Safety management is the foundation of enterprise
Release time:
2023-06-25
I am a safety management worker in Tianjin Jianfeng Natural Products Company. Someone once asked me, no accident is safe? Obviously not, no accident is a result, accident and safety is not relative, and risk and safety is relative. Therefore, safety management is to prevent and control risks, so that no safety accidents or minimize the loss caused by accidents.
Security risk exists objectively. It exists at any time and in any space. How to control the risk more effectively is a permanent issue of security management. The following four aspects are my core experience of safety management.
First of all, to effectively control risk, accountability and rules and regulations are the guidelines. The Safety Production Law proposes that production and business units must establish and improve the safety production responsibility system and safety production rules and regulations for all employees. Safety is the lifeline of an enterprise. The full responsibility system and the preparation of rules and regulations must be realistic. The system requires that while fully implementing laws, regulations, standards and norms, it must also be operable within the enterprise. Only in this way, the whole system from the scope of responsibility to the inspection and assessment can be fully and effectively implemented. The full safety responsibility system must be horizontal to the side and vertical to the end. From every department to every person, the full responsibility must be compacted by the management, especially the responsibility content of key positions, and the frequency of training should be increased.
Secondly, safety education and training is an important way of risk control and a concrete manifestation of the implementation of "safety first, prevention first. According to survey statistics, more than 90% of accidents are caused by unsafe behaviors of people. Failure to operate in accordance with operating procedures, ignoring safety, ignoring warning signs, incorrect use of labor protection equipment, venturing into dangerous areas, etc. are all human unsafe behaviors, and the most important way to prevent these unsafe behaviors is education and training. In safety education and training, we must resolutely overcome the coping tasks such as "scripted" and "borrowlism"; we must use various forms and fresh content to stimulate the enthusiasm of employees, activate the atmosphere of education and training, and appropriately carry out award-winning contests and other activities to increase the enthusiasm of employees in training and achieve better training results. In addition, the daily management process should also regularly check and assess education and training, check whether the relevant departments are carried out as scheduled in accordance with the annual training plan, check the implementation of the three-level education of employees, and urge relevant departments and personnel to complete education and training through assessment. The cost of safety training is very low, but the cost of accidents is very high. Only by earnestly implementing education and training can the overall quality of the workforce be improved. When employees master the knowledge of safety production, their natural safety awareness will be improved, and the possibility of accidents will be greatly improved. Reduced.
Third, do a good job in risk classification control and hidden danger investigation and management, and build two firewalls for safe production. Risk identification is the basis of risk classification and control. Enterprises should improve the ability of employees to identify and control risks through training. They should participate in all employees, the whole process and all directions, and make a list for each post to fully identify. Safety management personnel should scientifically and rigorously analyze each hazardous material, each hazardous equipment and each operation activity, and accurately prevent and control them after classification. The second firewall, hidden danger investigation and management should be organically integrated with risk classification and control. Through risk analysis and evaluation results, a list of hidden danger investigation should be formulated, a hidden danger investigation plan should be prepared, and hidden danger management should be carried out after hidden danger investigation, so as to eliminate hidden dangers from the source or reduce the possibility of accidents.
Fourth, do a good job in emergency management. In recent years, a large part of the many major accidents that have occurred in China is that they have not done a good job in emergency management, companies have not conducted drills, do not understand the handling methods of abnormal working conditions, and employees lack emergency knowledge, which has caused major disasters and brought huge disasters to families. The grief has brought huge losses to the enterprise. Therefore, enterprises should strengthen emergency management, focusing on the management of the four stages of prevention, preparation, accident response and recovery. The emergency rescue plan should be taken as the core, and the whole process of management should be carried out for all kinds of dangerous situations, dangerous events and accidents from the construction of emergency team, emergency material reserve, personnel education and training, plan drill, danger warning to accident emergency disposal. Through emergency drills, the emergency response ability and evacuation speed of employees are tested, the cooperative combat ability and level of each emergency team are improved, and various operation safety precautions, scientific rescue methods and skills are mastered. At the same time, the feasibility of the emergency plan is also tested. Provide a basis for revising the plan. Therefore, only by doing a good job in emergency management can we be fearless in the face of danger, deal with chaos, and build the last line of defense for enterprises to secure production safety.
