The party flag flutters on the repair post
Release time:
2020-08-14
party flag fluttered on the emergency repair post
6# may at about 8 8 p.m., refractory bricks fell off the barrel of Yunnan peak kiln. after research, it was decided to carry out this unplanned emergency repair of the kiln.
When the general manager and deputy general manager in charge of production were on a business trip, Fang Xuhua, secretary of Yunnan Jianfeng Party branch and deputy general manager, stepped forward as commander and was responsible for general coordination. A party member emergency repair commando was quickly set up. The party branch member and deputy general manager Tan Guojian, probationary party member and deputy general manager Lu Hongzheng, assistant manager Lou Xuxin, kiln system supervisor Xiong Guoyun, and material procurement director Yang Shunchang, yu Wei, deputy director of the safety and environment department, and other party members and cadres, as well as some front-line party members and party activists, have carried out a clear division of labor, set a time node for the completion of emergency repairs, and adhere to a daily schedule.
After the emergency repair battle started, the party members of the commando team were like a banner. Wherever they went, they would drive a piece of land. They were all in front of the charge. They were not afraid of the heat and heat, regardless of day and night, which demonstrated the advanced nature of the party members. Moving deeds have emerged one by one.
Lu Hongzheng's daughter suffered a broken leg in a car accident some time ago and was unable to stand after the operation. During the rush repair period, she was caught up with her daughter's senior high school entrance examination and was carried into the examination room. Supposedly, he should go back to accompany her through the first big test in her life, but he offered that he was a probationary party member and could not evade retreat at this critical moment. In addition to coordinating, borrowing clinker and purchasing emergency materials, he also kept shuttling back and forth at the maintenance site to check safety and guide maintenance.
Tan Guojian is responsible for coordinating on-site process emergency repair and equipment maintenance. During the whole process of emergency repair, he had the least rest. From the transfer of maintenance personnel, the supervision of the quality and progress of the maintenance site, he took a nap in his chair when he was sleepy. When he woke up, he either called or went to the scene. He hardly returned to the dormitory. His eyes were red and his voice was hoarse, but he never asked to get off the fire line.
Faced with difficulties such as tight time, heavy tasks and harsh construction environment, Lou Xuxin and Song Xiaofei of the Production and Manufacturing Department actively coordinated the emergency repair team, implemented the emergency repair project and prepared the emergency repair materials, so that there was no delay in the emergency repair work from the beginning to the end. More than ten hours after the kiln was stopped, Song Xiaofei and Xiong Guoyun went into the kiln to check and confirm the refractory repair site regardless of the high temperature. The latter two followed the construction progress and quality for 24 hours, and actively coordinated the rest team to return to the factory to work overtime under the condition of tight manpower. The machine repair team of the production and manufacturing department closely revolves around the time node of kiln brick replacement, works overtime to check and deal with hidden dangers in the operation process, solves hidden dangers such as damage and ash in the air duct of the dust collector of the coal vertical mill, denudation of the tooth surface of the high-speed shaft of the storage bucket, etc., and provides guarantee for the subsequent stable operation.
The logistics department also specially arranged party member drivers to be on duty and be responsible for vehicles on standby. Party members in the logistics department also took the initiative to send cold mung bean soup and purified water to the emergency repair personnel fighting in the high-temperature front line to do a good job in logistics support.
After coordination and linkage from top to bottom and intensive operation, the emergency repair project originally planned to be completed in four days took only three days and 6 hours, which was successfully ignited ahead of schedule and minimized the company's losses.
One by one touching examples, let us feel the spirit of party members and cadres at critical moments, who are brave to take responsibility, not afraid of hardships and dangers, and do not care about personal gains and losses. Facts have proved that the Yunnan Jianfeng Party Branch is indeed a team that can endure hardships and fight. (Shi Wenting)
More information
Peak re-listed China's top 100 cement production capacity Daye peak won the "smart factory leader"
On July 11-12, the 2022 China Cement Industry Summit and TOP100 Award Ceremony organized by China Cement Network, an authoritative media of China's cement industry, was held in Hangzhou. Jianfeng Group once again ranked among the top 100 cement clinker production capacity in China.
2022
08-04
On the afternoon of July 12, the party Committee of the group company held a special meeting attended by party Committee members, senior and middle-level management backbones, heads of grass-roots party organizations and all party members of the group headquarters to learn and convey the spirit of the 15th party congress of the communist party of China in Zhejiang province.
2022
07-24
On the morning of July 1, more than 40 members of the group's party committee, party members of various branches of the group headquarters, and party members of subordinate enterprise branches went to the Shuanglong Hydropower Station, the Red Education Base of Jinhua City, to receive party spirit and revolutionary tradition education.
2022
07-14
Vocational skill level identification examination!
On June 16 and 18, the theoretical and practical examinations for the determination of professional skill level in the peak pharmaceutical sector were held successively in Jinxi pharmaceutical factory. The independent identification of vocational skill level includes three occupations (types of work): pharmaceutical preparation worker, chemical inspector and organic synthesis worker, basically covering the main posts in the pharmaceutical sector, with a total of 125 employees signing up for the identification.
2022
06-21
On June 16, the Jianfeng Pharmaceutical Quality Research and Development Party Branch and the Jinhua Vocational Skills Management Service Center Party Branch held a signing ceremony in Jinxi Factory to establish a party building alliance.
2022
06-21
Jinhua Mayor Xing Zhihong to Peak Research
On the afternoon of June 1, Jinhua Mayor Xing Zhihong, Wucheng District Party Committee Secretary Gao Feng, District Mayor Hu Yuxian, and heads of the Municipal Economic and Information Bureau, Development and Reform Bureau and other departments went to the group headquarters to discuss and exchange with the leaders of the group company to understand the development of the enterprise. Solicit opinions and suggestions from enterprises on government work. After understanding the current business situation of the peak, Xing Zhihong pointed out that focus, follow the right path, frontier, steady, is the peak to long-term prosperity of the magic weapon, must continue to adhere.
2022
06-13