Announcement of Jianfeng Group Lin2017 -005 on Subsidiary Obtaining Drug Clinical Trial Approval
Release time:
2020-08-05
Securities Code: 600668 Securities Abbreviations: Jianfeng Group Number: Pro 2017-005
Bond Abbreviations: 13 Peak 01 Bond Code: 122227
Bond Abbreviations: 13 Peak 02 Bond Code: 122344
Zhejiang Jianfeng Group Co., Ltd.
Announcement on Subsidiaries Obtaining Approval for Drug Clinical Trials
The Board of Directors and all directors of the Company guarantee that there are no false records, misleading statements or major omissions in the contents of this announcement, and assumes individual and joint responsibility for the truthfulness, accuracy and completeness of its contents .
1. Summary
Recently, Zhejiang Jianfeng Pharmaceutical Co., Ltd. (hereinafter referred to as "Jianfeng Pharmaceutical"), a subsidiary of the Company, received the "Drug Clinical Trial Approval Document" (Deoxypodophyllotoxin for Injection, Approval Document No.: 2017L01082 ) and (Deoxypodophyllotoxin, Approval Document No: 2017L01083)(hereinafter collectively referred to as "DPT"). The relevant details are hereby announced as follows:
2. drug basic information content
(I) deoxypodophyllotoxin
drug name: deoxypodophyllotoxin
English name: Deoxypodophyllotoxin
dosage form: bulk drug
application items: domestic Drug Registration
Registration Classification: Chemical Drug Class 1
Applicant: Zhejiang Jianfeng Pharmaceutical Co., Ltd. and China Pharmaceutical University
Approval Conclusion: "According to the the People's Republic of China Drug Administration Law and relevant regulations, after examination, this product meets the relevant requirements of drug registration and agrees to conduct clinical trials of this product preparation."
(II) deoxypodophyllotoxin for injection
drug name: deoxypodophyllotoxin for injection
English name: Deoxypodophyllotoxin for Injection
dosage form: injection
application items: domestic drug registration
specification: 100mg
registration classification: chemical drugs category 1
applicant: Zhejiang Jianfeng pharmaceutical co., ltd. and China pharmaceutical university
approval conclusion: "according to the the People's Republic of China drug administration law and relevant regulations, after examination, this product meets the relevant requirements of drug registration and agrees to carry out clinical trials."
Research and Development and Registration of 3. Drugs
DPT Project was established in March 104 by 2012. Jianfeng Pharmaceutical Co., Ltd. is a new anti-tumor drug developed in cooperation with China Pharmaceutical University. The registration classification belongs to Class 1 of chemical drugs. The first DPT clinical trial application submitted by Jianfeng Pharmaceutical was accepted on July 27, 2016 (acceptance numbers: CXHL1600201 Zhejiang, CXHL1600202 Zhejiang). DPT is an alkaloid antineoplastic drug with tentative indications for lung cancer, breast cancer and gastric cancer, which will be finalized based on clinical trial results. As of the date of this announcement, the accumulated research and development investment and other related expenditures of the DPT project of Jianfeng Pharmaceutical Co., Ltd. totaled about 34.12 million yuan.
Market Situation of Similar Drugs in 4.
Currently, the same alkaloid anti-tumor drugs listed in China mainly include paclitaxel, vinorelbine and docetaxel. The main manufacturers of paclitaxel injection include Yangzijiang Pharmaceutical Group Co., Ltd., Beijing Shuanglu Pharmaceutical Co., Ltd., Haizheng Pfizer Pharmaceutical Co., Ltd., etc, the main manufacturers of Vinorelbine include Jiangsu Haosen Pharmaceutical Group Co., Ltd., Jiangsu Hengrui Pharmaceutical Co., Ltd., Haizheng Pfizer Pharmaceutical Co., Ltd., etc., and the main manufacturers of docetaxel injection include Jiangsu Hengrui Pharmaceutical Co., Ltd., Yangtze River Pharmaceutical Group Co., Ltd.
According to IMS database statistics, the global sales of the above three drugs in 2015 were 16.46, 1.07 and 0.669 billion US dollars respectively, totaling 2.422 billion US dollars.
5. products still need to go on the market.
DPT is currently in the approved clinical trial stage. Jianfeng Pharmaceutical will complete the clinical trial according to the requirements of the "Drug Clinical Trial Approval". After the clinical trial is completed, it will declare for production. It can only produce and market after passing the review and approval of CFDA and obtaining the drug production approval.
Impact of 6. on Listed Companies and Risk Tips
The company has obtained the "Drug Clinical Trial Approval" this time, which will not have a significant impact on the company's recent operating results.
