Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project Completion Environmental Protection Acceptance Publicity
Release time:
2020-07-31
Daye Jianfeng Cement Co., Ltd. Kiln End Flue Gas Desulfurization Project
Completion Environmental Protection Acceptance Publicity
According to the requirements of Interim Measures for Environmental Protection Acceptance of Construction Project Completion (National Environmental Planning and Environmental Assessment [2017] No. 4 ) of the Ministry of Environmental Protection,
The environmental protection acceptance information of "Kiln End Flue Gas Desulfurization Project" of daye Jianfeng Cement Co., Ltd. is now publicized. Basic Information of
1. Project
Project Name: Kiln End Flue Gas Desulfurization Project
Project Construction Unit: Daye Jianfeng Cement Co., Ltd.
Project Construction Location: Yongguang Village, Baoan Town, daye city, nature of
Project in the existing factory area of daye Jianfeng Cement Co., Ltd: the construction content of the technical renovation
project is as follows:
This technical renovation project is mainly to build a wet desulfurization system for the kiln tail flue gas of the company's existing daily production 4000t cement clinker production line, adopting limestone - gypsum wet flue gas desulfurization process. The project covers a total area of 500m 2 , with a new construction area of about 450 m 2 . It mainly builds desulfurization complex building, flue gas system, SO 2 absorption system, limestone powder conveying and limestone slurry preparation system, process water system, gypsum dehydration system and supporting pipelines, etc. Power supply, water supply, compressed air and other public works rely on the existing plant.
Project Total Investment and Environmental Protection Investment: The total investment of the project is 1037 Yuan , all of which are environmental protection investment. The
project was commissioned by Huangshi Changjiang Environmental Engineering Design Institute to conduct an environmental impact assessment on 2017 9 . On 2017 11 16 , daye city Environmental Protection Bureau approved the document No.78 [2017]354 .
Implementation of 2. Environmental Protection Measures
The scope of this acceptance is Kiln End Flue Gas Desulfurization System and Supporting Facilities .
(1) Exhaust Gas Pollution Prevention Measures
Project Organized Exhaust Gas Emission Main Pollutants are SO 2 ; The main pollutant of unorganized exhaust gas emission is dust. In the
slurry preparation system, the processes of transportation, feeding, ash separation and silo are fully enclosed, and the pulping process is equipped with ash and dehumidification devices. The SO 2 in the waste gas of the rotary kiln is treated by limestone - gypsum method and discharged from the 110m high chimney at high altitude; the emission concentration of SO 2 and unorganized dust can meet the emission limit requirements of (GB4915-2013 ) "Comprehensive Emission Standard for Air Pollutants in Cement Industry.
(2) Water Environment Pollution Prevention and Control Measures
Project Drainage is divided into rain and sewage, and rainwater ditches (cement hardening) are set up. Rainwater at the project site enters the existing rainwater system in the plant area. Drainage ditches and water collecting tanks are built, equipped with cyclone machines and filtrate collection tanks. The wastewater is collected by the water collecting tanks and recycled for production without external discharge; A 570m 3 accident slurry tank has been built. The slurry discharged from the absorption tower during the accident will be collected in the accident slurry tank and recycled to the absorption tower without being discharged outside, thus having little impact on the outside world.
(3) noise prevention measures
project noise mainly comes from production equipment such as fans and water pumps, equipment is low noise equipment; The fans and pumps are all placed in closed compartments, and measures such as vibration reduction, noise elimination and distance attenuation are taken.
(4) Solid Waste Pollution Prevention Measures
The solid wastes discharged during the operation period of the project are mainly domestic garbage and desulfurization gypsum. A standardized temporary storage room for solid waste is built on the first floor of the desulfurization station. The dehydrated gypsum is collected by the temporary storage room and regularly transported to the gypsum storage yard in the plant area. As raw material, it enters the cement mill and is not discharged. Domestic waste is uniformly removed and transported by the local environmental protection department for centralized treatment.
3. Acceptance Survey Results
(I) Construction Period
During the construction period, various environmental protection measures were implemented with little impact on the surrounding environment.
(II) operation period
1 , acceptance monitoring condition
acceptance monitoring period (2019 3 July 21-22 ; 2019 172 5 March 27-28 ), the project is operating normally, design and production of cement 4000t/d ; The actual 3 September 21-22 day, 5 March 27-28 day production load all reached above 82% of , the completion acceptance monitoring condition was greater than 75% of , and the monitoring data were valid.
and Waste Gas
3 monitoring points were set up at the factory boundary to monitor the unorganized particulate matter emitted by the project for two days. The maximum concentration of unorganized particulate matter emitted from the factory boundary is lower than 0.5 mg/m 3 , does not exceed the unorganized emission limit of in table of "cement industry comprehensive emission standard for air pollutants " (GB 4915-2013 ).
During this acceptance monitoring period, SO 219 in the inlet and outlet exhaust gas of the desulfurization tower at the end of the rotary kiln was monitored. The monitoring results show that the average desulfurization efficiency of the desulfurization tower at the end of the rotary kiln reaches above 91% in the desulfurization 223. in the exhaust gas at the outlet of the exhaust pipe
More information
The company's vocational skill level self-identification training began.