Safety management is the foundation of an enterprise. It is advisable to take precautions before rain and dig wells before thirst. As a safety manager, we must always be in awe of safety management, and constantly explore new safety management ideas with a never-slack spirit, so as to provide a solid guarantee for the sustainable development of enterprises. (Tian Chenhui)
More information
The Sixth Plenary Session of the 18th Central Committee of the Communist Party of China was held in Beijing from October 24 to 27. It reviewed and approved the "Several Guidelines on Political Life within the Party under the New Situation" and the "Regulations on Inner-Party Supervision of the Communist Party of China. On November 22, the party committee of the group company successively held party committee and branch secretary meetings to learn the spirit of the sixth Plenary session of the 18th CPC Central Committee and put forward requirements for organizational construction and party member management. At the branch secretary meeting, Jiang Xiaomeng, secretary of the party committee of the group company, preached the main contents of "some guidelines on Inner-Party political Life under the New situation" and "regulations on Inner-Party Supervision of the Communist Party of China. He pointed out that seeking truth from facts, integrating theory with practice, keeping close ties with the masses, criticizing and self-criticism, democratic centralism, and strict party discipline are the basic norms and working principles of inner-party political life accumulated by the Communist Party of China for several generations. In the new social environment, some party members and cadres have bred some unhealthy atmosphere, which has damaged the image and interests of the party, the Sixth Plenary Session of the 18th Central Committee of the Communist Party of China proposed to strengthen and standardize the political life within the party, take the party constitution as the foundation, adhere to the party's political line, ideological line, organizational line and mass line, strive to enhance the political, contemporary, principled and fighting nature of the party's political life, and strive to enhance the party's ability of self purification, self improvement, self innovation and self improvement, Efforts should be made to improve the party's leadership and governance level, efforts should be made to safeguard the authority of the Party Central Committee, ensure the unity and unity of the party, maintain the advanced nature and purity of the party, and strive to form a centralized, democratic and disciplined party in the whole party
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-31
Jinxi plant environmental protection facilities through the completion of acceptance
On November 1, Jianfeng Pharmaceutical Jinxi Pharmaceutical Factory successfully obtained the approval from Zhejiang Environmental Protection Department that the environmental protection facilities of the project passed the completion acceptance, and a key work of Jianfeng Pharmaceutical in 2016 came to an end. Jianfeng Pharmaceutical's annual output of 35 tons of cephalosporins, anti-tumor drugs and other raw material production lines and various preparation production lines technological transformation projects started construction in Jinxi Development Zone in October 2012 and were almost completed in September 2015. The construction of the project strictly abided by the "three simultaneous" system of environmental protection, conscientiously implemented the requirements in the environmental impact assessment report and its approval documents, and invested 19.34 million yuan in environmental protection facilities. The plant has basically realized the separation of clean and sewage. A new wastewater treatment system with a daily treatment capacity of 700 cubic meters and a "physical, chemical and biochemical" treatment process has been built, and an online monitoring device networked with the environmental protection department has been installed. All kinds of production wastewater, public works wastewater and domestic sewage are treated by the wastewater station and sent to Jinxi Sewage Treatment Plant for centralized treatment; there is an RTO regenerative incineration device of 10000 cubic meters per hour and a centralized treatment device of 4000 cubic meters per hour for chlorine-containing organic waste gas. All kinds of waste gas are discharged after collection and treatment. In October 2015, with the approval of Jinhua Economic and Technological Development Zone Branch of Jinhua Environmental Protection Bureau, the trial production of Jinxi project was carried out. After more than half a year of operation, in early July 2016, Zhejiang Environmental Monitoring Center Station carried out completion acceptance monitoring of environmental protection treatment facilities such as waste water and waste gas of Jinxi Pharmaceutical Factory, and issued a completion acceptance monitoring report of environmental protection facilities at the end of August.
2020
07-30
Daye Jianfeng Safety Standard was awarded as the only award-winning enterprise in daye city in 2015.
Due to the achievements made in the establishment of secondary safety production standardization, daye peak cement company recently received a special award of 200000 yuan from daye municipal government. In order to encourage industrial and commercial enterprises in the region to improve their production safety, daye municipal government set up a special fund in 2015, stipulating that 200000 yuan will be awarded to those who pass the secondary safety standardization review before December 31, 2015. It is understood that among the industrial and commercial enterprises in daye city, there were 4 enterprises that applied for and passed the examination in 2015, but only daye peak passed the examination before December. Therefore, Daye Peak has become the only enterprise that has won the special award for the establishment of the safety standard in Daye City in 2015. (Ye Meifang)
2020
07-31
Two Cement Enterprises Start to Implement "Big Patrol Inspection"
With the change of the competition situation in the industry, the profit space of cement production enterprises has been greatly squeezed. Reducing costs and increasing efficiency and job optimization have become the inevitable choice to improve the enterprise's own development ability and enhance the core competitiveness. In accordance with the requirements of the group company to realize the transformation from extensive management to lean management, combined with the advanced experience of peer enterprises, recently, Yunnan peak, daye peak two enterprises have implemented "big inspection" to promote the overall optimization of posts. On November 1, daye peak post inspection officially started full operation, starting from the limestone storage yard at the source of the production line to the cement storage. the original 15 posts were merged, and the best experienced mechanics, electricians and post workers were transferred to form a large inspection class, which was mainly responsible for on-site emergency disposal and post routine maintenance to ensure the normal production of the whole production line. In order to ensure the smooth implementation of the large-scale inspection, daye peak management team has repeatedly communicated and discussed with the heads of relevant workshops and departments, and held a special workshop post optimization promotion meeting in September to clarify objectives and responsibilities, formulate implementation steps, and do a lot of preparatory work. At the kick-off meeting for the implementation of the large-scale inspection on October 31, Zhang Fengliang asked daye peak employees to recognize the current situation of serious cement overcapacity and cruel market competition, understand the necessity of implementing the large-scale inspection, and asked the workshop leaders to do a good job in training and guiding the employees, shorten the transition period, normalize the operation of the large-scale inspection as soon as possible, and at the same time, managers should also change their working ideas and concepts and do a good job in full-time, strengthen the inspection, overhaul and maintenance of the regular day shift, and find and solve the problems existing in the equipment and process in time.
2020
07-30