Due to the particularity of drug research and development, there are unpredictable risks such as long cycle and many links from clinical trials to commissioning. There are many uncertainties in the progress and results of clinical trials and the future product market competition situation. The company will be based on the progress of research and development in a timely manner to fulfill the obligations of information disclosure, so that the majority of investors pay attention to investment risks.
hereby announce
Zhejiang Jianfeng Group Co., Ltd. Board of Directors
March 22, 2017
More information
Editor's note: During the National Day, the "Jinhua New Observation" column of Jinhua TV Station launched a series of reports on "National Day New Observation: New Development of Old Enterprises" to understand the new developments of those old enterprises that have grown up with New China in the new era. October 3 broadcast of the "peak of the 'centennial 'ideal", about the development of the peak group and the future direction of development. The "century" ideal of the peak Jinhua TV reporter Wang Dujuan Jiang Qian host: speaking of Zhejiang Jianfeng Group Co., Ltd., Jinhua people are no stranger. The older generation of Jinhua people are more familiar with, may be the predecessor of Jianfeng Group-Jinhua Cement Factory. Open the first old photo 58 years ago, surrounded by mountains and a rice field in the middle. Old Jinhua can see at a glance that this is the Wise Temple, 8 kilometers north of Jinhua City and east of the former Zhuangtou of Luodian Town. In August 1958, the first group of pioneers came here and built Jinhua's first cement factory on a desolate hillside of 16.94 mu with a pair of hands and warm blood. From the earliest cattle-drawn ball forming machine to the electric ball forming machine, from pure manual labor to machine substitution, it took 26 years of hard work. By 1983, the annual output of peak cement reached 120000 tons, the output value was 6.75 million yuan, and the profit was 2.4 million yuan. In these 26 years, the cement plant has experienced a difficult period of the country, and the ten-year catastrophe of the "Cultural Revolution" has finally ushered in a good time of reform and opening up with tenacious vitality, laying the foundation for steady development in the future. Looking at these old pictures,
2020
07-31
Peak Cement Successfully Enters Lancang Airport Project
News from our newspaper On September 26, the first batch of airport runway cement produced by Yunnan Jianfeng Cement Company was successfully delivered to the Lancang Airport site, which marked another important step in the expansion of Jianfeng Cement in the southwest Yunnan market. Lancang Airport is located in Donghi Town, Lancang Lahu Autonomous County, Pu'er City. It is the center of the "three counties" and "Pu'er Green Triangle" tourist areas of Lancang, Menglian and Ximeng, with a wide range of radiation and obvious location advantages. The project is a national "Twelfth Five-Year Plan" construction project and a key construction project in Yunnan Province. It was approved by the State Council and the Central Military Commission in January 2013. It started construction at the end of November 2014 and is expected to be completed in April 2017. The current project of Lancang Airport is designed to meet the target of 250000 passenger throughput and 750 tons of cargo throughput by 2020, including the construction of a 2600-meter-long and 45-meter-wide runway, the construction of a new 3000-square-meter terminal building and 4 apron parking spaces, including communication, navigation, lighting, meteorology and other supporting projects. The total investment of the project is 1.533 billion yuan. Upon completion, it can be used for Boeing 737 series, Airbus A319 and A320 series, MA-60 and other passenger aircraft take off and land. Since the start of the Lancang Airport project, Yunnan Peak has listed it as an important goal to strive. Compared with ordinary cement, special cement for airport runways has the characteristics of small shrinkage, strong wear resistance, good frost resistance and low alkali content in addition to the requirements of ordinary 42.5 Portland cement. To this end, Yunnan peak in the project to strive for at the same time, the collection of technical forces to tackle the problem, in the clinker composition to determine, cooked.
