Story of Time
■ Jin Xi Factory Zhang Zhijian
Time flies. It seems that it is only a twinkling of an eye that I have been in peak for 20 years. In the past 20 years, I have been working, studying and growing up. Little by little, my experience is the most precious wealth in my life.
In 1996 5 , I was lucky enough to be a member of the peak. I came to Jinguo Cement Plant (later Jinma Cement Plant) and was assigned to the coal mill position in the firing workshop. The production line of Jinguo Cement Plant was the first batch of rotary kilns in Zhejiang Province. At that time, the equipment was still being debugged. On the second day of work, I received the task of adding steel balls to the ball mill. When I saw that pile of steel balls, I was dumbfounded -- it was so heavy, so big, when would it be added? Fortunately, the squad leader had a way to lead us to line up between the mill and the ball pile, and put the steel balls into the machine one by one. After a busy morning, after a hastily finished lunch, everyone moved it again without taking a rest. I was busy until I got off work and finally finished the task. Although everyone was tired, they were all very happy because the trial production was about to ignite. Now I think of the joy of everyone when the ignition was successful, it seems like yesterday.
worked in the cement factory for less than a year, 1997 3 , I was transferred to Jianfeng Kangjie Chemical Co., Ltd., which was later Jiangnan Pharmaceutical Branch. The pharmaceutical factory has a beautiful environment, a high degree of automation in the production line, and it works indoors and has air conditioning, which is incomparable to the cement factory at that time. I made up my mind to work hard and live up to the company's trust.
In 2004 , the factory assigned me to be responsible for the procurement of raw materials. At that time, due to changes in the general environment, drug prices were repeatedly lowered. To control production costs, it was the most direct and important way to purchase raw and auxiliary materials. For this reason, I bargain with the supplier again and again, and try my best to "compress" the price under the premise of ensuring the quality. After hard work, only two raw materials, cefuroxime sodium and azithromycin, saved the purchase cost of ,200 yuan that year. However, good things took a long time. In that year, the company's funds were relatively tight, and sometimes the payment for goods was not timely enough. I tried every possible means to negotiate with the suppliers to win their understanding and support, extend the payment period, and ease the financial pressure in the factory.
In 2005 , the sales volume of cefmenoxime for injection, the main product, was increasing, and the amount of wastewater generated by production was also increasing, far exceeding the treatment capacity of the environmental protection facilities of Jiangnan Factory at that time, so it could only be pulled to Qiubin Pharmaceutical Factory for sewage treatment. Waste water 50 kg is a big barrel. Jiang Guomin and I are carrying, loading and unloading together, every day. The smell of waste water is very strong, it is disgusting to smell, and it is even more uncomfortable to splash on clothes and trousers, and it is even more unbearable in summer. However, we did not complain at all and handled it properly in time to ensure that the factory passed the environmental protection test smoothly. It was also that year that I was named the first gold medal employee by the group company.
In 2006 , I served as the warehouse monitor of Jiangnan Factory. Warehouse management is very trivial. As long as I have time, I will soak in the warehouse to check the storage and quality of various materials, and report problems to relevant departments in time. On one occasion, the azithromycin packing box sent by the printing factory was mistakenly printed as "Qi". After finding the problem, I immediately contacted the manufacturer to return it and redo it. In the management of pharmaceutical production GMP , the warehouse is also a very important link, so together with the warehouse keeper, I did a good job in the acceptance, warehousing, storage and distribution of materials in strict accordance with the specifications, and successfully passed the previous certification inspection. In normal work, if we find that there are raw and auxiliary materials, packaging materials or finished product quality inspection forms that have not arrived, we should also do a good job in linking up with the laboratory work. On one occasion, a batch of cefmenoxime had to be delivered in a hurry, but the quality inspection form was not yet in place. I contacted the central laboratory and learned that it had been opened. I rode my bike to get it back immediately without delaying the delivery.
From Jinguo Cement Company to Kangjie Chemical Company, and from Jiangnan Factory to Jinxi Factory now, along the way, I have witnessed the ups and downs in the process of peak development, tears and laughter, confusion and emotion, but what is more in my heart is a persistence-persisting in studying and striving to improve my business level. Adhere to strict demands on yourself, do every job well in a down-to-earth and conscientious manner. The spirit of "unity and struggle, truth-seeking and innovation, determination to rise to the top and climb the peak forever" promotes the continuous development of the peak cause and makes me grow up with the peak.
More information
Tianjin Flemish Company Donates Anti-epidemic Materials
On the morning of July 13, Tianjin Jianfeng Flanders Pharmaceutical Technology Development Co., Ltd. donated materials to the Tianjin Development Zone Charity Association to help the development zone community fight the epidemic.
2020
08-05
In late July, leaders of the group company Jiang Xiaomeng, Yu Jianhong, Chen Tianci and Qin Xuping visited subordinate enterprises separately and sent heatstroke prevention and cooling supplies to employees working under high temperature, urging everyone to pay attention to heatstroke prevention and cooling and safe production work to ensure good physical condition.
2020
08-05
On July 17 and 18, the Group's work analysis meeting for the first half of 2020 was held at the Peak Building of the Group's headquarters to summarize and review the work in the first half of the year and make arrangements for the work in the second half of the year.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-22
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-31