After preparing the handout materials and question bank for the previous stage of vocational skill grade identification training, daye peak cement company conducted the vocational skill grade identification training for the machine repair team of the manufacturing department on August 10. On August 12 and 18, the pharmaceutical company also organized two phases of vocational skill level identification training for pharmaceutical preparation workers. According to the national skill level standard, the group company is divided into four grades: grade 5/junior worker, grade 4/intermediate worker, grade 3/senior worker and grade 2/technician. According to the analysis of employee registration, since there is only one type of job for pharmaceutical preparation workers, and cement production workers include cement central controller, cement quality inspector, cement clinker calciner, cement manufacturer, cement production inspection worker and other types of jobs, the number of applicants is less than that of cement production workers. Most of the employees who signed up were identified as participating in the four levels of vocational skills. According to preliminary statistics, there are now 155 employees who have signed up for their professional skill level, including 47 pharmaceutical preparation workers and 108 cement production workers. The human resources department of the group company is stepping up efforts to organize personnel to examine the qualifications of the employees whose registration grades are identified, and then enter the Zhejiang professional ability integration platform for formal registration after passing the examination. According to the national vocational skill standards and other content, each unit carries out targeted training for employees who participate in the independent identification of vocational skill levels. The training is conducted through on-site teaching, online teaching, and learning platform question bank exercises. After the training, the group company will organize the employees who participate in the grade identification to carry out examination and assessment, and those who pass the examination will complete the grade identification and issue the skill grade certificate. It is understood that in order to ensure the quality of vocational skill level identification, after the company was approved to independently identify the vocational skill level, the human resources department of the group organized all units to compile the question bank for various types of work in combination with the actual situation of the enterprise and with reference to the national vocational skill standards and training syllabus and other materials. after classification, unification and standardization, verification and proofreading, the preparation of the question bank has been basically completed. After being submitted to the superior unit for examination and approval, the company will import the question bank on the enterprise university platform to facilitate employees to prepare for the examination. The question bank for the independent identification of vocational skills level will also be extracted from the question banks of various industries, including professional ethics, basic knowledge, safety and environmental protection knowledge, laws and regulations knowledge, professional work practice and other national vocational skills standards. Basic requirements. The examination and assessment for independent determination of vocational skill level is tentatively scheduled for mid-September.
2021
08-23
Hu Guoyun, vice mayor of Pu'er, visited the peak
On July 16, a delegation led by Hu Guoyun, vice mayor of Pu'er City, Yunnan Province, and heads of Pu'er SASAC, Industrial Park Management Committee, Investment Promotion Bureau and other departments visited the headquarters of the group company. In the exchange with Jiang Xiaomeng, Yu Jianhong and other group leaders, Hu Guoyun expressed his gratitude to Jianfeng Group on behalf of the Pu'er Municipal Party Committee and Municipal Government. He said that the investment and entrepreneurship from Jianfeng to Pu'er not only promoted the development of Pu'er's regional industrial economy, but also made outstanding contributions to the local poverty alleviation. The two sides also exchanged and discussed issues such as strengthening in-depth cooperation between the two sides.
2021
07-21
Municipal SASAC Party Committee Visited Jianfeng Old Party Member
On June 28, Huang Zunhui, a second-level researcher of the State-owned Assets Supervision and Administration Commission of Jinhua City, visited Jianfeng Group and made a special trip to visit two retired party members, Chen Bingxiang and Yin Rongfu. Among the two Jianfeng veteran party members, Chen Bingxiang has been engaged in party affairs for nearly 30 years, and Yin Rongfu has won the honor of outstanding party members in Zhejiang Province and is a representative of Jianfeng party workers and party members. On behalf of the party committee of the Municipal State-owned assets Supervision and Administration Commission, Huang Zunhui expressed condolences to the two veteran party members, thanked the older generation of party members for their contributions, and exchanged views with Jiang Xiaomeng, secretary of the party committee and chairman of the group, and Qin Xuping, member of the party committee and chairman of the trade union, and fully affirmed the development of peak in recent years and the improvement of the level of party building work.
2021
07-12
"I'll teach you a lesson." Concluded successfully.
On the afternoon of June 24, as one of the highlights of the company's 2021 safety production month series of activities, the second phase of the "I'll give you a lesson" safety training was held at the group headquarters. the management personnel, production backbones and personnel from all departments and offices of the group gathered at the scene. foreign enterprises took safety "big lessons" through video, which was more effective than the teaching. At this point, the "I'll give you a lesson" safety training has come to a successful conclusion.
2021
07-12
Glory in the Party's 50-year-old Party Member Xi Ling Commemorative Medal
On June 23, the party committee of the group company sent a special person to visit and awarded the commemorative medals of "50 years of Glory in the Party" to six veteran party members. 2021 is the 100 anniversary of the founding of the Communist Party of China. For the first time, the Party Central Committee issued the "50 Years of Glory in the Party" commemorative medal to surviving party members who have reached the 50th anniversary of the party and have always performed well. The Organization Department of the Central Committee also specially issued the "Administrative Measures for the Issuance of Commemorative Medals of" Glory in the Party for 50 Years "", which stipulates the issuance procedures, issuance methods, production, and management of commemorative medals. In the future, the "50 Years of Glory in the Party" commemorative medal will be issued as a regular task and will be issued once every year around July 1.
2021
07-12
What is the exact time of the first Congress of the Communist Party of China? Which "big" representatives boarded the red boat in South Lake? What is the connection between the 1972 Sino-US Joint Communique and Hangzhou? On the morning of June 24th, the Party Committee of the Group Company invited members of the Party History Learning and Education Group of Zhejiang Provincial Party Committee and the vice president of Zhejiang Branch of China News Service to give a special party class of "returning to the scene of party history and reappearing the moment of party history" for the party members and cadres of the Company.
2021
07-01