Attending the Senior Two Parents' Meeting
Release time:
2022-09-14
Time flies, and in a twinkling another year's school season is ushered in. "scroll is sentimental like an old friend , morning faint sorrow and joy every blind date " , students say goodbye to a happy and carefree holiday in the golden autumn and September, and return to school to open a new chapter in life.
As in previous years, a week after the children returned to school, I had the honor to attend the parents' meeting and witnessed the growth of the children together. When I arrived at the school gate, parents had come one after another. We entered the campus together. There were simple exchanges along the way. The words were all eagerly looking forward to the children. When I came to the classroom, the child saw me and came to me quickly, his eyes full of joy. He took me to his seat, showed me his homework for the first week of school, and the following study arrangements. After that, he took me to visit his dormitory and enthusiastically helped other parents to guide me. Time is always in a hurry. In the blink of an eye, it is time for the parents' meeting. He took me to the school auditorium, moved the chair for me, and then helped the teacher to keep the class in order. With the passage of time, the parents' meeting was carried out in an orderly manner, and there was no need to mention the due commendation and representative speeches. Finally, the school leaders came to the stage to explain in detail the teaching plan for the second grade of senior high school, and also analyzed the admission situation of the college entrance examination over the years. Compared with the results of my children, this year can still be slightly higher than the admission line, which makes my hanging heart a little relieved.
The parents' meeting ended successfully. Although the children's performance on campus was not very good, after a baptism, they obviously became mature and sensible, and their initiative in all aspects of life and study improved a lot. Although he is not as good as other students, he has made great progress for himself. I can't help but be filled with emotion in my heart. Looking back on the child's school experience in the past few years, it is really twists and turns. In the early days, I went out to work for many years and neglected to accompany the child, which led to his extremely lack of initiative in life and study. When he encountered things, he called me and asked me. How to deal with it, never take the initiative to think, let alone communicate with others, only Nuo Nuo. After school, I stayed at home and played with my mobile phone. I didn't know how to organize my own things, and I wrote my homework so-so. I didn't listen to the class carefully. I even dozed off in class. As a result, my grades plummeted in the high school entrance examination and missed the Senior high school. I had to choose to repeat the third grade. After a year of remediation, he finally got into the Senior high school, for which I also paid more, not only materially and financially, but also spiritually. During that time, he often stayed up all night.
From this, I deeply realize that children cannot grow up without the company of their parents. As parents, we too often hope that our children will become dragons and our daughters will become phoenixes. We are eager for success, but we ignore the process of children's growth. In fact, every child is a seed of a flower. It is not that the flowers do not bloom, but that everyone has different flowering periods. Some flowers will bloom brilliantly from the beginning, while others will need a long wait. Don't look at other people's flowers in full bloom, and worry about your own one. We have to believe that as long as it is a flower, it will be in full bloom sooner or later. In the days of waiting, we must take care of him carefully, watch him grow up slowly, accompany him to bathe in the wind and rain, and experience the baptism of the years. If the seed has not moved, please don't worry, maybe he will be a towering tree in the future.
writer Long Yingtai has a passage that expresses the aspirations of many parents, "Children, I ask you to study hard, not because I want you to compare your grades with others, but because I hope you will have the right to choose in the future, choose meaningful and time-free work, instead of being forced to make a living. When your work is meaningful in your heart, you have a sense of accomplishment. When your job gives you time and does not deprive you of your life, you have dignity. Achievement and dignity give you happiness " . Senior one is the foundation, senior two is the key, senior three is the charge. Therefore, as a parent, in the next few days, I will support him and care about him with practical actions.
On the way to send me out of the campus, the child took the initiative to talk to me about the feelings of the parents' meeting, and also found out his own weaknesses. The English scores were too poor, and the follow-up will be more memorized, and then from other subjects Work hard to improve the overall results and work hard for the college entrance examination. Listening to his talk, I am sincerely gratified and encourage him to combine work and rest, participate in various activities organized by the school, improve himself in all aspects, and lay a good foundation for the future. At the same time, I also expressed my hope for him: I hope he can work hard and study hard with his own actions in the next 600 days, and strive for the right to choose his ideal school and major when he applies for the college entrance examination. I can also have the right to choose my ideal job and life when I graduate from university after 6 , in the future, the road of life will be wider and wider and farther.
(Quan Yaning)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30