Editor's Note: In order to strengthen the marketing staff's mastery of relevant business skills such as cement production enterprise process, cement theoretical knowledge, enterprise quality control, cement quality inspection process operation, etc., at the beginning of the New Year, Huang Ping Jianfeng Cement Company arranged marketing staff to practice in production positions in batches and stages to understand the cement production process. At present, some salesmen have completed the internship of the manufacturing department and summarized their internship work. This paper excerpts a part for everyone to share and learn.
Through 15 days of internship in different positions in the cement production line, I have a further understanding of the cement production process. At the same time, but also clearly aware of their lack of knowledge of cement.
to the manufacturing department on-site work and study, the first thing is safety education and training, which requires our employees to firmly establish the idea of safety first in their daily work, correctly handle the relationship between safety and production, and ensure the safe production of enterprises. In these 15 days, the place I stayed most was the kiln system, followed by the raw material system. We have to continuously inspect the entire production line every day to eliminate potential safety hazards in time. Wear masks and earplugs in places with a lot of dust and noise to reduce the impact of dust and noise on health. Every time the patrol inspection finds that there is a problem with the equipment or cleans up the smoke room and coal pipes, it is necessary to contact the central control through the interphone in the first place, and the central control can only start the operation after shutting down the equipment.
What I have to do every day in the kiln system is to check the flap valves in each layer of the preheater to prevent material accumulation, and then assist colleagues to clean up the clinker particles leaked from the smoke room, the coal pipe at the kiln head and the kiln head. During the operation, although I was assisting on the side, my colleagues still asked me to obey their instructions, wear a complete set of fire-proof clothing, and do a good job of safety protection to prevent safety accidents.
When studying the raw material system, my colleague introduced me to a small skill, which is to judge whether the raw material is qualified or not by the temperature of the V powder selector. Because the high and low temperature represents the high and low of the integrated moisture of the grinding material, the two are inversely proportional to the relationship. It can also be found that the chemical composition and content of the material will directly affect the kiln calcination operation and yield.
clinker is a hydraulic cementitious substance containing calcium oxide, silica, alumina and iron oxide, which is ground into fine powder and fired into partial melting state according to appropriate proportion, and calcium silicate is taken as the main mineral component. The mineral composition of clinker mainly includes tricalcium silicate, dicalcium silicate, tricalcium aluminate and tetralcium aluminate. The mineral with the largest content is tricalcium silicate, followed by dicalcium silicate. Cement clinker in the kiln system formation process, according to the temperature and reaction can be roughly divided into drying, preheating, firing and cooling. The six-stage preheater used by Huangping Peak can make better use of the waste heat of the waste gas discharged from the kiln and the decomposition furnace to heat the raw material, and the gas-solid dispersion is uniform, the heat exchange is rapid and the high energy separation is high, which improves the heat exchange efficiency between the gas and solid to a greater extent, and realizes the superiority, high yield and low consumption of the whole calcination system. The raw material enters the preheater from the raw material warehouse for preheating and decomposition, and then enters the kiln for calcination. After calcination, the clinker enters the fourth-generation grate cooler. Grate cooler is mainly to reduce the clinker temperature, and the role of the heat contained in the clinker for multiple use, while the heat in the form of secondary air, tertiary air return to the kiln, preheater and waste heat power generation system. Finally, the qualified clinker is transported to the clinker warehouse through the clinker inclined zipper.
After a short follow-up study, I not only buried the "seed " for safe production, but also got a preliminary understanding of the role of common raw materials in the cement production process. Only by laying a good foundation and communicating in the same industry, can we not get stage fright because we do not understand the use of equipment and the role of various raw materials, and have more communication with customers in the front line of the market. If I want to do a good job in cement business, I also need to be more proficient in cement knowledge and marketing knowledge, and dare to innovate, constantly improve my business skills, and be a qualified salesman. (Chen Jianfei)
At the production site, the most is the production equipment, and the most important thing to pay attention to is the mechanical injury. Before the equipment is turned on, the central control room will definitely notify the on-site inspection personnel to carry out detailed inspection on the site to confirm that no one can turn on the mechanical parts and belt conveyor on the site. There are large pieces of material and other abnormal conditions on site, which need to be dredged manually. The first thing to do is to notify the central control room to stop the equipment to prevent problems before they occur. When working, we should wear masks, protective clothing and earplugs for noisy equipment. When cleaning up the smoke room, there must be two or more people present, wearing fire-proof clothing, fire-proof caps and fire-proof covers, and there will be other on-site personnel to assist to ensure the safety of the operators.
