I'm on the spike for thirty years
Release time:
2020-08-14
I stepped onto the stage as a representative of the old employee who served the peak for more than
years to receive souvenirs from the leaders of the group company at the peak 30 years 11 3 and the peak entrepreneurship 60 anniversary party. At that moment, my excitement was hard to express, and I also remembered the little things since I entered the peak.
I remember that it was 1988 8 28 . I stepped into the peak with excitement. After a week of training, I was assigned to the raw material workshop to fight back and break as a crushing worker. At that time, in the vertical kiln cement plant, because there was no large crusher, the particle size of limestone entering the crusher could not be greater than 30 cm, and those larger than the requirements must be crushed by the conveyor chain plate machine, thus having our type of work. Due to inexperience, after a shift, my two calves were full of wounds pierced and marked by splashed stone debris, and there was blood everywhere. It was miserable. Fortunately, under the careful guidance of the old master, after a few days of training and mastering the skills, the work will save more effort and less injuries.
Six months later, my efforts were recognized by the workshop management and I was transferred to the workshop maintenance team as a repairman. Under the leadership of the masters, I quickly mastered some basic knowledge of equipment maintenance, and was assigned to be a maintenance worker on duty in less than three months. At that time, there was a lot of equipment renovation and upgrading work in the factory, and the gold mud factory was preparing to apply for a national secondary enterprise. perhaps because of a certain understanding and previous carpentry work, the spare parts I made were more practical and beautiful than those made by others, so the workshop adjusted my work, mainly making spare parts and on-site renovation, to control running, running, dripping and leaking. According to the backward production technology at that time, we were able to clean up the workshop floor with mops and verify the equipment hygiene inspection with white gloves. The efforts we made can be imagined. It is also with the concerted efforts of all the staff that we have achieved very good results.
In January of 1990 , I was transferred to the Group's mechanical and electrical power plant to learn sheet metal technology from my master. That was the period of vigorous development after the formation of the group. The workload of plate making was very large, and it was also the best time for our young people to learn technology. Every day, I did a good job of lofting and marking, and went to rob the cutting gun and electric welding pliers, "forcing" the electric welder to teach me gas cutting and electric welding-due to the relatively fine division of labor at that time, the sheet metal worker was responsible for lofting, marking and patching. gas cutting and welding were all the work of the electric welder, and everyone's code had to be typed after the workpiece was completed and accepted. if the quality of gas cutting and welding was poor, the electric welder. In this way, after ten years of hard work, my technical level and organizational ability have been improved and recognized by my colleagues. 2001
1 , I became deputy director of the mechanical and electrical workshop. This is not only a change of position, but also a change of function. In the past, you only need to do it yourself. When you become a deputy director, you not only need to be able to do it yourself, but also lead the workshop staff to work hard, improve the overall skill level, and improve the maintenance. Quality and work efficiency. In those years, the technical transformation, maintenance, and repair of the old and waste in the mechanical and electrical workshop were carried out vividly and won a lot of praise. With the development of the peak, we have also got more and more room for development.
5 April 8 , I walked out of Jinhua with uneasy feelings and reported to Fuyang Jianfeng Dengcheng Cement Co., Ltd., the first stop of the peak "out of Jinhua to run cement", where there was our first new dry rotary kiln production line of the peak. When I came to a strange working environment, came into contact with a strange production process, and saw such a large equipment for the first time, I was a little shocked and soberly realized that I had to learn again. According to the work arrangement, I was initially responsible for the management of the mechanics. During that time, I followed the technicians of the equipment manufacturer to debug the machine every day, constantly learning and groping, and the concept of equipment management completely changed. In a few years, I have grown from a mechanic supervisor to an equipment engineer. The equipment management level of the enterprise is getting higher and higher. The effective operation rate and the control level of machine material consumption are in the forefront of peer enterprises.
2015
1 , I went out of Zhejiang and came to Yunnan Jianfeng Cement Co., Ltd. to take on the equipment preservation work of the whole enterprise. This is a new challenge for me. It happens that the enterprise is adjusting its management mode, from full participation in equipment management to security personnel responsible for equipment operation, maintenance, inspection and management. My work content has increased and my responsibilities have become heavier. To this end, I started from the aspects of working plan formulation, strengthening equipment inspection, carrying out predictive maintenance, training staff skills, improving maintenance quality, etc., and worked together with my colleagues, and the operation rate of the main engine increased year by year. I changed many positions and made some achievements in the peak
years, but what makes me more happy is my personal progress in this process. He entered the factory in 1988 , completed the Senior high school study of night school in 1992 , passed the senior worker in 1998 , was appraised as a technician in 2000 , obtained the junior college diploma in 2003 , was appraised as a senior technician in 2007 , and obtained the qualification of equipment engineer in 2009 , step by step, I grew up with the spikes. Here, I would like to sincerely thank the peak to give the platform, so that I can witness their growth, fully display their talents. In the days to come, I will work with my colleagues to make continuous efforts for the grand goal of "one hundred years peak! (Lou Xuxin)
More information
Peak re-listed China's top 100 cement production capacity Daye peak won the "smart factory leader"
On July 11-12, the 2022 China Cement Industry Summit and TOP100 Award Ceremony organized by China Cement Network, an authoritative media of China's cement industry, was held in Hangzhou. Jianfeng Group once again ranked among the top 100 cement clinker production capacity in China.
2022
08-04
On the afternoon of July 12, the party Committee of the group company held a special meeting attended by party Committee members, senior and middle-level management backbones, heads of grass-roots party organizations and all party members of the group headquarters to learn and convey the spirit of the 15th party congress of the communist party of China in Zhejiang province.
2022
07-24
On the morning of July 1, more than 40 members of the group's party committee, party members of various branches of the group headquarters, and party members of subordinate enterprise branches went to the Shuanglong Hydropower Station, the Red Education Base of Jinhua City, to receive party spirit and revolutionary tradition education.
2022
07-14
Vocational skill level identification examination!
On June 16 and 18, the theoretical and practical examinations for the determination of professional skill level in the peak pharmaceutical sector were held successively in Jinxi pharmaceutical factory. The independent identification of vocational skill level includes three occupations (types of work): pharmaceutical preparation worker, chemical inspector and organic synthesis worker, basically covering the main posts in the pharmaceutical sector, with a total of 125 employees signing up for the identification.
2022
06-21
On June 16, the Jianfeng Pharmaceutical Quality Research and Development Party Branch and the Jinhua Vocational Skills Management Service Center Party Branch held a signing ceremony in Jinxi Factory to establish a party building alliance.
2022
06-21
Jinhua Mayor Xing Zhihong to Peak Research
On the afternoon of June 1, Jinhua Mayor Xing Zhihong, Wucheng District Party Committee Secretary Gao Feng, District Mayor Hu Yuxian, and heads of the Municipal Economic and Information Bureau, Development and Reform Bureau and other departments went to the group headquarters to discuss and exchange with the leaders of the group company to understand the development of the enterprise. Solicit opinions and suggestions from enterprises on government work. After understanding the current business situation of the peak, Xing Zhihong pointed out that focus, follow the right path, frontier, steady, is the peak to long-term prosperity of the magic weapon, must continue to adhere.
2022
06-13