Elevator in distress
Release time:
2020-08-14
elevator distress
now in the city, high-rise residential everywhere. I live high, with good air, sunshine and quiet, but I am a little afraid of heights and dare not live too high, so I bought the tenth floor of a small high-rise building. The elevator goes straight up and down, which is very convenient. However, the elevator is, after all, a machine, but there is always something wrong with the machine, and it happened that I met it again.
The eighth day of the Lunar New Year is the first day of work after the holiday. I got up early in the morning and was extremely excited to think that I could see my colleagues again and receive the "open door bag. Into the elevator, looking at the floor lights "10 " "9 "... suddenly stopped at "8 " there motionless, the elevator also stopped. What's the situation? I hurriedly pressed the button on the elevator panel, hoping it would move. However, no matter how you press it, the indicator light still stops on the word "8 " and the elevator does not move. When I heard another elevator next to me opening and closing up and down, I was even more flustered. I patted the elevator door and shouted, "Help! I'm locked in the elevator." But there was silence outside the elevator, and my heart was cold. In the crosstalk of the Spring Festival Gala in
2017 , Jiang Kun fell into Tiger Cave. Just after the end of the year, I suffered a similar fate and was locked in the elevator. There are so many people in the crosstalk seeking a way to save Jiang Kun, but I am alone, saying that I should not do it every day, and that the land is not working. By the way, Jiang Kun can save himself with his mobile phone, and I should be able. I suddenly remembered that there was a phone number from the residential property management office in my mobile phone. I tried to dial it, but no one answered it for a long time. I was sweating all over my head. Then I thought, at this point in time, they should not have gone to work, what can I do?
By the way, there is also the phone number of the manager of the property management office in the phone, so it will definitely work if you ask her for help! This time, the phone was connected as soon as possible, but manager dong had a rest that day and could not come. however, she said that there was a maintenance phone posted in the elevator, which should be solved by contacting the maintenance personnel. Oh, thank God!
So, I dialed the maintenance phone again. After the master who answered the phone asked about the situation, he said that he could take self-help measures. As long as he pushed the door to both sides, the door opened. Is it true or not? At this time, I also don't care about true or false, let's give it a try.
I held my mobile phone in one hand and pressed the elevator door to push it to the side with the other. I exhausted my power. Finally, the door slowly opened and I saw the outside world again. I am busy on the phone with the master said thank you. From the tiger cave, oh no, from the elevator cage, I found myself covered in sweat.
took another elevator down to the first floor smoothly. as soon as we arrived at the gate of the community, the phone rang, and manager dong's concerned words reached his ear: "let you be frightened, we will repair the elevator as soon as possible." (Hong Zhiwei)
After reading the above story, many people may have doubts: What should I do to be rescued as soon as possible when I am locked in the elevator? Is the self-help method in the story reliable? Let's take a look at what experts say-
There is a national standard key to open the elevator. After a trapped person fails, it is relatively easy for professionals to open the car door with the key from the outside. If you are trapped in the elevator, the best way to ask for help is to press the emergency call button inside the elevator (this button is usually connected to the duty room or monitoring center), and wait for the rescue of professionals after explaining the situation.
If the alarm is invalid, you can beat the elevator door or call loudly to attract the attention of people passing by and ask for help through them.
There are various communication lines and power transmission lines in the elevator shaft, and passengers cannot determine the exact location of the elevator stop. Forcibly prying the door may face unpredictable dangers. For example, there are many factors for the elevator to stop suddenly, and it is very likely to start again. If the elevator starts abnormally when the door is pried, it will shear in severe cases, which is easy to cause personal injury. Therefore, many elevators will have tips such as "do not force the door to pry if the operation is abnormal". The self-rescue method in the story is absolutely undesirable!
Some movies and TV plays have trapped passengers escaping through the skylight at the top of the elevator. In fact, this is also extremely unsafe. Outside the skylight is a steel cable wire, accidentally electric shock or tripping is very dangerous. Therefore, when the elevator door cannot be opened temporarily, it must be assisted by professional rescue personnel. After the power is cut off, the trapped personnel can escape from the skylight.
Some people may worry that a faulty elevator may fall. In fact, the suspension system of an elevator is generally more than three wire ropes. Theoretically, the weight of one wire rope can bear the weight of the entire carriage, so only in very extreme Under the circumstances, uncontrollable free fall will occur. The anti-fall system composed of speed limiter, safety gear, buffer, etc., will also control the speed of the elevator to avoid a great impact on people.
In addition, the new national standard for elevators has strict regulations on ventilation efficiency, and there are gaps in the connection positions of the carriages, which are generally sufficient for people's breathing needs.
Therefore, like other types of dangers, once trapped in the elevator, you must not panic, take protective measures, minimize injuries, and calmly find a way out.
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30