Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project
Completion Environmental Protection Acceptance Publicity
According to the requirements of Interim Measures for Environmental Protection Acceptance of Construction Project Completion (National Environmental Planning and Environmental Assessment [2017] No. 4 ) of the Ministry of Environmental Protection,
The environmental protection acceptance information of "Kiln End Flue Gas Desulfurization Project" of daye Jianfeng Cement Co., Ltd. is now publicized. Basic Information of
1. Project
Project Name: Kiln End Flue Gas Desulfurization Project
Project Construction Unit: Daye Jianfeng Cement Co., Ltd.
Project Construction Location: Yongguang Village, Baoan Town, daye city, nature of
Project in the existing factory area of daye Jianfeng Cement Co., Ltd: the construction content of the technical renovation
project is as follows:
This technical renovation project is mainly to build a wet desulfurization system for the kiln tail flue gas of the company's existing daily production 4000t cement clinker production line, adopting limestone - gypsum wet flue gas desulfurization process. The project covers a total area of 500m 2 , with a new construction area of about 450 m 2 . It mainly builds desulfurization complex building, flue gas system, SO 2 absorption system, limestone powder conveying and limestone slurry preparation system, process water system, gypsum dehydration system and supporting pipelines, etc. Power supply, water supply, compressed air and other public works rely on the existing plant.
Project Total Investment and Environmental Protection Investment: The total investment of the project is 1037 Yuan , all of which are environmental protection investment. The
project was commissioned by Huangshi Changjiang Environmental Engineering Design Institute to conduct an environmental impact assessment on 2017 9 . On 2017 11 16 , daye city Environmental Protection Bureau approved the document No.78 [2017]354 .
Implementation of 2. Environmental Protection Measures
The scope of this acceptance is Kiln End Flue Gas Desulfurization System and Supporting Facilities .
(1) Exhaust Gas Pollution Prevention Measures
Project Organized Exhaust Gas Emission Main Pollutants are SO 2 ; The main pollutant of unorganized exhaust gas emission is dust. In the
slurry preparation system, the processes of transportation, feeding, ash separation and silo are fully enclosed, and the pulping process is equipped with ash and dehumidification devices. The SO 2 in the waste gas of the rotary kiln is treated by limestone - gypsum method and discharged from the 110m high chimney at high altitude; the emission concentration of SO 2 and unorganized dust can meet the emission limit requirements of (GB4915-2013 ) "Comprehensive Emission Standard for Air Pollutants in Cement Industry.
(2) Water Environment Pollution Prevention and Control Measures
Project Drainage is divided into rain and sewage, and rainwater ditches (cement hardening) are set up. Rainwater at the project site enters the existing rainwater system in the plant area. Drainage ditches and water collecting tanks are built, equipped with cyclone machines and filtrate collection tanks. The wastewater is collected by the water collecting tanks and recycled for production without external discharge; A 570m 3 accident slurry tank has been built. The slurry discharged from the absorption tower during the accident will be collected in the accident slurry tank and recycled to the absorption tower without being discharged outside, thus having little impact on the outside world.
(3) noise prevention measures
project noise mainly comes from production equipment such as fans and water pumps, equipment is low noise equipment; The fans and pumps are all placed in closed compartments, and measures such as vibration reduction, noise elimination and distance attenuation are taken.
(4) Solid Waste Pollution Prevention Measures
The solid wastes discharged during the operation period of the project are mainly domestic garbage and desulfurization gypsum. A standardized temporary storage room for solid waste is built on the first floor of the desulfurization station. The dehydrated gypsum is collected by the temporary storage room and regularly transported to the gypsum storage yard in the plant area. As raw material, it enters the cement mill and is not discharged. Domestic waste is uniformly removed and transported by the local environmental protection department for centralized treatment.
3. Acceptance Survey Results
(I) Construction Period
During the construction period, various environmental protection measures were implemented with little impact on the surrounding environment.
(II) operation period
1 , acceptance monitoring condition
acceptance monitoring period (2019 3 July 21-22 ; 2019 172 5 March 27-28 ), the project is operating normally, design and production of cement 4000t/d ; The actual 3 September 21-22 day, 5 March 27-28 day production load all reached above 82% of , the completion acceptance monitoring condition was greater than 75% of , and the monitoring data were valid.
and Waste Gas
3 monitoring points were set up at the factory boundary to monitor the unorganized particulate matter emitted by the project for two days. The maximum concentration of unorganized particulate matter emitted from the factory boundary is lower than 0.5 mg/m 3 , does not exceed the unorganized emission limit of in table of "cement industry comprehensive emission standard for air pollutants " (GB 4915-2013 ).
During this acceptance monitoring period, SO 219 in the inlet and outlet exhaust gas of the desulfurization tower at the end of the rotary kiln was monitored. The monitoring results show that the average desulfurization efficiency of the desulfurization tower at the end of the rotary kiln reaches above 91% in the desulfurization 223. in the exhaust gas at the outlet of the exhaust pipe
More information
The company organized "charity one day donation"
On the morning of October 22, in the lobby on the first floor of Jianfeng Building, all cadres and employees of the group headquarters and subordinate enterprises working in Jianfeng Building participated in the 2021 "Charity Day Donation" activity to offer their love to Jinhua charity. In the next few days, the company's subordinate enterprises also organized "charity one-day donation" activities one after another.
2021
11-01
The company organizes new employee induction training
"Growth is more important than success. I hope everyone can become the backbone and pillars of the peak as soon as possible." On September 2, Yu Jianhong, general manager of the group company, put forward ardent hopes in the face of new employees. On the 2nd and 3rd, the group company organized induction training for new employees recruited in the past year. The group company chairman Jiang Xiaomeng, general manager Yu Jianhong and other leaders and relevant department heads gave lectures to them.
2021
09-13
Daye Peak: Typical Regional Industrial Green Development
On August 23, Huangshi Radio and Television Station broadcast the special program of "Strengthening Overall Planning and Promoting Energy Saving and Emission Reduction in Industrial Field". Daye Jianfeng Cement Company, as a typical enterprise with outstanding achievements in establishing green factories and energy saving and emission reduction in Huangshi area, appeared in the program.
2021
09-01
Yunnan Peak Helps Border Epidemic Prevention and Control
On August 22, Yunnan Peak Cement Company, through the Red Cross Society of Pu'er City and the Epidemic Prevention Headquarters of Pu'er City, donated vacuum insulation pots with a total value of 800000 yuan to the four border counties for the prevention and control of the new coronary pneumonia epidemic in the border area, and supported the prevention and control of the epidemic at the border with practical actions.
2021
09-01
Group Party Committee to Learn "July 1" Important Speech
On August 13, the party committee of the group company held a special meeting to collectively study General Secretary Xi Jinping's important speech at the celebration meeting of the 100 anniversary of the founding of the Communist Party of China, convey the requirements of the party committee at a higher level, and make arrangements for organizing party members of the company to study the "July 1" speech.
2021
08-23
Spike Ranked 2020 China's Top 100 Cement Clinker Production Capacity
Recently, the company received the "2020 China Cement Clinker Production Capacity Top 100" plaque issued by China Cement Network. The ranking of China's top 100 cement clinker production capacity is organized and evaluated by China Cement Network, an authoritative information platform for the domestic cement industry. It is released according to the actual clinker production capacity of each cement enterprise at the end of last year. The company has been ranked in the top 100 list for many consecutive years.
2021
08-23