Behind the Luck.
Release time:
2020-08-14
"Luck"
Artificial Bezoar Workshop Reconstruction Documentary
After four months of intense work, 8# September 9 , the artificial bezoar technical renovation project of Qiubin Factory was successfully completed, 8 18 , 19 , 20 , the trial production of the first three batches of products was successfully completed. Yi Shengrong, director of the Akihama Factory, lamented, "We are lucky this time".
Good luck, this is of course a joke. To do such a big project well, luck alone is of course not enough. What really plays a decisive role is the seriousness and hard work of the project team members.
Pharmaceutical Company has many years of successful experience in producing artificial bezoar, but from the beginning of the project transformation, due to the use of raw materials, production process, process standards, and production scale are almost different, so the previous experience is not for them. Help, can only be explored from scratch through the efforts of participating construction personnel. From the beginning of the
project, the project team was formed by Yi Shengrong, director of Qiubin Factory, Yu Chengfeng, production technology department, Yan Xixia, workshop director, Fang Weiming, mechanic, and Tang Songnian, electrician. While ensuring normal production, the project began to transform. The civil engineering project of workshop
started in March 4 . The project team members divided their work according to their own fields. Fang Weiming and Tang Songnian, who were responsible for equipment selection, went to many equipment manufacturers to understand relevant information, make comparisons and prepare for bidding. Compared with the previous production, the requirements for environmental protection are higher now. When designing the artificial bezoar workshop, it was decided to adopt dust-free transportation. All equipment is connected through pipelines. In order to meet this requirement, most equipment must be customized from the manufacturer. Before the formal bidding of the equipment, the project team also held a special meeting to brainstorm and put forward opinions and suggestions on equipment selection according to the collected information and their own work experience. It has been suggested that corn starch is one of the main raw materials for the production of artificial bezoar. A lot of heat will be generated during the ball milling process. If the temperature is too high, the starch will stick together and affect the quality of the product. Although there is no requirement for this in the process standard, it can be related to the quality of the product, so when selecting the equipment, the equipment manufacturer is required to increase the cooling system for the heat dissipation problem of the ball mill. Fang Weiming said that it takes three months for general equipment manufacturers to obtain orders and provide products, but we only have more than one month, and the equipment is not stereotyped, so the two sides have communicated repeatedly many times.
Despite this, there were still some small "episodes" in the acceptance stage before the equipment entered the site ". There is a gap between the inlet and outlet of the equipment and the previous requirements, which will cause waste of raw materials. But because the construction period is very tight, the time nodes of each link are very close, if you can not enter the site on time, the whole project will be affected. This can be anxious for the project team. After communication and arrangement, it was finally decided to give the equipment manufacturer a week to revise it. After meeting the required requirements, the equipment was pulled over quickly. Other minor problems can only be to let the equipment manufacturer personnel come over and make on-site modifications.
In the trial production stage, in order to save costs, Qiubin Factory decided that the batch of products is 100 kg, while the design capacity of the equipment is 500 kg. There is no data that can be directly referred to for the process parameters such as ball mill speed, ball milling time and ball quantity. Before the trial, the members of the project team also consulted relevant production enterprises, however, the other party has only tried batch 300 kg, and has not succeeded. There are more than ten kinds of trial production schemes involved in the three parameters. Time and cost are not allowed to try multiple schemes. We can only rely on the collection and selection of indirect experience collected by project team members from various channels, and finally confirm the formation of the scheme decided to put into production. The trial production was an unexpected success. All the indexes of the three batches of trial production products passed the test. Moreover, the color, the most difficult index to control for artificial bezoar, was highly recognized by the sales agent.
The implementation of the whole project is relatively smooth, and there may be elements of luck, but behind this "luck", only the participants know how much effort and hardship they have put in. Cleaning the workshop equipment happens to be the hottest time. The weather has been more than 40 degrees for more than half a month, which makes the project team members unable to bear it. The workshop that has just been renovated is very dusty, but in order to ensure the cleaning quality, the air conditioner cannot be turned on, so it can only be cleaned under high temperature. Once out of the workshop, the whole person seems to have been soaked in water, and none of his body is dry. Moreover, his body is covered with dust. If there is something to do in the production workshop, he has to change clothes first.
Yan Xixia was impressed by one thing. The proportion and amount of balls in the ball mill will directly affect the product quality. For this reason, the two employees put 4 alumina balls of different sizes, totaling 2 tons, into small baskets one by one, and poured them into the ball mill with their bare hands for testing. The ball mill is large in size, and the feed port is above the machine. Employees holding the ball have to walk on a platform more than two meters high before they can pour in. If the ratio is not right, it has to be poured out again, cleaned, dried, and then poured in baskets again. This data alone has been tried for 3. four days. It goes up and down dozens of times a day. It is completely a physical job. Sometimes my hands shake after work. And sometimes afraid of miscounting the number of balls, employees squat down directly one by one.
Not only that, during the entire construction period from 4 to 7 February, Yu Chengfeng, Fang Weiming and Tang Songnian did not rest for a day and gave up their holidays. As long as the construction unit was present, they would have to be there. Finally, even the number of overtime days was not counted.
