, Group Barton organized a unified review. According to the final results, more than 6 per cent of the total number of persons rated as three or more qualified. (this newspaper reporter)
2020
07-31
Group Party Committee to determine the annual work plan
The party Committee of the group company has determined its work ideas and work plan for 2017 a few days ago, and relevant work has been arranged below. In view of the current new political and economic situation and the task of enterprise transformation and development, the general requirements of the Party Committee of the Group Company for 2017 are: to thoroughly study and implement the spirit of the Sixth Plenary Session of the 18th CPC Central Committee and the series of important speeches by General Secretary Xi Jinping, the spirit of the Seventh Party Congress of Jinhua City, to closely revolve around the center of enterprise production, operation and reform and development, and to adhere to scientific development and cross-regional development as the first priority, in order to continue to carry out the study and education of "five stars striving for innovation" and "two learning and one doing", we should highlight the main line of comprehensively and strictly administering the party according to the rules, firmly establish the political awareness, overall situation awareness, core awareness and alignment consciousness of the majority of Party members and cadres, strengthen and improve the party building work in enterprises in the spirit of reform, and strive to improve the scientific, standardized and institutionalized level of Party building work in enterprises, in order to promote the scientific development of the group company, leapfrog development and harmonious development, it provides a strong political, ideological and organizational guarantee. The working idea of the Party Committee of the Group Company in 2017 is to focus on "one center", adhere to "one concept", highlight "three key points" and do a good job in "three constructions". That is: centering on the "one center" of enterprise production, operation and reform and development, we should strive to strengthen the "one concept" of "the organic unity of the party's leadership and the improvement of corporate governance"; to "thoroughly implement the main responsibility of the party committee; continue to carry out the study and education of" two learning and one doing "; and improve the system of party building work" as the "three key points", and focus on "team building and team building
2020
07-31
Yunnan peak through the safety standard secondary acceptance
On March 21, Yunnan Jianfeng Cement Company successfully passed the evaluation and acceptance of secondary enterprises for safety production standardization. On the same day, a review team composed of leaders of the Yunnan Provincial Work Safety Supervision Bureau and relevant experts reviewed the implementation of the establishment of Yunnan Jianfeng safety production standardization secondary enterprises. According to the 13 elements involved in the "Standard for Assessment and Rating of Safety Production Standardization in Cement Enterprises", the review team conducted strict assessment and scoring item by item through grouping to check the site and review the data, and finally determined that Yunnan Peak passed the standard acceptance of safety standardization secondary enterprises. Yunnan Jianfeng has always attached great importance to safety production. After passing the three-level safety standard enterprise review in 2015, in order to raise the level of enterprise safety management to a new level, in 2016, it began to create secondary safety standardization. Over the past year, Yunnan Jianfeng has insisted on taking the creation of secondary safety standards as the top priority of production and operation management, and has formulated an implementation plan for production safety standardization in accordance with the requirements of national standardization norms. the content covers production safety responsibility system, education and training, safety inspection, safety facilities management and other safety production management standards, systems and post safety operation procedures, while further strengthening daily safety inspection and regularly organizing emergency plan drills, strengthen the investigation and rectification of potential safety hazards and the supervision of important hazard sources, and further consolidate the foundation of enterprise safety production management. After the review, Zhou Jiping, general manager of Yunnan Jianfeng, said that Yunnan Jianfeng will take this standard as a new starting point. On the basis of consolidating the accident-free achievements in production safety for two consecutive years, it will conscientiously implement the main responsibility of production safety and cultivate
2020
07-31
Yunnan peak through the safety standard secondary acceptance
On March 21, Yunnan Jianfeng Cement Company successfully passed the evaluation and acceptance of secondary enterprises for safety production standardization. On the same day, a review team composed of leaders of the Yunnan Provincial Work Safety Supervision Bureau and relevant experts reviewed the implementation of the establishment of Yunnan Jianfeng safety production standardization secondary enterprises. According to the 13 elements involved in the "Standard for Assessment and Rating of Safety Production Standardization in Cement Enterprises", the review team conducted strict assessment and scoring item by item through grouping to check the site and review the data, and finally determined that Yunnan Peak passed the standard acceptance of safety standardization secondary enterprises. Yunnan Jianfeng has always attached great importance to safety production. After passing the three-level safety standard enterprise review in 2015, in order to raise the level of enterprise safety management to a new level, in 2016, it began to create secondary safety standardization. Over the past year, Yunnan Jianfeng has insisted on taking the creation of secondary safety standards as the top priority of production and operation management, and has formulated an implementation plan for production safety standardization in accordance with the requirements of national standardization norms. the content covers production safety responsibility system, education and training, safety inspection, safety facilities management and other safety production management standards, systems and post safety operation procedures, while further strengthening daily safety inspection and regularly organizing emergency plan drills, strengthen the investigation and rectification of potential safety hazards and the supervision of important hazard sources, and further consolidate the foundation of enterprise safety production management. After the review, Zhou Jiping, general manager of Yunnan Jianfeng, said that Yunnan Jianfeng will take this standard as a new starting point. On the basis of consolidating the accident-free achievements in production safety for two consecutive years, it will conscientiously implement the main responsibility of production safety and cultivate
2020
07-31