Remembering the Past
Release time:
2020-08-14
Memories of Past
■ Qiubin Pharmaceutical Factory Wang Haibin
Sun and Moon are like flies. It has been more than 10 20 years since it entered the peak. It was in the late 1990 s. With the deepening of reform and opening up and the restructuring of state-owned enterprises, many employees of state-owned enterprises, including me, were faced with life choices. At that time, there were many employment plans to choose from. I chose Jianfeng Group, because Jianfeng was the only listed company at the same level in Jinhua City at that time, and many young people dreamed of entering. Shortly after my resume was submitted, I successfully received the notice to go to work. At that time, I was very excited and felt that I had a platform to struggle and rely on.
Shortly after I went to work at the peak, I was assigned to the preparatory group of the Pharmaceutical Development Company to engage in the "Special New" disinfectant project transferred from Tianjin Medical Institute. In those years, due to the macro-control of national infrastructure projects and the depression of the cement industry, the group company made a strategic plan to enter the pharmaceutical industry. "Special New" was the first project of Jianfeng Pharmaceutical Development Company, and its significance can be imagined. We are all very excited to be the first batch of workers in the peak medical project, and we also feel the great burden and responsibility on our shoulders.
At that time, the personnel of the project team were basically transferred from outside, including Huang Fu Xiaosheng, a government cadre from Lanxi City, Zheng Yinghua, a process engineer, Wang Yulin, an equipment engineer, Huang Chaoyun and Yang Xiaojuan, chief engineers of the original dyeing and chemical plant, and Li Chengxiang, who graduated from Peking University. These new peak people from all over the world have a common wish, hoping that through the team and their own efforts, the project will be put into effect as soon as possible and contribute to the diversified development of the peak. Some of these former colleagues have retired, some have left the peak, and the memory of them has gradually blurred over time, but the past of those who worked together is still fresh in my mind. During the period of
, the colleagues of the project team worked hard according to the division of labor, day and night. Like everyone else, I do everything well. After careful study and calculation of the pilot scheme and design drawings submitted by Tianjin Medical Institute, according to the accumulation of previous work, the process flow chart with control points and the layout of equipment level and elevation are re-optimized and designed. The process equipment is arranged three-dimensionally according to the reaction steps and operation units. The plant space is reasonably utilized, and the equipment operation, maintenance and production control are more convenient and reliable.
The work during the trial production period is even more complicated. In addition to debugging the machine, we also need to organize raw and auxiliary materials, formulate process regulations, carry out staff training, prepare the trial production plan, etc. Everyone is very busy. The most worrying thing is that the project involves many flammable, explosive, toxic and hazardous chemicals such as toluene, chlorobenzene, n-hexane, ethanol, acetic acid, etc. At that time, the hydrogenation reduction and diazotization reactions in the production process have now been The national safety supervision department determines that it is a dangerous production process, and the requirements for fire and explosion prevention are particularly high. Most of our operators are transferred from cement plants and lack understanding of chemical production. Although they have conducted strict training and assessment before, they have no perceptual knowledge of hazardous chemicals, and they are often careless and random in their work. As a result, several small safety production accidents and attempted accidents occurred. In view of these situations, we have strengthened post inspection and hidden danger investigation, strengthened safety education, training and assessment, especially through strict implementation of hot work, inspection and maintenance and other work permit systems, and strengthened the inspection and assessment of "three violations" to prevent the occurrence of more accidents. Looking back on those days, it was precisely because we practiced the peak spirit of "unity and struggle, truth-seeking and innovation, determination to rise to the top, and forever climbing the peak" that we could complete the project design, equipment installation and trial production in less than half a year.
Although "Texin" was discontinued later due to market changes and improved management requirements, the pace of development of our peak pharmaceutical industry has not stopped. The product "Shu Jiaqing" of the Jiangnan Factory of Dier Pharmaceutical, a joint venture with Dier Pharmaceutical, is sold well in the north and south of the Yangtze River. The merger of Jinhua Biochemical Pharmaceutical Factory and the registration of Zhejiang Jianfeng Pharmaceutical Co., Ltd. have entered a healthy development track since then. With the cephalosporin powder injection preparation workshop, solid preparation workshop and Qiubin Pharmaceutical Factory of Jiangnan Factory of Jianfeng Pharmaceutical Co., Ltd. successively completed and put into operation, new products such as azithromycin, gatifloxacin, Lester, paroxetine and cefmenoxime were successively introduced, and Jinxi Factory, which is in line with international counterparts, was built in 2014 . The enterprise is growing day by day, the technology and equipment are becoming more and more advanced, and the efficiency is getting better and better. As a participant who has witnessed the development of Jianfeng Pharmaceutical from scratch, from small to large, and from weak to strong, I have witnessed the leaders and colleagues who have worked hard for this all the way, and also shared the achievements and joy brought by the development of the enterprise. I deeply realize that only when the enterprise develops can we realize our ideals; only when the employees of the enterprise work hard can the enterprise develop. The individual is a seed, the enterprise is the fertile land, the seed only buried in the fertile land, it is possible to thrive.
Past is like smoke, years are like songs. On the 33rd anniversary of peak start-up 60#, recalling these past events, I am deeply gratified that I decided to come to peak, and proud that I am a peak person! Dripping water en Yongquan newspaper, a mi en thousand dou also. Thanks to the peak for giving us such a platform for development, and thanks to the peak leadership team that led us all the way forward. As an old employee, I will try my best to stand on the last shift. I hope that the young scientific and technological workers of the peak will cherish the development platform provided by the enterprise, motivate themselves with the spirit of the peak, continue to innovate, and strive to create a beautiful century-old peak!
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30