The group company held an annual safety and environmental protection work conference and proposed to establish the concept of "every team leader is the first responsible person for safety"
Release time:
2022-02-08
27 , the group company held an annual safety and environmental protection work conference to comprehensively summarize and review the safety and environmental protection work in 2021 , make arrangements for the safety and environmental protection work in 2022 , and sign a responsibility system for safety and environmental protection work. 2021
, around the safety target responsibility system, the company's enterprises conscientiously carried out management activities such as eliminating hidden dangers of accidents, managing the on-site environment, carrying out staff training, and opposing illegal operations, implementing various safety management responsibilities, and doing a lot of work in safety and environmental protection. In addition to daily safety management, focus on the implementation of the three-year action plan for on-site governance to further promote the in-depth development of safety risk analysis and control; strengthen daily safety and environmental protection inspections, and timely discover and rectify safety and environmental hazards; carry out a two-month employee operation safety Education, on-site teaching, and on-site assessment to improve employees' ability to discover, correct, and prevent violations. In the whole year, there were no work-related accidents and no fire accidents with direct economic losses of 300,000 yuan. The work-related accident rate was0.48% , which was controlled within the requirements of the group company's safety internal control index 0.5% . The meeting of
focused on the development of safety and environmental protection supervision and management in2021 , and reported on the operation and existing problems of safety standardization, safety and environmental protection facilities of various units, as well as the assessment of personal safety risk funds of management personnel. The safety accidents occurred in the subordinate enterprises of the company during the year were reported, the promotion of safety risk analysis and control work is analyzed, and the relevant units and responsible persons are assessed.
The five-year second round of"Safety and Environmental Protection Accident-Free Factory " creation activities ended in 2021 , and the meeting gave a briefing on the creation. On behalf of the company, Yu Jianhong, general manager of the group company, presented awards to pharmaceutical companies, pharmaceutical factories, pharmaceutical companies headquarters (including headquarters, large pharmacies, pharmaceutical companies) and health technology companies 3 assessment units that met the standards of safety, environmental protection and accident-free factories in 2021 .
Chairman Jiang Xiaomeng, on behalf of the group company, signed the2022 safety and environmental protection responsibility system with professional companies and directly affiliated enterprises.
Jiang Xiaomeng pointed out in his speech at the meeting that safety and environmental protection management should have systematic thinking, with both clear responsibilities and serious discipline, and both safety responsibilities and safety supervision. That is, on the basis of a clear responsibility system, establish the concept of"every team leader is the first responsible person for safety " ; With serious discipline as a guarantee, establish a strict accountability mechanism; To strengthen on-site management as the basic means, at the same time strengthen the investment in safety facilities; Strengthen supervision through strict self-examination, mutual inspection and regular inspection to eliminate loopholes in safety management. Jiang Xiaomeng stressed that safety is no small matter and there should be no fluke. We should take every problem in the production process seriously, ensure safe production without accidents, and strive for a good start in the first quarter of 2022 .
Chen Tianci, chairman of the board of supervisors in charge of safety, analyzed and reflected on the problems in safety and environmental protection management in the previous year. He pointed out that from the overall situation of safety and environmental protection work in2021 , the number of accidents increased year on year, the phenomenon of "three violations " has risen, there is a situation of emphasizing inspection and neglecting rectification in daily management, and individual enterprises do not have a good understanding of safety management. In future work, the company will strengthen system construction, to comprehensively revise the standardization system of safety and environmental protection management; To focus on risk prevention and control, strengthen hidden danger investigation and risk analysis, the "anti-violation 50 " regular and institutionalized training; To strengthen the management of safety and environmental protection management responsibility book, management responsibility layer by layer decomposition and implementation in place; While continuing to carry out the construction of safety and environmental protection accident-free factories, we will summarize and analyze the development of the previous eight years, revise and improve the standards and methods, so that this work can achieve better results. Yu Jianhong, deputy director and general manager of the safety Committee of
group company, pointed out in the concluding speech of the meeting that in order to put an end to safety and environmental protection accidents, it is necessary to seriously reflect on the defects in management, pay special attention to daily inspection, risk assessment and employee behavior norms, so that employees can establish the awareness of"safety accidents dare not commit " ; To further improve safety prevention facilities and improve the safety factor, efforts should be made to create jobs and places where "safety accidents cannot commit " ; Training should be strengthened to further improve the safety prevention skills of all employees so that they can have the ability of "safety accidents will not commit " . For this reason, in the future work, it is necessary to strengthen the publicity of laws and regulations, work responsibilities, and accident hazards, and effectively brand the awareness of safety responsibility in the hearts of every employee; it is necessary to improve the system construction to ensure feasibility and standardization, so that The system can truly have the role of ensuring the safety of employees and production facilities; through strong supervision, pay close attention to the safety management system "landing " , really in place; Efforts should be made to improve the safety quality of all staff, especially the safety quality of leading cadres, safety and environmental protection management personnel and project leaders, so that each operation unit can carry out its work in a safe and standardized manner. Yu Jianhong emphasized that only when safety is achieved can the development of the enterprise be effective. All units of the company should carefully examine themselves, find out and fill vacancies in daily work, and provide safety guarantees for the development of various tasks. 
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30