Pro 2014-023 (Announcement of 18th Resolution of 8th Jianfeng Group)
Release time:
2020-08-05
Stock Code: 600668 Stock Abbreviation: Jianfeng Group No.: Pro 2014-023
Bond Abbreviation: 13 Jianfeng 01 Bond Code: 122227
Zhejiang Jianfeng Group Co., Ltd.
18th Board of Directors Resolution Announcement
The board of directors and all directors of the company guarantee that the content of this announcement does not contain any False records, misleading statements or major omissions, and bear individual and joint responsibility for the authenticity, accuracy and completeness of its contents .
On August 14, 2014, Zhejiang Jianfeng Group Co., Ltd. issued a notice to convene the 18th meeting of the 8th Board of Directors by fax, e-mail, telephone and personal delivery. On August 25, 2014, the meeting was held as scheduled in the conference room of Jianfeng Building in Jinhua, Zhejiang. The meeting was presided over by Chairman Jiang Xiaomeng. Independent director Liu Jiajian entrusted independent director Zhang Yuyou to attend the meeting and vote due to a business trip. The remaining seven directors attended the meeting in person. The company's supervisors and senior management personnel attended the meeting as nonvoting delegates, which complied with the Company Law and the company's The relevant provisions of the Articles of Association are legal and valid. The meeting passed the following resolution:
1. passed the company's 2014 semi-annual report.
Voting result: 8 votes in favor, 0 votes against and 0 abstentions.
The 2. passed the proposal on the public issuance of corporate bonds (Phase II)
After deliberation and voting, the board of directors passed the proposal.
According to the Securities Regulatory License [2013] No. 595 and the "Proposal on the Issuance of Corporate Bonds" reviewed and approved by the company's first extraordinary general meeting of shareholders in 2013, combined with the company's actual capital needs, it is proposed to publicly issue Zhejiang Jianfeng Group Co., Ltd.'s 2013 corporate bonds (second phase) (the specific bond name is subject to the final confirmation of the relevant regulatory agency), with a total issuance of RMB 0.3 billion, the term of the bonds is 5 years (with the issuer's interest rate increase option and the investor's resale option at the end of the third year) , and all the proceeds are used to supplement working capital and are not given priority placement to the original shareholders. The company's board of directors will handle matters related to the company's current public issuance of corporate bonds in accordance with relevant laws and regulations, the requirements of the above-mentioned approval documents and the authorization of the company's shareholders meeting.
Voting result: 8 votes in favor, 0 votes against, 0 abstentions.
hereby announces
Zhejiang Jianfeng Group Co., Ltd.
Board of Directors
August 25, 2014
More information
Tianjin Flemish Company Donates Anti-epidemic Materials
On the morning of July 13, Tianjin Jianfeng Flanders Pharmaceutical Technology Development Co., Ltd. donated materials to the Tianjin Development Zone Charity Association to help the development zone community fight the epidemic.
2020
08-05
In late July, leaders of the group company Jiang Xiaomeng, Yu Jianhong, Chen Tianci and Qin Xuping visited subordinate enterprises separately and sent heatstroke prevention and cooling supplies to employees working under high temperature, urging everyone to pay attention to heatstroke prevention and cooling and safe production work to ensure good physical condition.
2020
08-05
On July 17 and 18, the Group's work analysis meeting for the first half of 2020 was held at the Peak Building of the Group's headquarters to summarize and review the work in the first half of the year and make arrangements for the work in the second half of the year.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-22
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-31