The company's internal trainers are assembled in place.
Release time:
2020-09-11
and general manager led
senior and middle-level managers to gather internal trainers in
company
. the list of internal trainers in group company was released a few days ago. 94 people including chairman Jiang Xiaomeng and general manager Yu Jianhong were employed as internal trainers in the company, the appointment period starts from 2020 9 April 1 for a period of two years.
The company's internal trainer team is established to accelerate the construction of the talent team, realize the accumulation and inheritance of corporate capabilities and experience, and aim at the shortcomings of the company's employees' work capabilities and training needs. It aims to realize the internal trainer team The standardization of management meets the needs of employee training at all levels of the company, while ensuring the smooth implementation of the company's strategic development, and enhancing the pertinence and effectiveness of employee training, truly help employees to improve work efficiency and performance. The first batch of 94 internal trainers, according to the company's "internal trainer team construction and management measures", through personal self-recommendation, unit recommendation, qualification examination and other basic procedures, from the group company within the scope of formal labor relations (or labor dispatch personnel), it is selected from employees with intermediate or above professional titles, second-level (technician) or above professional qualifications, and third-level or above qualifications (one of the three). According to the different training contents, internal trainers are divided into two categories: general category and professional category (skill category), of which the general category is mainly management courses, and the professional category (skill category) is mainly technical courses related to various industries.
It is understood that general trainers are determined by the group company, and professional (skill) trainers are determined by various professional companies and directly affiliated enterprises, and reported to the group company for the record. The selected personnel shall be listed by the group company and shall be appointed by each unit for two years. The company will train and improve the selected internal trainers in terms of expression ability and methods, curriculum and teaching materials compilation methods, teaching arrangement and implementation, so as to better carry out all kinds of training. During the appointment period, the internal trainer needs to prepare and develop the corresponding course teaching materials, teach not less than six hours or two training hours per year, and decide whether to continue the appointment according to the results after being "qualified" by the satisfaction survey of the trainees and assessed by the unit where they work. (Reporter)
Attached: List of Internal Trainers of Jianfeng Group
Group Headquarters
General Category: Jiang Xiaomeng, Yu Jianhong, Xiang Chongping, Chen Tianci, Lan Xiaolong, Yang Yihu, Ye Haiyun, Fu Yiwu, Tang Zhengren, Xu Haijin, Li Xiaoyin
Professional Category: Chi Lifan, Zhong Lijie
Peak Pharmaceutical Company
General Category: Golden Dragon, Shen Quan, Pang Xiong, Jin Huazhong, Jiang Hong, Gong Xiliang, Zheng Kunwu, Song Shijie, Zhang Dongdong, Lu Xianhui, Zhang Jinhui, Kang Litao, Lou Xiaohua, Li Qian
Professional Category: Shi Cunyuan, Lin Jun, Pan Xujun, Zhang Lingling, Ye Yingqiao, Xu Lizhen, Liu Bin, Ye Congcong, Lou Jianfeng, Su Yuzhen, Wang Liqin, Li Xiang, Lu Jiangang, Wang Xiazhong, Yang Xinfeng, Wang Yingmin, Fang Ling, Zhu Guoping, Yao Shucheng, Zhang Naihua, Xu Yuting, Fang Wentong, Xu Yexianzhong, Jiang, Wu Cement
Generic class:
Zhang Fengliang, Yuan Xianming, Shi Fu, Wu Xinqiong, Cao Kaiqiang, Wang Yuhua, Jing Fangzheng
Professional:Tao Yecheng, Wang Tao, Liu Chao, Fan Liangwu, Jiang Binhui
Yunnan Jianfeng Cement CompanyGeneral Category:
Zhou Jiping, Fang Xuhua, Zhao Yuqian, Su Dabin, Liu Fengbin
Professional Category:Liu Shenghua, Lou Xuxin, Song Xiaofei, Zhu Jianfeng, Li Chun, Hu Chuanli, Chen Weichun, Ma Yufu
Guizhou Huang Ping Jianfeng Cement CompanyGeneral Class:
Hu Hongwei, Zhu Yong, Wang Zhijian
Professional Class:Lu Hongzheng
Jianfeng Health Technology CompanyGeneral Class:
Chen Daiyou, Jin Wenwei
Professional Category:Yin Zhiwu, Li Wende, Lu Guosheng, Zhao Chunquan, Yang Hao, Chen Anping
Peak International Trading CompanyProfessional Category:
th Floor Chunming, Fang Zhangli
Peak Communication Cable CompanyGeneral Category:
Zhang Ci
Professional Category:Hu Longgang, Lu Chaofang
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30