During the two months of studying in the manufacturing department, I have a more comprehensive understanding of limestone mining, raw material crushing and pre-homogenization, raw material grinding, raw material homogenization, clinker calcination and cooling, cement powder, cement storage and homogenization, cement shipping and other processes. The site of the manufacturing department is roughly divided into five systems: raw meal, kiln, coal mill, cement mill and waste heat power generation. In addition to waste heat power generation, I have studied the inspection post of each system for a week, and have a better understanding of the production process and equipment of each system, as well as the matters needing attention in the usual inspection.
The two-month period is very short. Although it is a bit hard, in general, the harvest is far greater than the effort, and it also makes me realize many simple and simple truths. Every department and every post is indispensable, and no one can be careless, otherwise it will affect the work of the entire production line and the quality of the products. It also made me understand that only when production and sales cooperate with each other can enterprises produce and operate better. The study in the manufacturing department not only gave me a better understanding of the cement production process and cement professional knowledge, but also made me understand that in my new position, I must ask and learn more. Only by working with curiosity can I learn more knowledge. After that, I will continue to strengthen my study of cement production process and professional knowledge. Although I am a marketing position, it is difficult for me to establish a foothold in this industry without a solid foundation and a studious attitude.
(Yang Wentao)
The most important thing in the production workshop is to protect my own safety, so on the first day I entered the workshop to study, I first conducted level 3 safety education, training and examination. After entering the site, I started from the most basic job position, that is, the feeding position, which is mainly responsible for the normal feeding of raw materials and the inspection and dredging of clay belts and iron slag feeding ports. Most of my time is spent in clay feeding ports, iron powder weighing, clay belt heads and other places where materials are easy to accumulate. For me, who has never worked night shift, working all night has become the first big test. Every time after 2 in the morning, my eyes begin to strike. Neither drinking coffee nor washing my face can wake up my body. I remember one time when I was preparing to rest after cleaning the clay blanking port, I received a notice that the sandstone crusher was full of rubble. so at 2: 50 in the early morning, we started the cleaning work. because the construction space was relatively narrow, the dust all over the sky accompanied me for 2 hours of cleaning work, which was deeply imprinted in my memory. I was tired, hungry and sleepy, you can fall asleep almost anywhere.
In the first week of studying in the manufacturing department, I mainly experienced the work of the feeding post and learned the raw materials of the stacking shed. In the second week, I moved to the inspection post of the raw material system, mainly inspecting the normal operation of all equipment in the raw material system. When I followed the post worker to inspect together, he introduced the equipment and their operation principle to me in detail. In the third week, I went to the kiln system, which is the most critical part of cement production, and cleaned the crust in the smoke chamber and the accumulated material in the coal injection pipe at fixed points every day. In order to prevent injuries, protective measures need to be taken during work. After wearing fire-proof clothing and fire-proof cap, you can carry out high-pressure water gun skinning with the post worker. The daily inspection work is running in the preheater, which is as high as ,120 meters. Each floor swings the flap valve to prevent the flap valve from being stuck. At that time, I was also punished for not reporting to my superiors because the flap valve on the fourth floor was stuck. The fourth week is the last step into the cement production process - cement mill system study.
Through nearly two months of study in the manufacturing department, I have a better understanding of cement-related knowledge, but this is far from enough. If I want to be a qualified marketing personnel, I still need to enrich myself through continuous learning.