2020
07-31
Jianfeng won the Zhejiang Industrial Award
A few days ago, we learned from the relevant departments of Zhejiang Province that the company won the 2016 "Zhejiang Industrial Award Silver Award". Zhejiang Industrial Award was established in 2014 and is selected every two years. The purpose of carrying out the selection and commendation of the Zhejiang Industrial Awards is to thoroughly implement the "August 8 Strategy", comprehensively implement the innovation-driven development strategy, speed up the industrial transformation and upgrading with the "four for three" as the starting point, and commend the adherence to the scientific concept of development. adhere to industry, conscientiously fulfill social responsibilities, establish a modern enterprise system, and take a new road of industrialization with characteristics. The evaluation work is jointly organized and implemented by Zhejiang Industrial Economic Federation, Enterprise Federation, Entrepreneur Association, relevant provincial industry associations, municipal industrial economic federations, enterprise federations, entrepreneur associations, and relevant units. The award review committee is composed of relevant government departments, provincial "three committees", relevant provincial industry associations, and experts in industrial economy, management, finance, taxation, quality, environmental protection, safety, technology, and law, the participating enterprises are comprehensively evaluated from the aspects of industry demonstration role, scientific and technological innovation, economic benefits, resource utilization, environmental protection, brand strategy, product quality, production safety, social responsibility, enterprise management, human resources and so on. "The enterprises that have won the Zhejiang Industrial Award this time are all outstanding enterprises that have made significant contributions to the promotion of Zhejiang's economic development; they are all leading enterprises, backbone enterprises, and high-growth enterprises from different industries, representing the scale of Zhejiang's industrial development. The direction and leading spirit represent the highest level of Zhejiang's industrial development." According to the organizers related negative
2020
07-31
Peak Cement Successfully Enters Lancang Airport Project
News from our newspaper On September 26, the first batch of airport runway cement produced by Yunnan Jianfeng Cement Company was successfully delivered to the Lancang Airport site, which marked another important step in the expansion of Jianfeng Cement in the southwest Yunnan market. Lancang Airport is located in Donghi Town, Lancang Lahu Autonomous County, Pu'er City. It is the center of the "three counties" and "Pu'er Green Triangle" tourist areas of Lancang, Menglian and Ximeng, with a wide range of radiation and obvious location advantages. The project is a national "Twelfth Five-Year Plan" construction project and a key construction project in Yunnan Province. It was approved by the State Council and the Central Military Commission in January 2013. It started construction at the end of November 2014 and is expected to be completed in April 2017. The current project of Lancang Airport is designed to meet the target of 250000 passenger throughput and 750 tons of cargo throughput by 2020, including the construction of a 2600-meter-long and 45-meter-wide runway, the construction of a new 3000-square-meter terminal building and 4 apron parking spaces, including communication, navigation, lighting, meteorology and other supporting projects. The total investment of the project is 1.533 billion yuan. Upon completion, it can be used for Boeing 737 series, Airbus A319 and A320 series, MA-60 and other passenger aircraft take off and land. Since the start of the Lancang Airport project, Yunnan Peak has listed it as an important goal to strive. Compared with ordinary cement, special cement for airport runways has the characteristics of small shrinkage, strong wear resistance, good frost resistance and low alkali content in addition to the requirements of ordinary 42.5 Portland cement. To this end, Yunnan peak in the project to strive for at the same time, the collection of technical forces to tackle the problem, in the clinker composition to determine, cooked.
2020
07-31
Peak Cement Successfully Enters Lancang Airport Project
News from our newspaper On September 26, the first batch of airport runway cement produced by Yunnan Jianfeng Cement Company was successfully delivered to the Lancang Airport site, which marked another important step in the expansion of Jianfeng Cement in the southwest Yunnan market. Lancang Airport is located in Donghi Town, Lancang Lahu Autonomous County, Pu'er City. It is the center of the "three counties" and "Pu'er Green Triangle" tourist areas of Lancang, Menglian and Ximeng, with a wide range of radiation and obvious location advantages. The project is a national "Twelfth Five-Year Plan" construction project and a key construction project in Yunnan Province. It was approved by the State Council and the Central Military Commission in January 2013. It started construction at the end of November 2014 and is expected to be completed in April 2017. The current project of Lancang Airport is designed to meet the target of 250000 passenger throughput and 750 tons of cargo throughput by 2020, including the construction of a 2600-meter-long and 45-meter-wide runway, the construction of a new 3000-square-meter terminal building and 4 apron parking spaces, including communication, navigation, lighting, meteorology and other supporting projects. The total investment of the project is 1.533 billion yuan. Upon completion, it can be used for Boeing 737 series, Airbus A319 and A320 series, MA-60 and other passenger aircraft take off and land. Since the start of the Lancang Airport project, Yunnan Peak has listed it as an important goal to strive. Compared with ordinary cement, special cement for airport runways has the characteristics of small shrinkage, strong wear resistance, good frost resistance and low alkali content in addition to the requirements of ordinary 42.5 Portland cement. To this end, Yunnan peak in the project to strive for at the same time, the collection of technical forces to tackle the problem, in the clinker composition to determine, cooked.
2020
07-30
Peak two enterprises were commended
On September 23, the launching ceremony of the 2016 Jinhua Zhejiang Shopping Festival and the 2015 Jinhua Honest Enterprise Commendation Conference were held in the urban people's square. Jianfeng Group's Jinhua Jianfeng Pharmacy Chain Co., Ltd. and Zhejiang Jianfeng International Trade Co., Ltd. were commended.
2020
07-31