Concrete pouring
Release time:
2020-07-31
concrete pouring should comply with the corresponding construction specifications, special attention should be paid to:
1, concrete in the construction of water-absorbing objects involved in the corresponding treatment before pouring, in order to avoid concrete moisture absorption, affecting the quality of concrete.
2, concrete should be poured before the initial setting, and there can be no segregation phenomenon, if there is segregation phenomenon, should be re-mixing, before pouring, and pouring process should also avoid segregation phenomenon.
3. When pouring structures such as columns, a layer of 50-100mm cement mortar (the mix ratio is the same as that in concrete) shall be poured at the bottom to avoid honeycomb pitting.
4, concrete pouring, should be carried out in layers according to the structural requirements, with pouring and tamping.
5. The overall concrete pouring of general structures shall be carried out continuously as much as possible to avoid intermittent construction. In the initial stage after concrete pouring, the concrete shall be protected from vibration or impact.
7. When making cement floor, roof platform and other parts, attention should be paid to the plastering operation. Generally, it should be plastered many times until there is no bleeding on the surface, but dry powder should not be sprinkled and cured in time during the plastering process.
8. In order to prevent early cracks in road construction, attention should be paid to:
①. Under the condition of meeting the design grade of concrete, accurate measurement should be made, excessive cement should not be used, and the unit water consumption of concrete should be mastered to reduce the shrinkage of concrete.
②, do not use high-temperature cement, the cement temperature during site construction should be lower than 70 ℃. In summer construction, the pouring temperature of concrete should be reduced as much as possible, the operation time from the beginning of pouring to the completion of surface finishing should be shortened, and the concrete should be fully cured. Regardless of the circumstances and conditions, the temperature of the concrete mixture shall not exceed 35 ℃. During winter construction, the mixing time should be extended, and the discharge temperature should not be lower than 10 ℃. At the same time, after the construction of pavement concrete, the first three days of maintenance temperature should be maintained above 10 ℃, the next 7 days of maintenance temperature should be maintained above 5 ℃.
③. When using dry aggregate exposed to sunlight for a long time, water shall be fully sprinkled to cool down.
④, the top surface of the base should be fully wet before pouring concrete, or take waterproof measures.
⑤, concrete surface finishing process, to avoid direct sunlight, do not make the temperature rise and dry.
⑥. According to the strength development, master the appropriate time for plate cutting to prevent the concrete slab from breaking.
Peak Cement Implementation GB175-1999 Standard Strength Guarantee Value
| Product |
Strength Grade |
Compressive Strength Mpa |
Compressive Strength Mpa |
||
| 3d |
28d |
3d |
28d |
||
| silicate cement |
42.5R |
25.0 |
48.0 |
4.5 |
7.5 |
| 52.5 |
27.0 |
56.0 |
4.5 |
8.0 |
|
| Ordinary Silicate Cement |
32.5R |
18.0 |
40.0 |
4.0 |
6.5 |
| 42.5 |
20.0 |
48.0 |
4.0 |
7.5 |
|
42.5R |
23.0 |
48. | #
4.5 |
7.5 |
|
| 52.5 |
26.0 |
56.0 |
4.5 |
8.0 |
|
| Composite Cement |
32.5R |
18.0 |
40.0 |
4.0 |
6.5 |
More information
Peak re-listed China's top 100 cement production capacity Daye peak won the "smart factory leader"
On July 11-12, the 2022 China Cement Industry Summit and TOP100 Award Ceremony organized by China Cement Network, an authoritative media of China's cement industry, was held in Hangzhou. Jianfeng Group once again ranked among the top 100 cement clinker production capacity in China.
2022
08-04
On the afternoon of July 12, the party Committee of the group company held a special meeting attended by party Committee members, senior and middle-level management backbones, heads of grass-roots party organizations and all party members of the group headquarters to learn and convey the spirit of the 15th party congress of the communist party of China in Zhejiang province.
2022
07-24
On the morning of July 1, more than 40 members of the group's party committee, party members of various branches of the group headquarters, and party members of subordinate enterprise branches went to the Shuanglong Hydropower Station, the Red Education Base of Jinhua City, to receive party spirit and revolutionary tradition education.
2022
07-14
Vocational skill level identification examination!
On June 16 and 18, the theoretical and practical examinations for the determination of professional skill level in the peak pharmaceutical sector were held successively in Jinxi pharmaceutical factory. The independent identification of vocational skill level includes three occupations (types of work): pharmaceutical preparation worker, chemical inspector and organic synthesis worker, basically covering the main posts in the pharmaceutical sector, with a total of 125 employees signing up for the identification.
2022
06-21
On June 16, the Jianfeng Pharmaceutical Quality Research and Development Party Branch and the Jinhua Vocational Skills Management Service Center Party Branch held a signing ceremony in Jinxi Factory to establish a party building alliance.
2022
06-21
Jinhua Mayor Xing Zhihong to Peak Research
On the afternoon of June 1, Jinhua Mayor Xing Zhihong, Wucheng District Party Committee Secretary Gao Feng, District Mayor Hu Yuxian, and heads of the Municipal Economic and Information Bureau, Development and Reform Bureau and other departments went to the group headquarters to discuss and exchange with the leaders of the group company to understand the development of the enterprise. Solicit opinions and suggestions from enterprises on government work. After understanding the current business situation of the peak, Xing Zhihong pointed out that focus, follow the right path, frontier, steady, is the peak to long-term prosperity of the magic weapon, must continue to adhere.
2022
06-13