(Liu Chen Qian)
More information
Peak health marketing and a new "play"
Building a New System, Flattening Management, Spike Health Marketing, New "Way to Work" On February 17, Spike Health Technology Company held a sales meeting to integrate and adjust the construction of a new marketing system and deploy and implement the 2017 sales work. Chen Daiyou, general manager of Health Technology Company, carefully explained and answered the marketing system construction and sales management assessment methods at the meeting, and reached a consensus on unifying thinking. The sales business of Health Technology Company involves three categories: health care products, plant extracts and Chinese herbal pieces. The product attributes and categories are different, and the product sales channels are diversified. In order to facilitate market expansion and adapt to the rapid response to market changes, the Company focuses on key products, key channels and key markets, adjusts the original business model, unifies all sales businesses of the Company, establishes a marketing center, and centralizes and unifies flat management. At the meeting, the Health Technology Company issued the "2017 Sales Management Assessment Measures", which takes sales performance as the leading factor, defines the sales staff's business expenses and market expansion support policies, implements quarterly and annual assessment of sales targets, and directly links the assessment of the progress of sales staff's target tasks with monthly income. After two-way selection, adjustment and implementation of sales positions and target tasks, all sales staff of Health Technology Company have signed a sales economic responsibility system. Chen Daiyou hopes that marketers will build confidence to meet the challenges and grow and progress together with the enterprise. At the same time, he said that the health technology company will focus on strengthening the construction and cultivation of the sales team, and carry out training, learning and experience sharing in various ways, so as to improve the business ability and level of the sales team. (Spike Health)
2020
07-30
2020
07-30
2020
07-31
2020
07-31
On January 23, the group company held a special working meeting to summarize the safety and environmental protection work in 2016 and make arrangements for the work in the new year. General manager Yu Jianhong pointed out at the meeting that hidden dangers are accidents, accidents should be assessed, and safety and environmental protection work should continue to be carried out with a "zero tolerance" attitude. At the meeting, Chen Tianci, assistant to the general manager of the group company and manager of the audit performance management department, summarized the safety and environmental protection work in 2016 from the aspects of the completion of the safety and environmental protection responsibility system objectives, self-examination and self-correction of illegal operations, and the establishment of safety and environmental protection accident-free factories, analyzed the problems existing in the work, and put forward the safety and environmental protection work plan for 2017 in a targeted manner. Jiang Xiaomeng, chairman of the group company, stressed at the meeting that the work of safety and environmental protection is endless and must be carried out unremittingly. All enterprises should focus on safety and environmental protection management in a planned and focused manner according to the characteristics of their respective industries and industries, seasonal changes, and national policy adjustments. It is more important to establish awareness than inspection. It is necessary to strengthen safety and environmental protection education and improve the safety and environmental protection awareness and related work skills of all employees. Conduct in-depth pre-inspection and strict post-assessment to achieve full management and comprehensive prevention, and realize the overall improvement of enterprise safety and environmental protection. At the meeting, Jiang Xiaomeng, on behalf of the group company, signed the 2017 safety and environmental protection work responsibility letter with various professional companies and directly affiliated enterprises. In his concluding speech, Yu Jianhong, general manager of the group company, pointed out that safety runs through the development of the enterprise, and safety and environmental protection cannot be separated from production and operation. The two promote each other and complement each other, and managers at all levels must have a deep level of this.
2020
07-31
"Spike" Cement Becomes Yunnan Famous Brand Product
News from our newspaper At the beginning of the new year, good news came from Yunnan Jianfeng Cement Company. The "Jianfeng" brand cement successfully passed the examination and approval and won the title of "Yunnan Famous Brand Product. Since it was put into production in 2013, the "Jianfeng" brand cement produced by Yunnan Jianfeng has won good sales performance and reputation in the southwest Yunnan market, and its popularity and brand influence have been continuously improved. Therefore, Yunnan Jianfeng started to declare "famous brand products" in 2016. After preliminary data preparation, preliminary examination by Pu'er Municipal Bureau of Quality and Technical Supervision, expert review by Yunnan Provincial Bureau of Quality and Technical Supervision and on-site verification, Yunnan Provincial Bureau of Quality and Technical Supervision finally passed the examination and approval of "Yunnan Famous Brand Products" organized by Yunnan Provincial Strategic Leading Group for Implementing Brand and Strong Quality Province in 2017. The acquisition of this honorary title will further enhance the market competitiveness of Jianfeng Cement in southwestern Yunnan, and also increase the popularity of Yunnan Jianfeng, laying a more solid foundation for further market development in the future. (Li Chun)
2020
07-31