The end of the three batches of trial production products does not mean the end of this technological transformation project. They have a more important task, that is, to apply for GMP certification, and are now preparing for relevant materials. (Reporter Ni Yingzhen)
More information
In the eastern corner of the production area of Jianfeng Health Technology Company, there is a very inconspicuous building. From below, only a few pipes of uneven thickness can be seen on the top and the slogan "Focus on Environmental Protection and Promote Sustainable Development" with red letters on the yellow background on the stainless steel guardrail. Walking up, you can only see several closed pools and a small room with stacks of documents, test tubes, glass bottles and other testing tools on the table. This is the peak and healthy sewage treatment station. The production sewage of the whole factory area is concentrated here. After adjustment (PH adjustment), pre-acidification, anaerobic, anoxic, aerobic (aeration), precipitation and other links, it is discharged into the pipe network after reaching the special discharge standard. Yin Zhiwu, executive deputy general manager of Jianfeng Health, said that because the sewage treatment station in Wucheng District has not yet been built, Jianfeng Health has not yet been able to achieve pipe discharge, and the relevant national laws have strict requirements on the discharge of water pollutants from the extraction pharmaceutical industry. Sewage discharge must reach a special discharge limit, that is, chemical oxygen demand (COD) must be less than 50 mg/L. Enterprise development and environmental protection are both the concept of peak health since its establishment. In March this year, on the basis of the original environmental protection facilities, Jianfeng Health carried out technical renovation of waste gas collection and treatment facilities, and at the same time installed a sealing cover on the sewage treatment station to realize the closed collection of waste gas. Since the trial operation of this facility in mid-May, the overall effect has been obvious. The original treatment tank would emit an unpleasant smell during work, but now the smell has been significantly reduced. Compared with the young enterprise of peak health, the relatively "older" peak pharmaceutical has more experience in sewage treatment and environmental protection. Akihama
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-31
2016 Annual General Meeting of Shareholders
News from our newspaper On May 19, the on-site meeting of Jianfeng Group's 2016 Annual General Meeting of Shareholders was held in Conference Room 314 of Jianfeng Building to deliberate and pass the "2016 Annual Report on the Work of the Board of Directors" and other proposals. The meeting was convened by the board of directors of Jianfeng Group and chaired by Chairman Jiang Xiaomeng. A total of 6 shareholders and proxies attended the meeting, and the total number of voting shares held by them was 55,604,815, accounting for 16.16 of the total voting shares of the company. Some directors, supervisors and secretary of the board of directors of the company attended the meeting, and some senior managers attended the meeting as nonvoting delegates. The meeting was held and voted on by a combination of on-site voting and online voting, it deliberated and passed nine proposals, including the 2016 Work Report of the Board of Directors, the 2016 Work Report of the Board of Supervisors, the 2016 Financial Final Accounts Report, the 2016 Profit Distribution Proposal, the Proposal to Hire the Company's 2017 Audit Institution, the Proposal to Provide Guarantee to Holding Subsidiaries, the 2016 Annual Report and its Summary, the Election of Mr. Huang Sujian as Director of the Company and the Election of Mr. Chen Tianci as Supervisor of the Company. (Zhou Hengbin)
2020
07-30
Jianfeng Pharmaceutical Won Advanced Collective of Municipal Red Cross Humanitarian Promotion Award
On April 24, the Red Cross Society of Jinhua issued a circular commending the advanced units and individuals of the 2016 Red Cross Humanitarian Promotion Award. Peak Pharmaceutical Company won the Red Cross Humanitarian Promotion Award for Advanced Collective. The Red Cross is a social relief organization engaged in humanitarian work, with the purpose of carrying forward the spirit of humanity, fraternity and dedication, protecting human life and health, and promoting the cause of peace and progress of mankind. As a socially responsible enterprise, Jianfeng Pharmaceutical has always attached importance to public welfare and charity work, vigorously promoted the spirit of the Red Cross, and vigorously supported the work of the Red Cross with practical actions. In September 2016, at the theme publicity activity of "World First Aid Day" and the opening ceremony of the municipal Red Cross emergency rescue station (point), Huang Jinlong, deputy general manager of the group company and general manager of the pharmaceutical company, donated 6 AEDs known as "life-saving artifact" to the Red Cross on behalf of Jianfeng Pharmaceutical, it is equipped with six Red Cross emergency rescue service stations (points), namely, Jinhua high-speed railway station, sports center, cultural center, Shuanglong scenic spot, Siping village scenic spot and Suoyuan village scenic spot. The configuration of AED equipment has played a very good role in improving the emergency rescue capacity of Jinhua's key locations, and has been affirmed by the Red Cross and related units. (Spike Pharmaceuticals)
2020
07-31
Jingmai Airport Test Flight Successfully Runway Cement Spike Manufacturing
On April 7, a Boeing 737-700 aircraft of China Eastern Airlines Yunnan took off from Kunming. After completing two flight test subjects, it landed safely at Lancang Jingmai Airport. This not only marked the basic completion of the airport flight area, The official start of the test flight also marked that the "Peak" brand airport runway cement passed the first "final exam". Lancang Jingmai Airport is a major project with milestone significance in the history of Pu'er transportation construction. Since then, an air corridor connecting southwest Yunnan and Southeast Asia has been added between Kunming and Pu'er, which will greatly promote the development and utilization of tourism resources in Lancang, Menglian and Ximeng "Pu'er Green Triangle" area, and promote the sustainable development of local economy and society; it is of great significance to strengthen the city's national defense construction, maintain border stability, promote national unity, improve emergency rescue capabilities, and promote Pu'er's integration into the country's "Belt and Road" construction. Since the start of the construction of the airport, Yunnan Jianfeng has been paying close attention to it, organizing technical research and repeated tests, and finally produced high-quality airport runway special cement, and with excellent product quality, superior product performance and high-quality service, it has become a runway for Lancang Airport. Cement manufacturer. This not only fills the gap of "peak" airport special cement, but also is of great significance to promote the "peak" brand and improve the market influence of enterprises. It is understood that Jingmai Airport is initially confirmed to be officially opened to traffic at the end of May. (Li Liangping)
2020
07-31