Yunnan Peak Replacing Kiln Tail Chimney
Release time:
2023-03-04
News from our newspaper # February 8 , with the completion of the welding of the last section of pipeline, the replacement of the kiln tail chimney of Yunnan Jianfeng Cement Company was successfully completed.
When Yunnan Peak inspected the steel plate of kiln tail chimney in November of 2022 , it was found that the thickness was reduced by 2-3 mm compared with that of 2021 , and it was necessary to replace it. In addition, according to the continuous 5 years of testing data analysis, it is found that the corrosion is weak below the inlet of the tail exhaust fan. In order to save costs, after discussion, it was decided that the replacement chimney should be replaced upward from , 25, 19 meters. For those below , 25, 21 meters, anti-corrosion treatment should be carried out during the next kiln shutdown to ensure that the service life matches the newly replaced part. After various understanding, in 2022
10, Yunnan Jianfeng determined the supplier and arrival time of the materials used for replacement through bidding, and worked out a set of construction plan through communication with the hoisting master and the construction team in the early stage: use 600 ton truck crane, and use the inner cylinder to hoist into the construction platform first when dismantling, after cutting 8 wire rope holes and fixing 4 wire ropes, the crane places the construction platform at 1 m below the required slit and fixes it firmly. The cutting can be lifted out. When installing a new chimney, the lowest construction platform is cut for splicing and welding, and so on. Since some iron plates are composite plates, 2.5 mm corrosion-resistant stainless steel plates are bonded to ordinary steel plates. In order to ensure that the stainless steel plates are not damaged, the old breathable cloth is used to be wound on the pressure roller of the plate bending machine for protection. Special lifting workpieces are used in the manufacturing process to ensure that the inner cylinder is not damaged. In order to ensure the welding quality, plates above 10 mm shall be beveled on one side. Each transverse seam and vertical seam shall be welded on both sides and each weld shall be inspected. Only after approval can the next section be hoisted and butted. According to the hoisting scheme, it is divided into 4 sections, and the hoisting weight and construction position corresponding to each section are calculated to control the length. 2 May 3 , the crane was assembled in the factory and dismantled in the afternoon of
4. Due to the difficulty of docking the old and new pipes, the deformation of the original pipe is large, and the docking time exceeds the expected time. For the sake of construction safety, Yunnan Jianfeng communicated with the construction unit and arranged a section of hanging every day to ensure the completion of welding before dark and the withdrawal of personnel. Finally, the replacement of all kiln tail chimneys was completed in the afternoon of . (Lou Xuxin)
More information
The company's vocational skill level independently identifies two new occupations
A few days ago, after the examination and approval of the Jinhua Municipal Bureau of Human Resources and Social Security, and reported to the Provincial Department of Human Resources and Social Security for examination and filing, Jianfeng Group's independent identification level of vocational skills was based on last year. Two new occupations (types of work) are chemical inspectors and organic synthesis workers.
2022
05-20
On May 12, Cai Xiaochun, deputy secretary of the Party group of Zhejiang Federation of industry and commerce, and his party visited Jianfeng group for investigation, visited Jinxi factory area of Jianfeng pharmaceutical factory and Jinxi internationalization project site, and had a discussion with Jiang Xiaomeng, chairman of the group company, Huang Jinlong, deputy general manager of the group company and general manager of the pharmaceutical company.
2022
05-20
On the afternoon of April 6, Jiang Xiaomeng, chairman of the group company, was invited to participate in the Jinhua News Client Financial Media Interview column "Night Talk of the Two Sessions", as a representative of the Jinhua Municipal People's Congress, to talk about suggestions for the future development of Jinhua enterprises. As the chairman of the Jinhua City Federation of Industry and Commerce, Jiang Xiaomeng has a personal experience of various problems encountered in the development of Jinhua enterprises. After careful investigation and full preparation, he put forward two proposals on strengthening the empowerment and allocation of production factors and further enhancing the market competitiveness of enterprises in our city and further promoting the compliance construction of private enterprises in our city and reducing the risk of enterprise operation. In the "two sessions night talk" interview, he put forward his own views on these two topics.
2022
04-12
Group Companies Commend 2021 Advanced
On the morning of January 26, the group company held the 2021 annual summary commendation meeting to review the work of the previous year, make arrangements for the work of 2022, sign the 2022 economic responsibility system with various professional companies and directly affiliated enterprises, and solemnly commend the 2021 advanced collectives and individuals.
2022
02-08
Group Company Convenes Workers' Representative and Trade Union Member Representative Conference
The group company held a representative meeting of staff representatives and trade union members, elected members of the eighth trade union committee and members of various special committees, and Shi Fu was elected chairman of the eighth trade union of the group trade union.
2022
02-08
The group company held an annual safety and environmental protection work conference to comprehensively summarize and review the safety and environmental protection work in 2021, make arrangements for the safety and environmental protection work in 2022, and sign the safety and environmental protection work responsibility system.
2022
02-08