We interned in the manufacturing department
Release time:
2022-06-13
In February this year, as a salesman of Huang Ping Jianfeng, I had the honor to study in the manufacturing department for a month. This month, I learned a lot of things that I didn't have contact with before. I knew nothing about cement before, and now I have a comprehensive understanding of cement technology and equipment maintenance, which has laid a good foundation for the development of marketing work.
This month, I mainly carried out rotation practice in various workshops. According to the arrangement, I have experienced cement mill system, new dry rotary kiln system and raw material system. As a member of the enterprise, we should first feel the corporate culture, familiar with the work process, adapt to the working atmosphere, followed by learning new knowledge, summing up work experience, and laying a good technical foundation.Most raw materials for cement production must pass through crushers and roller presses to achieve pre-homogenization (such as limestone, clay, iron ore and coal ash, etc.). Pre-homogenization technology pays attention to the storage and retrieval of raw materials, using scientific stacking and retrieval technology, so that the initial homogenization of raw materials. After I have a preliminary understanding of the raw material production process, the main time is spent in learning equipment maintenance with the monitor. During the overhaul, the colleagues involved in the overhaul were covered with ash or oil stains, but they still stuck to their posts, which moved me deeply. I am well aware of the importance of combining theory with practice. In my future work, I should integrate theory with practice. I should not only learn from books but also continue to consult my colleagues.
When practicing in the rotary kiln system, I often heard such a sentence at the kiln head: firing is the focus of the company, and the kiln head is the focus of firing. This is true. The quality of cement and the size of output depend to a certain extent on the operational skills of front-line colleagues. Usually in marketing, we need to explain the characteristics of cement to customers. Therefore, I often go to the scene to understand the specific production process of cement, and when I don't understand it, I modestly ask the responsible leader or the class leader for advice. Working with colleagues in the workshop, especially the night shift, although it is very hard, but looking at the results of everyone's efforts, I still feel very full.
I like Stalin's words very much: the most precious thing in life is life, what life needs most is study, the most pleasant thing in life is work, and the most important thing in life is friendship. The truly outstanding companies of the future will be organizations that manage to engage people at all levels and have the ability to learn continuously. It is never too old to learn, and the ocean of knowledge is vast. Only by continuous learning and enriching ourselves can we be based on a highly competitive society, make common progress with Jianfeng Group, and meet every challenge.
The sales department I work for not only needs to sell cement, but also is a representative of an enterprise. A successful sales is not an accidental story, it is the result of the learning plan and the application of a salesperson's knowledge and skills. In order to enrich the cement production experience, better sales,
3 6 , I entered the Huang Ping peak manufacturing department to learn the process of production. The purpose of this production practice is to understand the production process, production equipment and production organization structure of the factory. Through production practice, master the specific production process of cement materials, master the formation process of cement clinker, master the working principle and function of various production equipment, cultivate the ability of independent thinking and independent work, supplement knowledge for future sales work, and remain invincible in the same industry sales.
Through this internship, I got professional production labor training, with production practice knowledge, enhance the sales of production knowledge, more fully understand all the processes of cement clinker production, understand the various production measures and rules and regulations of the enterprise, and further cultivate the awareness of safe production. At the same time, it is better integrated into the big family of the peak, laying a more solid foundation for its own development.(Zhu Hongzhao)
4
February6 to 30 , I learned the production process and process of cement in the powder system, preheating system and calcination system of the manufacturing department, and learned about the functions and differences of relevant equipment.
During the study period, the personnel of the relevant departments of the manufacturing department conducted business-related production labor training for our sales staff, reserved production practice knowledge, enhanced the labor concept of our sales staff, and cultivated production practice skills. In the production labor, production technology education and query reading on-site data, we link theory with practice, in-depth understanding of cement production process, technical indicators, production equipment and technical operation, product quality and other related production management and technical level. At the same time, through on-site visits and studies, as well as on-site team explanations, we learned about the factory's production organization system, various production measures and rules and regulations of the factory.After nearly a month of production study, I have a deeper understanding of the knowledge of cement production, and a better understanding of the cement production process, production equipment and production organization. I put this knowledge and the production theory knowledge learned during the sales period, familiar with the specific production process of cement materials, master the formation process of cement raw material, the working principle and function of various production equipment, and lay a solid foundation for the follow-up business development.
(Chen Jianfei)
This month's study has given me an understanding of the cement process and a deep understanding of the hard work of my colleagues in the production department. With the hard work of front-line colleagues in the workshop and the linkage with other departments, the products can be promoted and our enterprise can flourish. Colleagues in the production line are the producers of the final products, and their hard work is incomparable to ours. I hope that through this study, I can grow rapidly, continue to work hard and strive to do better, and make more contributions to the development of Huang Ping Peak.
(Wu Yunqiao)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30