Daye peak video surveillance project officially launched
Release time:
2020-08-14
Daye Peak Video Monitoring Project Officially Started
News 11# July 10 , with the laying of communication optical fibers, Daye Peak Cement Company's industrial digital video monitoring management system project officially started.
This project includes the control center, important production lines in the plant, important production posts, plant logistics management, image monitoring and digital video recording systems for all important access channels and other major entrances and exits, as well as reserved channels for future expansion. This system project adopts 2 sets of GS - C3 - AQ high temperature furnace flame monitoring industrial TV system, 13 network infrared IP HD ball machine, 75 network infrared IP HD gun machine to realize monitoring coverage of the entire cement line production range. With optical fiber and network cable as the transmission medium, the video signal collected from the front end is transmitted to the collection center through the optical fiber transceiver, and then collected to the centralized management center of the central control room through the switch. Through the software of the network video monitoring system, the video signal collected from the front end is switched by splicing a large screen, and the video signal collected from the front end is divided and displayed on the wall. At the same time, the control of the front-end camera monitoring point is realized. In addition, through the configured network hard disk video recorder for storage and network transmission, to facilitate future access to surveillance video data. The entire system set video capture, video display, front-end control, storage video. Network transmission as a whole, basically meet the modern plant on the cement line process production area and security monitoring.
The completion of the monitoring system can effectively display and monitor the safety prevention area of the factory, can record and trigger video for a long time, and provide management data and case evidence. It can reduce a large number of personnel fatigue in patrol inspection and save human resources. Can carry out high-definition video monitoring on all parts of the factory in real time; Can effectively ensure safety, find abnormal situations in time and take treatment measures, will be possible to reduce the hidden dangers; through the LAN for remote monitoring of the safety and security of the plant. (Shi Zhangliang)
More information
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-31
The water and soil conservation scheme of Daye Peak Mine passed the review.
The water and soil conservation plan of Jinshan limestone mine and Baiyunsi sand shale mine of Daye Peak Cement Company passed expert review a few days ago. In order to effectively prevent and control soil erosion, protect and rationally utilize water and soil resources, reduce water, drought, wind and sand disasters, and improve the ecological environment, in accordance with the "the People's Republic of China Soil and Water Conservation Law", "Management Measures for Soil and Water Conservation Programs for Development and Construction Projects" and other laws and regulations Relevant technical specifications and the requirements of local management departments, Daye Peak commissioned Daye City Soil and Water Conservation Test Station in May this year to prepare soil and water and soil and soil conservation plans for Jinshan limestone mine. Recently, the water and soil conservation plans of the two mines have been prepared and reviewed by experts. After nearly a day of careful review, the participating experts and leaders gave a high evaluation of the plan, and put forward some suggestions and opinions for improvement. At the same time, they fully affirmed Daye Peak's attitude of attaching great importance to the work of soil and water conservation in the mine, and unanimously agreed that the above two The plan passed the review. The service life of water and soil conservation scheme of Jinshan Limestone Mine and Baiyunsi Sand Shale Mine is 5 years. In the next five years, Daye Peak will entrust water and soil conservation supervision and monitoring, and gradually organize the implementation of prevention and control measures in accordance with the plan. By 2021, Daye Peak will prepare a technical evaluation report based on the implementation of the water and soil conservation plan, check the construction and implementation of responsibilities, evaluate the effect of soil erosion prevention and control, and apply for completion acceptance. (Daye Peak)
2020
07-31
Daye Peak Launches Anti-"Three Violations" Special Activities
Recently, Daye Jianfeng Cement Company has set up a special leading group for "anti-three violations" activities headed by Zhang Fengliang, deputy general manager of the group company and general manager of Daye Jianfeng, to vigorously carry out anti-"three violations" activities throughout the plant. Most safety accidents come from illegal command, illegal operation and violation of labor discipline. In order to reduce or even put an end to the phenomenon of "three violations", eradicate persistent diseases in violation of rules and regulations, eliminate hidden dangers of accidents, standardize employees' production safety behavior, and prevent the occurrence of all kinds of production safety accidents, Daye Peak has carried out special activities against "three violations" according to the requirements of the implementation plan of "anti-three violations, accident prevention and safety protection" carried out by the Safety Committee of Baoan Town. The purpose is to strengthen employees' understanding of the harmfulness, make safety education and training more targeted, make the implementation of safety rules and regulations more in place, improve employees' awareness of safety production and safety skills, avoid personal injury accidents, misoperation accidents and other liability accidents caused by violations, and effectively achieve safety production standardization Anti-violation, procedural accident prevention, standardization to ensure safety, and fully achieve the 2016 safety production work goal. According to the plan, this activity is divided into three stages: the first stage is from September 1 to September 15, which is the mobilization and deployment stage; the second stage is from September 16 to October 15, which is the implementation stage; the third stage is from October 16 to October 20, which is the summary and improvement stage. The activities mainly carried out self-examination of "anti-three violations" by hanging safety slogans and banners, and organized the study of safety regulations such as "100 typical violations of production safety" and "post safety operation procedures".
2020
07-30
Spike Pharmaceuticals Enters Infant Drug Market
Jindal Baby Drug Co., Ltd. Established Peak Pharmaceuticals to Enter Infant Drug Market Recently, Zhejiang Jindal Baby Drug Co., Ltd., a Sino-German joint venture controlled by Peak Pharmaceuticals, completed registration. Peak Pharmaceuticals will use this as a basis to introduce German technology and products and develop the infant drug market. Zhejiang Jindel Baby Drug Co., Ltd. was jointly funded by Jianfeng Pharmaceutical, Germany Gefu Pharmaceutical Co., Ltd. and Zhuhai Hengqin Deyunjia International Trade Co., Ltd., with a registered capital of 20 million yuan, of which Jianfeng Pharmaceutical contributed 11 million yuan in cash, accounting for 55% of the registered capital. Gefu Pharmaceuticals invested 5 million yuan in the evaluation of two proprietary technologies of "diazepam suppository" and "acetaminophen suppository, 25% of the registered capital; De Yunjia contributed 4 million yuan in cash, accounting for 20% of the registered capital. The company's registered address is in Jinxi Development Zone, Jinhua City. It will rent the existing factory building of Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory for renovation, and strive to absorb their respective expertise and adopt appropriate advanced technology and scientific management methods. A modern pharmaceutical enterprise focusing on the research and development, production and sales of pharmaceutical preparations for infants and children. In this cooperation, the corresponding products of "diazepam suppository" and "acetaminophen suppository", which Ge Fu pharmaceutical has invested in with proprietary technology evaluation, have been listed in Germany, among which diazepam suppository is a therapeutic drug for anti-anxiety, sleep disorder and muscle tension increase; acetaminophen is used for fever caused by cold or cold, and also for relieving mild to moderate pain. After the establishment of the joint venture company, it will be based on these two know-how.
2020
07-31
Jinhua City People's Congress Leaders Peak Survey
On July 26, Cai Jian, deputy director of the Jinhua Municipal People's Congress, Chen Zhishi, secretary general of the Standing Committee of the National People's Congress, and a group of four people visited Jianfeng to conduct research on the introduction of talents and technological innovation, and to communicate with Jiang Xiaomeng, Yu Jianhong, Huang Jinlong, Xiang Chongping, Lan Xiaolong and other group company leaders conducted in-depth exchanges. (this newspaper reporter)
2020
07-31