Growing with the company.
Release time:
2020-07-22
Grows with the Company
Group Company 2018 Rookie Employee Peak International Trading Company Operation Department Zhang Ying
2016 10 8 , I came to Peak International Trading Company to work as a warehouse keeper, to be honest, I am full of confidence in my future work, because before that, I have eight years of factory warehouse management experience, familiar with the warehouse entry and exit process, good at the application of warehouse software, and quite experienced in data entry and statistics. The ordinary management of the warehouse is not difficult for me. In the first two months, everything went smoothly. I got used to it well. The volume of goods in and out of the warehouse was not large. I was in charge of receiving goods, system data entry, manual receipt and issue of goods, construction of goods cards, and part-time weightmen who collected the pounds. I worked very hard. With the arrival of the high-volume warehousing season at the end of the year, more and more goods are coming in and out of the warehouse, which is dozens of times more than usual. One person is simply too busy. The more lists are piled up, the more billing and data entry are too late, and the on-site management is simply not taken care. During that time, there were a lot of vehicles that came to weigh the pounds. I was too busy to touch the ground, but because of my lack of skills, I often cared about one thing and lost the other, and my work efficiency was extremely low. In view of this situation, the leaders decided to adjust the work content after research, and the forklift worker was also the tallyman, responsible for on-site management and the issuance of receipt and issue documents, which greatly reduced my work pressure and made my work much easier. However, the situation of not following the instructions and inconsistent accounts and goods still occurs from time to time. For this reason, I have a headache, but I have no good way to improve.
2017 7 , I was transferred to Xiaohuang village warehouse keeper. My colleagues in Xiaohuang Village Warehouse showed me what real warehouse management is. The supervisor requires that the warehouse must be checked every day, and the goods and cards must be checked and adjusted every day according to the instructions. The supervisor is an experienced person with excellent working ability. I have benefited a lot from learning from him. My colleagues are all serious and responsible people. I am also deeply affected. I check the warehouse one day at a time. I communicate with my colleagues in time when things happen, and consult the leaders in time when I don't understand. I made rapid progress during that period. In the account card production, data entry, customer audit, etc. from the supervisor to steal a lot. 2017 Xiaohuang Village Warehouse was rated as an advanced team for its excellent team work. Influenced by many outstanding colleagues, I reflected on my work. Before, I relied on my previous work experience, ignored the differences, and only stayed at the stage where I could do it, and my work efficiency was not high. After arriving in Xiaohuang Village, I realized that it is not enough to just be able to do it. I have to do it well. If I want to do it well, I must continue to learn to enrich myself and serve my work. Only by completing your own work efficiently and with good quality and quantity, and integrating into an excellent team, can you become an excellent member of the team.
2018 6 , I returned to the peak warehouse as a warehouse keeper. In a highly responsible attitude and adhering to the concept of serving customers, I perform the job responsibilities of a warehouse keeper to handle the entry and exit procedures for drivers who pick up and deliver goods, remind them of matters needing attention, and actively assist drivers who encounter problems in the process of picking up goods to solve various problems, reduce their waiting time, improve their satisfaction and reduce customer complaints. Adhere to the working concept of "finishing every day", enter the daily incoming and outgoing information into the U8 system in a timely and accurate manner, and make corresponding account and goods card registration; According to the actual work needs, make all kinds of statements and submit them to the competent leadership in a timely manner; Actively assist the finance department to collect loading fees and storage fees from drivers, and do a good job of registration and handing over; actively cooperate with customer service to do a good job in the transfer of goods, the right to transfer goods and customer audit... In the joint efforts of my colleagues in this department, the warehouse management has made great progress, the goods are stacked neatly and orderly, the warehouse is clean and tidy, and the accounts are clear and clear.
After work, in order to better complete the job and improve the professional level, in addition to taking part in the study courses of the enterprise university, I also bought Word word processing and Excel data processing related books to learn, so as to improve my form making level so as to use them efficiently in my work. In addition, I also modestly learn from the strengths of other colleagues, in order to make up for their own shortcomings, improve their own business level.
I have today's achievements, which cannot be separated from the training of the company and the influence of many outstanding colleagues in the company. It is precisely because an excellent platform has an excellent team, and I am in it, aware of my own shortcomings, study hard, and catch up, in order to become an excellent member of the team. Only by growing up with the company and making common progress can we meet a better self. I will continue to work hard and work hard. I hope that one day, I will change from a rookie employee to an excellent employee. (According to Zhang Ying's speech at the summary and commendation meeting of the group company)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30