An unexpected "storm"
Release time:
2020-07-22
An unexpected "storm"
2018 10# July 18 Early in the morning, I received a phone call from manager Zhou of the quality department of a major customer company, saying that the HYA53 cable produced by our company was sent to a well-known testing organization in Shanghai for testing, and many indicators of the product failed. Hearing the news, I was like a thunderbolt. For so many years, there has never been a third-party failure test for local telephone cables. Is the quality of our products really so poor this time? If it is true, then where is the reputation of our company, where is the integrity, and will customers still exist?
After the tension, I immediately asked what indicator was unqualified. The customer then sent me the unqualified items. I quickly looked at them and found that among the nearly 20 indicators, there were four unqualified indicators: resistance, capacitance, attenuation and near string. I immediately went to check the production and inspection records, and also asked the employees in charge of production and inspection. The records showed that the product indexes were qualified and the indexes were relatively large, and there was no abnormal situation in the production process. Resistance, capacitance and attenuation are all related to length. I immediately realized that this sample may be a problem with the test length.
So I asked the relevant personnel if there was any length deviation. The operator reflected that because he knew that this cable was a sample for testing, more than 2 meters were reserved at the inner and outer ends for testing the length of the wiring, and the length was written as 100 meters according to the customer's requirements. Therefore, the actual length of the cable should be about 105 meters. I immediately contacted the personnel of the testing organization and asked her to help check whether there was any length deviation. The next day I got a reply, the actual length is 105-107 meters, and the testing organization tests according to 100 meters on the certificate. The
detection mechanism said that the resistance and capacitance indexes were qualified after conversion by length, but the attenuation and near string indexes were still unqualified after conversion by length. I wondered, not knowing how to explain, and asked for the cable to be retested, but was refused. So I asked the testing agency to send me the original data of the test. The testing agency did not agree with my request. They said that there was no practice of retesting unqualified products, and there was no precedent for sending the original data to customers.
The testing agency does not agree to retest. There are only two options before us: one is to re-produce a cable to test and help the customer get a qualified test report; The second is to analyze the test data of the product to see if the test is wrong. If there is a mistake, we can appeal. For our customers, there is no doubt that the first choice is the best. We can get the test report as soon as possible and have an explanation. It is undoubtedly very difficult for the testing organization to provide the original data. However, our general manager Li didn't think so after knowing the situation. He said that if we send the products for inspection again, the inspection fee of more than 10,000 yuan is a trivial matter. The key is that customers will think that we are not qualified even in the sample line, so the products we supply them must be junk products at ordinary times. We will be regarded as dishonest suppliers, and problems may occur in future cooperation, losing our most important customer right now. Therefore, we must confirm whether our products are really problematic. It is a very important step for testing agencies to provide data. If handled well, it may turn bad things into good things.
was deadlocked for nearly two weeks. The customer was eager to use the test report and asked us to get the qualified report as soon as possible, and some doubts were revealed in the words. The production department rearranged the production of a sample line. The sales department contacted the major customers in Jiangsu and borrowed their authoritative US DCM equipment for testing. The comprehensive management department arranged a special car and I personally sent the products to Jiangsu for testing. One day a back and forth, in exchange for satisfactory full performance qualified test results, which makes us more confident in our products. Using this convincing data, and under the strong request of our customers, the testing organization finally sent us the original data. After getting the data, the relevant personnel of the company held a special meeting to analyze and study the data, and found that the testing organization applied the standard incorrectly and caused the wrong judgment. We wrote the relevant misunderstanding and sent it to the testing agency, and they finally approved our complaint and re-judged the product as qualified. After
, manager Zhou told me in wechat: "you are right. I believe in the quality of your products, because your leaders attach great importance to the quality of products, and your professional level is higher than that of the testing institutions!" I sent her a happy smile. An unexpected storm finally cleared the weather and turned a bad thing into a good thing. At this time, I found the sun is so warm and bright ...... (Lu Chaofang)
More information
Tianjin Flemish Company Donates Anti-epidemic Materials
On the morning of July 13, Tianjin Jianfeng Flanders Pharmaceutical Technology Development Co., Ltd. donated materials to the Tianjin Development Zone Charity Association to help the development zone community fight the epidemic.
2020
08-05
In late July, leaders of the group company Jiang Xiaomeng, Yu Jianhong, Chen Tianci and Qin Xuping visited subordinate enterprises separately and sent heatstroke prevention and cooling supplies to employees working under high temperature, urging everyone to pay attention to heatstroke prevention and cooling and safe production work to ensure good physical condition.
2020
08-05
On July 17 and 18, the Group's work analysis meeting for the first half of 2020 was held at the Peak Building of the Group's headquarters to summarize and review the work in the first half of the year and make arrangements for the work in the second half of the year.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer.
2020
08-05
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-22
The company requires to do a good job in summer safety production
The high temperature season is approaching, and the group company issued a notice a few days ago to make arrangements for safe production in summer. The notice requires all subordinate units of the company to attach great importance to the work of production safety in summer, and all production and business units should hold a special meeting on production safety in summer. According to the characteristics of production in summer, they should focus on safety risk analysis for mines, outdoor operations and high-temperature posts, and implement control measures to avoid the occurrence of safety accidents such as scalding, heatstroke and electric shock. In order to further strengthen the safety production management in the high temperature season, the notice requires the main person in charge of each production and business unit to lead a team to conduct a comprehensive inspection of the production and business premises according to the characteristics of summer production; strengthen the daily safety production inspection of key posts and special posts; timely rectify the found unsafe behaviors and hidden dangers; Strengthen the management of the storage and use of flammable, explosive, dangerous chemicals and drugs; cooling measures shall be taken for the space exceeding the storage temperature limit of articles. If it is found that the electrical equipment circuit and exhaust fan circuit are aged and damaged, replace them in time and keep the grounding wire in good condition. Do a good job in checking the fire pool, pipeline water pressure and fire extinguishing equipment to ensure that the fire fighting facilities are sensitive, intact and reliable. The high temperature in summer is also a period of frequent occurrence of heatstroke and other diseases. The notice requires all units to do a good job in heatstroke prevention and cooling, implement various relevant measures, and equip necessary cooling facilities or materials such as fans, air conditioners, ice cubes and other cooling facilities or materials according to the conditions of the production site; do a good job in the distribution of heatstroke prevention drugs, supplies and cool drinks in workshops, warehouses, construction sites and other production lines; strengthen canteen management to prevent food poisoning. (this newspaper reporter)
2020
07-31